Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2287
Entry time:
Monday, January 10, 2022, 12:38
Author:
David Wang
Category:
North Hot-Cell
Type:
Standard Operation
Module:
TM2
Target/Number:
Subject:
TM2 has been moved from ITW to NHC.
Travis and Nadia moved TM2 from ITW to NHC this morning. The move is smooth and successful.
ELOG V2.9.2-2455