Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 182     Entry time: Tuesday, September 18, 2012, 13:47
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: Nb#7 
Subject: Nb #7 install Cover Baseline 

Nb #7 was installed and tested today.

Inside face of the containment box cover was cleaned with methanol and a baseline picture taken in an effort to track deposits and marking as requested bty Anders.

Attachment 1: IMG_3191.JPG  666 kB  | Show | Hide all
Attachment 2: IMG_3192.JPG  720 kB  | Show | Hide all
ELOG V2.9.2-2455