ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2315   Thursday, April 21, 2022, 13:29 Frank SongSouth Hot-CellStandard OperationTM2Febiad TESTTM2 FEBIAD WITH A TEST TARGET A Test Febiad Target was installed
and checked at SHC. 
 TEST_FEBIAD_TARGET_E_CHECK.jpg 
  2316   Thursday, April 28, 2022, 07:24 Frank SongITWStandard OperationTM2Febiad Test TargetModule Connection TM2 was connected in ITW with a Febiad
Test Target. 
 module_connection_checklist20220426.jpg 
  2317   Thursday, April 28, 2022, 08:16 David WangITWStandard OperationTM2  Annual ITW water signal interlocks check .Annual ITW water signal interlocks check
was done with TM2 in ITW.   Water
signal interlocks on all water circuits related
  
  2326   Wednesday, May 25, 2022, 13:43 Frank SongITWStandard OperationTM2Febiad-Testmodule disconnection TM2 with a test target was disconnected
in ITW.
 tm2_disconnection.jpg 
  2327   Monday, June 06, 2022, 14:15 Frank SongSouth Hot-CellStandard OperationTM2SiC#42TM2 FEBIAD with Target and No external Connections An electrical check was done at SHC
for TM2 with FEBIAD SiC #42 Target. 
 TM2_with_FEBIAD_SiC_42_electrical_check.jpg 
  2328   Tuesday, June 07, 2022, 14:15 Frank SongITE/ITWStandard OperationTM2SiC#42Module Connection TM2 with Febiad target SiC#42 was
connected in ITW.
 TM2_with_sic_42_connected_in_ITW.jpg 
  2329   Thursday, June 09, 2022, 09:47 Matthew GareauSouth Hot-CellRepairTM2SiC#42containment box repair, Einzle lens, multi pinOn June 2 2022, while attempting to install
target SiC#42 a gasket fell off the water
line. I attempted to remove the target to
  
  2330   Monday, June 20, 2022, 11:00 Frank SongNorth Hot-CellRepairTM2SiC#42Failed Sic#42 electrical measurement at NHC An electrical check was done at NHC,
see attachment pls.
 Failed_Sic#42_electrical_measurement_at_NHC.jpg 
  2331   Monday, June 20, 2022, 18:03 Frank SongSouth Hot-CellStandard OperationTM2Sic#43electrical check TM2 with new target SiC#43 was electrical
checked at SHC. please see attachment.
 TM2_with_SiC43.jpg 
  2332   Tuesday, June 21, 2022, 15:36 Matthew GareauNorth Hot-CellRepairTM2SiC#42, SiC#43multipin guide pin issues While removing the SiC#42
it became apparent that the multipin guide
  
  2334   Tuesday, June 21, 2022, 18:30 Frank SongITWStandard OperationTM2SiC#43 FebiadModule Connection TM2 with Febiad Target SiC #43 was
connected in ITW. NOTE: the number of TARGET
in attached picture should be #43. 
 TM2_with_sic_42_connected_in_ITW.jpg 
  2337   Wednesday, June 22, 2022, 09:14 David WangSouth Hot-CellStandard OperationTM2SiC#42 and SiC#43. Three of TM2 moves related to SiC#42 to SiC #43 target switching job. Monday morning June 20th: TM2 with SiC
# 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target
  
  2346   Tuesday, July 19, 2022, 11:47 Frank SongITWStandard OperationTM2SiC#43 FebiadTM2 with SiC#43 disconnected in ITW  the module was disconnected in pit
and moved to NHC.
 TM2_with_SiC43_disconnection_in_ITW.jpg 
  2347   Tuesday, July 19, 2022, 11:53 Frank SongNorth Hot-CellStandard OperationTM2SiC#43 Febiadelectrical check A electrical check was done at NHC,
see the pic attached with please.
 e_check_for_TM2_with_SiC43_Febiad.jpg 
  2348   Thursday, July 21, 2022, 10:24 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check A electrical check was done for TM2
with UCx#38
 TM2_with_UCx38_echeck_on_NHC.jpg 
  2349   Tuesday, July 26, 2022, 13:50 Frank SongNorth Hot-CellStandard OperationTM2UCx#38TM2 electrical check with Target and No external Connections A standard electrical check was done
for TM2 after the short issue be fixed.
 TM2_with_UCx38_echeck_on_NHC.jpg 
  2350   Wednesday, July 27, 2022, 08:11 Frank SongITWStandard OperationTM2UCx#38Module Connection TM2 with Target UCx#38 was connected
in ITW.
 TM2_with_UCx38_connection_at_ITW.jpg 
  2352   Friday, July 29, 2022, 12:05 Carla BabcockNorth Hot-CellRepairTM2UCx#38Repair of UCx#38 EE short in ante roomUCx#38 developed a short between the plasma
electrode and the extraction electrode about
30mins after reaching full temperature in
 20220726_111649.jpg20220726_111641.jpg 
  2361   Tuesday, September 06, 2022, 13:58 Frank SongITWStandard OperationTM2UCx#38module disconnection TM2 with Target UCx38 was disconnected
in ITW and moved to NHC
 TM2_with_UCx38_disconnection_in_ITW.png 
  2362   Tuesday, September 06, 2022, 14:05 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check after disconnection  An electrical was done on the NHC
for TM2 with spent Target UCx#38 on
 TM2_electrical_check_on_NHC_with_spent_UCx38_on.png 