2230
|
Wednesday, June 30, 2021, 14:11 |
Matthew Gareau | North Hot-Cell | Standard Operation | | | North Hot Cell Commemorative Opening | Yesterday a bottle of Cava (sparkling
wine) was place, opened, and poured in the
NHC, to commemorate its new operational status. |
|
|
551
|
Wednesday, November 20, 2013, 08:50 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | NiO#2 | NiO#2 removed | NiO#2 has been removed from TM3 |
|
|
194
|
Tuesday, October 09, 2012, 13:44 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#5 | NiO#1 removal UCx#5 installation | NiO#1 was removed this morning.
UCx#5 was inserted into the hot cell
around 1 pm, installed and leak checked and |
|
|
1049
|
Wednesday, August 26, 2015, 10:55 |
chad fisher | South Hot-Cell | Repair | TM2 | ZrC#7 | New wiring and target | New wiring was installed yesterday as well
as ZrC#7 which had its high current fasteners
torqued to 130 in lbs. |
|
|
318
|
Wednesday, April 24, 2013, 09:00 |
Bevan Moss | Conditioning Station | Development | | | New user testing | Controls has created a new user group
that can operate the conditioning station
but cannot use any of the bypasses or forces. |
|
|
6
|
Tuesday, July 19, 2011, 11:52 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#36 | New target Ta#36 Installed on TM4 | Ta#36 has been installed on TM4 and is
awaiting leak and electrical check.
A small piece of the standard top |
|
|
1956
|
Monday, July 29, 2019, 16:17 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy LP SIS | New leak on EE water line while testing new In seals | Original Problem:
Leaks on the B and D copper blocks,
probably due to corrosion between the blocks |
|
|
1830
|
Wednesday, November 28, 2018, 07:04 |
David Wang | ITE | Development | TM4 | LpTa 56 | New high current flexible cables inspection after LpTa#56 beam run. | Inspected new high current flexible cables
during TM4 disconnection. The new cables
and adapters work fine. |
|
|
842
|
Wednesday, February 11, 2015, 13:13 |
chad fisher | South Hot-Cell | Maintenance | | | New gas bottle storage rack | The new gas bottle storage rack has been
installed by/for the south hot cell.
|
|
|
568
|
Wednesday, December 04, 2013, 11:15 |
David Wang | ITE | Repair | TM4 | | New bolts are installed on ITE TP3. | I installed 8 new bolts(3/8-16 UNC x1.25
STL) on the ITE TP3. The ITE TP3 replacement
job is done. Everything is connected back |
|
|
944
|
Friday, June 12, 2015, 07:49 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | New TM2 Source Tray Ground to HV Measurements | After bending and leak checking the new
measurements from ground to HV on the TM2
source tray are: |
|
|
2207
|
Monday, April 12, 2021, 13:45 |
Anders Mjos | Cooling | Maintenance | | | New T installed for instrumentation loop on HALCW system | Adrian and co installed a new T to be able
to add an instrument loop for O2 and pH monitoring
on the low conductivity water systtem (photo). |
|
|
2142
|
Thursday, August 27, 2020, 13:18 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | New Power Supply installed for TGHT | Arthur installed a new Magna Power PS for
the TGHT yesterday. The old power supply
has been moved to Evaporator 2. The power |
|
|
1755
|
Thursday, July 19, 2018, 09:17 |
chad fisher | South Hot-Cell | Repair | TM4 | | New Optics Tray Modification | The waterline loop bracket has been installed
onto the new loop holding bracket and both
installed onto the new source tray. |
|
|
2082
|
Thursday, March 12, 2020, 13:42 |
David Wang | ITE/ITW | Development | | | New ITE IGLIS cables installation | New IGLIS cables installation is done.
Two bundle of new cables are pulled from
ITE to electrical room. They are in one PVC |
|
|
203
|
Tuesday, November 06, 2012, 11:34 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | | Nb#7 Removal | Attached are pre-removal pictures of NB#7
and the inside face of the containment box
cover before cleaning. |
|
|
210
|
Thursday, November 08, 2012, 09:37 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Nb#7 Autopsy | Nb#7 was dismantled and ready for inspection. |
|
|
2627
|
Thursday, June 27, 2024, 09:49 |
David Wang | North Hot-Cell | Standard Operation | | Nb#10 | Nb#10target has been remotely transferred from NHC to SHC. | Nb#10target has been remotely transferred
from NHC to SHC. |
|
|
2668
|
Tuesday, August 20, 2024, 11:53 |
Carla Babcock | South Hot-Cell | Standard Operation | | Nb#10 | Nb#10 PIE | Nb#10 never worked online - repeller had
no effect on the beam and one of the RF wires
was touching HVC. Max 60pA was seen on the |
|
|
182
|
Tuesday, September 18, 2012, 13:47 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Nb #7 install Cover Baseline | Nb #7 was installed and tested today.
Inside face of the containment box
cover was cleaned with methanol and a baseline |
|