ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  2230   Wednesday, June 30, 2021, 14:11 Matthew GareauNorth Hot-CellStandard Operation  North Hot Cell Commemorative Opening Yesterday a bottle of Cava (sparkling
wine) was place, opened, and poured in the
NHC, to commemorate its new operational status.
  
  551   Wednesday, November 20, 2013, 08:50 chad fisherSouth Hot-CellStandard OperationTM3NiO#2NiO#2 removedNiO#2 has been removed from TM3  TM3_20131120.jpgTM3_20131120_2.jpg 
  194   Tuesday, October 09, 2012, 13:44 chad fisherSouth Hot-CellStandard OperationTM4UCx#5NiO#1 removal UCx#5 installationNiO#1 was removed this morning.
UCx#5 was inserted into the hot cell
around 1 pm, installed and leak checked and
 IMG_0780[1].JPG 
  1049   Wednesday, August 26, 2015, 10:55 chad fisherSouth Hot-CellRepairTM2ZrC#7New wiring and targetNew wiring was installed yesterday as well
as ZrC#7 which had its high current fasteners
torqued to 130 in lbs.
 20150826_090047.jpg 
  318   Wednesday, April 24, 2013, 09:00 Bevan MossConditioning StationDevelopment  New user testing Controls has created a new user group
that can operate the conditioning station
but cannot use any of the bypasses or forces.
  
  6   Tuesday, July 19, 2011, 11:52 chad fisherSouth Hot-CellStandard OperationTM4Ta#36New target Ta#36 Installed on TM4Ta#36 has been installed on TM4 and is
awaiting leak and electrical check.
A small piece of the standard top
 DSC_0897.JPGDSC_0899.JPGDSC_0901.JPGDSC_0905.JPG 
  1956   Monday, July 29, 2019, 16:17 Carla BabcockConditioning StationRepairTM4Dummy LP SISNew leak on EE water line while testing new In sealsOriginal Problem:
Leaks on the B and D copper blocks,
probably due to corrosion between the blocks
 13_PM.png15_PM.png 
  1830   Wednesday, November 28, 2018, 07:04 David WangITEDevelopmentTM4LpTa 56New high current flexible cables inspection after LpTa#56 beam run.Inspected new high current flexible cables
during TM4 disconnection. The new cables
and adapters work fine.
 new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPGnew_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG 
  842   Wednesday, February 11, 2015, 13:13 chad fisherSouth Hot-CellMaintenance  New gas bottle storage rackThe new gas bottle storage rack has been
installed by/for the south hot cell.
 
 20150211_115656.jpg 
  568   Wednesday, December 04, 2013, 11:15 David WangITERepairTM4 New bolts are installed on ITE TP3.I installed 8 new bolts(3/8-16 UNC x1.25 
STL) on the ITE TP3. The ITE TP3 replacement
job is done. Everything is connected back
  
  944   Friday, June 12, 2015, 07:49 chad fisherAssembly/Bench TestRepairTM2 New TM2 Source Tray Ground to HV MeasurementsAfter bending and leak checking the new
measurements from ground to HV on the TM2
source tray are:
  
  2207   Monday, April 12, 2021, 13:45 Anders MjosCoolingMaintenance  New T installed for instrumentation loop on HALCW systemAdrian and co installed a new T to be able
to add an instrument loop for O2 and pH monitoring
on the low conductivity water systtem (photo).
 MicrosoftTeams-image_(9).png 
  2142   Thursday, August 27, 2020, 13:18 Anders MjosConditioning StationMaintenanceTM2 New Power Supply installed for TGHTArthur installed a new Magna Power PS for
the TGHT yesterday. The old power supply
has been moved to Evaporator 2. The power
  
  1755   Thursday, July 19, 2018, 09:17 chad fisherSouth Hot-CellRepairTM4 New Optics Tray ModificationThe waterline loop bracket has been installed
onto the new loop holding bracket and both
installed onto the new source tray.
 20180719_TM4_2.jpg20180709_TM4.jpg 
  2082   Thursday, March 12, 2020, 13:42 David WangITE/ITWDevelopment  New ITE IGLIS cables installation New IGLIS cables installation is done.
Two bundle of new cables are pulled from
ITE to electrical room. They are in one PVC
  
  203   Tuesday, November 06, 2012, 11:34 chad fisherSouth Hot-CellStandard OperationTM1 Nb#7 RemovalAttached are pre-removal pictures of NB#7
and the inside face of the containment box
cover before cleaning.
 IMG_0797[1].JPGIMG_0798[1].JPGIMG_0799[1].JPG 
  210   Thursday, November 08, 2012, 09:37 chad fisherSouth Hot-CellStandard OperationTM1Nb#7Nb#7 AutopsyNb#7 was dismantled and ready for inspection.   
  2627   Thursday, June 27, 2024, 09:49 David WangNorth Hot-CellStandard Operation Nb#10Nb#10target has been remotely transferred from NHC to SHC. Nb#10target has been remotely  transferred
from NHC to SHC.  
  
  2668   Tuesday, August 20, 2024, 11:53 Carla BabcockSouth Hot-CellStandard Operation Nb#10Nb#10 PIENb#10 never worked online - repeller had
no effect on the beam and one of the RF wires
was touching HVC. Max 60pA was seen on the
  
  182   Tuesday, September 18, 2012, 13:47 chad fisherSouth Hot-CellStandard OperationTM1Nb#7Nb #7 install Cover BaselineNb #7 was installed and tested today.
Inside face of the containment box
cover was cleaned with methanol and a baseline
 IMG_3191.JPGIMG_3192.JPG 