2347
|
Tuesday, July 19, 2022, 11:53 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | SiC#43 Febiad | electrical check | A electrical check was done at NHC,
see the pic attached with please. |
|
|
2348
|
Thursday, July 21, 2022, 10:24 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check | A electrical check was done for TM2
with UCx#38 |
|
|
2349
|
Tuesday, July 26, 2022, 13:50 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | TM2 electrical check with Target and No external Connections | A standard electrical check was done
for TM2 after the short issue be fixed. |
|
|
2350
|
Wednesday, July 27, 2022, 08:11 |
Frank Song | ITW | Standard Operation | TM2 | UCx#38 | Module Connection | TM2 with Target UCx#38 was connected
in ITW. |
|
|
2352
|
Friday, July 29, 2022, 12:05 |
Carla Babcock | North Hot-Cell | Repair | TM2 | UCx#38 | Repair of UCx#38 EE short in ante room | UCx#38 developed a short between the plasma
electrode and the extraction electrode about
30mins after reaching full temperature in |
 |
|
2361
|
Tuesday, September 06, 2022, 13:58 |
Frank Song | ITW | Standard Operation | TM2 | UCx#38 | module disconnection | TM2 with Target UCx38 was disconnected
in ITW and moved to NHC |
|
|
2362
|
Tuesday, September 06, 2022, 14:05 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check after disconnection | An electrical was done on the NHC
for TM2 with spent Target UCx#38 on |
|
|
2363
|
Thursday, September 08, 2022, 07:20 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check | An electrical check was done on NHC
yesterday. |
|
|
2364
|
Thursday, September 08, 2022, 09:06 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx#39 | HS line helium pressure test. | TM2 with UCX#39 HS line helium pressure
test is done at TCS. 70 psi helium 3minutes.
No leak @0.0XE-9 atm.cc/sec. |
|
|
2365
|
Tuesday, September 13, 2022, 14:10 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | Module Connection | TM2 with UCx#39 is connected in ITW. |
|
|
2381
|
Tuesday, November 01, 2022, 12:37 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | disconnection | TM2 with spent target UCx#39 was
disconnected in ITW then moved to NHC. |
|
|
2382
|
Tuesday, November 01, 2022, 12:40 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check | TM2 with spent target UCx#39 had
an electric check in NHC.
After UCx 39# target was removed |
|
|
2383
|
Wednesday, November 02, 2022, 11:11 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#40 | electrical check | an electrical check was done on NHC, TM2
with new target UCx40 is ready moving to
TCS. |
|
|
2385
|
Thursday, November 03, 2022, 13:15 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx#40 | HS line helium pressure test. TM4 with UCx#40at TCS. | Helium 70 psi. tested 5minutes at base
leak rate 0.9 xE09 atm.cc/sec on HS line.
No leak. |
|
|
2387
|
Tuesday, November 15, 2022, 13:33 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | Module Connection | TM2 with UCx#40 is connected in ITW. |
|
|
2401
|
Friday, January 06, 2023, 10:38 |
David Wang | ITW | Standard Operation | TM2 | | ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test. | ITW
and TM2 primary and secondary vacuum |
|
|
2402
|
Monday, January 09, 2023, 14:19 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | TM2 with UCx40 disconnection in ITW | TM2 with target UCx40 was disconnected
in ITW and moved to NHC. |
|
|
2403
|
Tuesday, January 10, 2023, 10:15 |
Frank Song | Safe Module Parking | Standard Operation | TM2 | UCx40 removed | TM2 electrical check with no target attached on SW silo | TM2 with no target on SW silo be
electrical checked right after module moving. |
|
|
2442
|
Friday, May 19, 2023, 09:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | TiC#6 | leak/electrical check | TM2 with TiC#6 was checked on SHC,
see pic attached pls. |
|
|
2444
|
Wednesday, May 24, 2023, 08:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | TiC#6 | TM2 HS line helium pressure check and gasline fittins leak check. | TM2 HS line helium leak check is done.
leak detector base LR 1.8xE-8atm.cc/sec.
helium pressure 70 psi. 5 minutes test. no |
|