  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2283   Wednesday, January 05, 2022, 12:45 Frank SongITWMaintenanceTM2UC#36TM2 SIS with Target and No external Connections electrical checked in ITW  TM2_with_UCx36.jpg 
  2284   Thursday, January 06, 2022, 10:37 David WangITWStandard OperationTM2 ITW vacuum vessel and TM2 internal cooling lines leak check in pit. Frank  and I finished ITW and TM2 leak
check. TM2 internal water-cooling lines 
are leak free. They passed 70 psi helium
  
  2287   Monday, January 10, 2022, 12:38 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from ITW to NHC.Travis and Nadia moved TM2 from ITW to
NHC this morning. The move is smooth and
successful.
  
  2289   Tuesday, January 11, 2022, 11:51 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from NHC to SMP.TM2( no target ) has been moved  from
NHC to SMP.  The moving is smooth and
successful. 
  
  2291   Monday, January 17, 2022, 10:44 Frank SongSouth Hot-CellStandard OperationTM2UC#36 (the target removed)TM2 electrical check without Target. An electric check was done right
after module moving from SMP to SHC. 
 TM2_without_UCx36_at_SHC_(2).jpg 
  2313   Monday, April 04, 2022, 21:04 Carla BabcockConditioning StationDevelopmentTM2 HV testing of IGLIS wires in TM2TM2 is in the TCS without containment box
for HV testing following the installation
of the IGLIS wiring.
  
  2314   Wednesday, April 13, 2022, 11:54 Carla BabcockSouth Hot-CellMaintenanceTM2 EZL cable changeChad changed the EZL cable and plugs on
TM2. New cable runs along the cable trays.
 MicrosoftTeams-image_(25).png 
  2315   Thursday, April 21, 2022, 13:29 Frank SongSouth Hot-CellStandard OperationTM2Febiad TESTTM2 FEBIAD WITH A TEST TARGET A Test Febiad Target was installed
and checked at SHC. 
 TEST_FEBIAD_TARGET_E_CHECK.jpg 
  2316   Thursday, April 28, 2022, 07:24 Frank SongITWStandard OperationTM2Febiad Test TargetModule Connection TM2 was connected in ITW with a Febiad
Test Target. 
 module_connection_checklist20220426.jpg 
  2317   Thursday, April 28, 2022, 08:16 David WangITWStandard OperationTM2  Annual ITW water signal interlocks check .Annual ITW water signal interlocks check
was done with TM2 in ITW.   Water
signal interlocks on all water circuits related
  
  2326   Wednesday, May 25, 2022, 13:43 Frank SongITWStandard OperationTM2Febiad-Testmodule disconnection TM2 with a test target was disconnected
in ITW.
 tm2_disconnection.jpg 
  2327   Monday, June 06, 2022, 14:15 Frank SongSouth Hot-CellStandard OperationTM2SiC#42TM2 FEBIAD with Target and No external Connections An electrical check was done at SHC
for TM2 with FEBIAD SiC #42 Target. 
 TM2_with_FEBIAD_SiC_42_electrical_check.jpg 
  2328   Tuesday, June 07, 2022, 14:15 Frank SongITE/ITWStandard OperationTM2SiC#42Module Connection TM2 with Febiad target SiC#42 was
connected in ITW.
 TM2_with_sic_42_connected_in_ITW.jpg 
  2329   Thursday, June 09, 2022, 09:47 Matthew GareauSouth Hot-CellRepairTM2SiC#42containment box repair, Einzle lens, multi pinOn June 2 2022, while attempting to install
target SiC#42 a gasket fell off the water
line. I attempted to remove the target to
  
  2330   Monday, June 20, 2022, 11:00 Frank SongNorth Hot-CellRepairTM2SiC#42Failed Sic#42 electrical measurement at NHC An electrical check was done at NHC,
see attachment pls.
 Failed_Sic#42_electrical_measurement_at_NHC.jpg 
  2331   Monday, June 20, 2022, 18:03 Frank SongSouth Hot-CellStandard OperationTM2Sic#43electrical check TM2 with new target SiC#43 was electrical
checked at SHC. please see attachment.
 TM2_with_SiC43.jpg 
  2332   Tuesday, June 21, 2022, 15:36 Matthew GareauNorth Hot-CellRepairTM2SiC#42, SiC#43multipin guide pin issues While removing the SiC#42
it became apparent that the multipin guide
  
  2334   Tuesday, June 21, 2022, 18:30 Frank SongITWStandard OperationTM2SiC#43 FebiadModule Connection TM2 with Febiad Target SiC #43 was
connected in ITW. NOTE: the number of TARGET
in attached picture should be #43. 
 TM2_with_sic_42_connected_in_ITW.jpg 
  2337   Wednesday, June 22, 2022, 09:14 David WangSouth Hot-CellStandard OperationTM2SiC#42 and SiC#43. Three of TM2 moves related to SiC#42 to SiC #43 target switching job. Monday morning June 20th: TM2 with SiC
# 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target
  
  2346   Tuesday, July 19, 2022, 11:47 Frank SongITWStandard OperationTM2SiC#43 FebiadTM2 with SiC#43 disconnected in ITW  the module was disconnected in pit
and moved to NHC.
 TM2_with_SiC43_disconnection_in_ITW.jpg 