Entry  Wednesday, April 16, 2014, 17:08, Keith C Ng, ITE, Repair, , , 2a3 window - He leak check 
Helium leak checked 2a3 window after installing using remote line: 
- There was a leak found between the target and entrance module at the target pit, rate of 9E-6 atm-cc/sec.
- One test performed with the remote helium line to the window. There was a response but the leak detector was located above the window access
Entry  Monday, May 05, 2014, 10:40, Travis Cave, ITE, Standard Operation, TM3, TiC#4, module move 
TM#3 with TiC#4 has been moved from the east station to the south west silo.
Entry  Monday, May 05, 2014, 13:05, David Wang, ITE, Repair, TM3, , ITE target module flange seal has been replaced. 004.JPG008.JPG008.JPG007.JPG
ITE target module flange seal has been replaced.The flan surface and the o-ring groove have been cleaned with Acetone before the new seal is installed.
See attached picture.
Entry  Monday, May 05, 2014, 13:11, David Wang, ITE, Repair, TM3, , ITE Entrance module has been disconnected. 011.JPG025.JPG033.JPG035.JPG032.JPG
ITE entrance module has been disconnected and the lifting yoke is installed for module move. See attached pictures.
Entry  Tuesday, May 06, 2014, 14:05, Travis Cave, ITE, Standard Operation, , , module move 
The entrance module was out a new seal went in and then the entrance module went back, and then TM#3 went back. So all modules are now back in place
in the east target station.
Entry  Wednesday, May 07, 2014, 10:08, David Wang, ITE, Repair, TM3, , ITE entrance module flange seal had been replaced. 7x
ITE entrance module flange seal had been replaced yesterday.The flange and the seal groove were cleaned with Acetone before the new seal is installed.
See pictures
Entry  Wednesday, May 07, 2014, 10:15, David Wang, ITE, Repair, TM3, , ITE TM3, entrance module and BL2A3 window flange seals leak check.. 
ITE TM3, entrance module, and 2A3 window flange seals have been leak checked this morning after 2 new seals replacement.The LD base leak rate was 0.0xE-9
atm.cc/sec,  base pressure was 0.0 XE-4 Torr. I sprayed lots helium around the TM3, entrance module and 2A3 flange seals. No any response had been
found on LD during the  spraying. All three flanges are sealed perfectly now.
Entry  Wednesday, May 14, 2014, 19:01, Grant Minor, ITE, Maintenance, TM3, , HV short inspection at ITE 
Friedhelm Ames commented to me that there appears to be a short between High Voltage and Ground at TM3 at ITE.
Friedhelm, Anders and I initiated a survey by Andrew from RPG, and entered the Target Hall at approximately 5pm to visually assess the HV cover
at the MAA.  There was no clear indication of a problem.  We opted to wait for David to return as we weren't sure exactly what we were looking
Entry  Thursday, May 15, 2014, 14:38, David Wang, ITE, Repair, TM3, TM3, Bias short on ITE 
Anders and I opened the HV cover in ITE and did  a visual check inside ITE HV  cover and top of TM3.Bill was with us and took the pictures.
There was nothing obviously wrong when we opened the HV cover in ITE. We disconnected TM3 high current cables from ITE. Then we did an electrical check
on TM3.The TM3 was good and passed megga test (465Mohm at 500V). The module was good and was separated electrically from the ITE at that moment. Then,
Entry  Wednesday, July 02, 2014, 09:02, Travis Cave, ITE, Standard Operation, TM3, SiC#30, module move 
TM#3 with SiC#30 has been moved from the conditioning station to the east target station.
Entry  Wednesday, July 02, 2014, 14:29, David Wang, ITE, Standard Operation, , , Reconnected TM3 in ITE. 
I reconnected TM3 in ITE. All turbo pumps have been started. The water supply to TM3 only in ITE. The HV keys are back to electrical room.
Entry  Monday, July 07, 2014, 14:45, Grant Minor, ITE, Maintenance, TM3, SiC #30, FEBIAD gas line check ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg
There were some problems this morning with provision of FEBIAD gas to the the target at ITE.  It was suspected that the gas line was improperly
connected to the module, or that the valves at the module were not opened.
Remote Handling was asked to open the HV cover on TM3 at ITE and check the connection of the FEBIAD gas line.  Grant Minor, Maico Dalla Valle,
Entry  Tuesday, July 08, 2014, 09:57, David Wang, ITE, Standard Operation, TM3, , 5 Shielding blocks have been transferred from ITW to ITE. 
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam.
Entry  Tuesday, August 05, 2014, 10:40, Travis Cave, ITE, Standard Operation, , , module move 
ITE Entrance module has been moved back to the east station.
Entry  Tuesday, August 05, 2014, 11:53, David Wang, ITE, Repair, , , Reconnected ITE entrance module 
ITE entrance module is reconnected in ITE.
Entry  Monday, August 11, 2014, 14:30, David Wang, ITE, Standard Operation, TM4, UCx #10, TM4 is connected in ITE. 
TM4 is connected in ITE. All ITE  turbo pumps are started. I will check the pumping down process tomorrow morning. Everything is fine so far.
Entry  Wednesday, August 13, 2014, 12:21, David Wang, ITE, Repair, TM4, UCx10, ITE TP4S is replaced 
ITE TP4S was broken down last night . I stopped the ITE pumps and vented station with Argon this morning. Edi and I replaced the broken pump with a new
pump. The ITE is under roughing now.
Entry  Wednesday, August 20, 2014, 10:25, David Wang, ITE, Standard Operation, TM4, , 5 Shielding blocks have been transferred from ITW to ITE. 
5 Shielding blocks have been transferred from ITW to ITE. ITE  is configured to take proton beam.
 
Entry  Tuesday, September 23, 2014, 11:49, David Wang, ITE, Standard Operation, TM4, UCx #10, TM4 has been disconnected in ITE. 
TM4 has been disconnected and moved to SHC from ITE. ITE was vented with argon before move.
Entry  Wednesday, September 24, 2014, 10:41, Travis Cave, ITE, Standard Operation, TM4, Ta#44, module move 
TM#4 with Ta#44 has been moved from the south hot cell to the east target station.