  2315   Thursday, April 21, 2022, 13:29 Frank SongSouth Hot-CellStandard OperationTM2Febiad TESTTM2 FEBIAD WITH A TEST TARGET

 A Test Febiad Target was installed and checked at SHC. 

Attachment 1: TEST_FEBIAD_TARGET_E_CHECK.jpg
TEST_FEBIAD_TARGET_E_CHECK.jpg
  2316   Thursday, April 28, 2022, 07:24 Frank SongITWStandard OperationTM2Febiad Test TargetModule Connection

 TM2 was connected in ITW with a Febiad Test Target. 

Attachment 1: module_connection_checklist20220426.jpg
module_connection_checklist20220426.jpg
  2317   Thursday, April 28, 2022, 08:16 David WangITWStandard OperationTM2  Annual ITW water signal interlocks check .

Annual ITW water signal interlocks check was done with TM2 in ITW.   Water signal interlocks on all water circuits related to TM and 2A beam lines in ITW work fine. 

  2326   Wednesday, May 25, 2022, 13:43 Frank SongITWStandard OperationTM2Febiad-Testmodule disconnection

 TM2 with a test target was disconnected in ITW.

Attachment 1: tm2_disconnection.jpg
tm2_disconnection.jpg
  2327   Monday, June 06, 2022, 14:15 Frank SongSouth Hot-CellStandard OperationTM2SiC#42TM2 FEBIAD with Target and No external Connections

 An electrical check was done at SHC for TM2 with FEBIAD SiC #42 Target. 

Attachment 1: TM2_with_FEBIAD_SiC_42_electrical_check.jpg
TM2_with_FEBIAD_SiC_42_electrical_check.jpg
  2328   Tuesday, June 07, 2022, 14:15 Frank SongITE/ITWStandard OperationTM2SiC#42Module Connection

 TM2 with Febiad target SiC#42 was connected in ITW.

Attachment 1: TM2_with_sic_42_connected_in_ITW.jpg
TM2_with_sic_42_connected_in_ITW.jpg
  2329   Thursday, June 09, 2022, 09:47 Matthew GareauSouth Hot-CellRepairTM2SiC#42containment box repair, Einzle lens, multi pin

On June 2 2022, while attempting to install target SiC#42 a gasket fell off the water line. I attempted to remove the target to have the gasket reattached, however the multi pin connector guide pin was loose and was preventing the target from being removed. During the attempt to remove the target it was noticed that an electrical cable in the back of the module had become loose and was dangling. The target was then secured to the module, and then the module was moved to the SHC to complete the job/repairs.

June 3 2022, containment box was removed, Einzle Lens cable reattached and tested, and the multi pin guide pin was retightened.

On June 6 2022, the containment box was damaged while lifting the containment box back onto the module.

The left rear corner of the box caught on the module and the corner weld snapped and folded the corner down about 90 degrees.

With help from Chad, we were able to restraighten the corner with a C-clamp, enabling the box to be reattached to the module.

However the 2 bolts that were on the corner that attach to the module were not able to be aligned and were not used.

The target was reattached to the module, and to save time was brought directly to ITW, skipping the conditioning station. 

  2330   Monday, June 20, 2022, 11:00 Frank SongNorth Hot-CellRepairTM2SiC#42Failed Sic#42 electrical measurement at NHC

 An electrical check was done at NHC, see attachment pls.

Attachment 1: Failed_Sic#42_electrical_measurement_at_NHC.jpg
Failed_Sic#42_electrical_measurement_at_NHC.jpg
  2331   Monday, June 20, 2022, 18:03 Frank SongSouth Hot-CellStandard OperationTM2Sic#43electrical check

 TM2 with new target SiC#43 was electrical checked at SHC. please see attachment.

Attachment 1: TM2_with_SiC43.jpg
TM2_with_SiC43.jpg
  2332   Tuesday, June 21, 2022, 15:36 Matthew GareauNorth Hot-CellRepairTM2SiC#42, SiC#43multipin guide pin issues

 While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from the module.

The multipin shoulder bolts were removed and then the multipin was able to be pried off.

However the NHC manipulator were not able to reach the guide pin to remove it, which would be required before the SiC#43 could be installed.

The target module was then moved to the SHC where the guide pin could be removed and the installation of SiC#43 took place, along with the transfer of the parasitic attachment onto the SiC#43.

This problem seems to suggest that the multipin could use some redesign to ensure smoother target exchanges.

  2334   Tuesday, June 21, 2022, 18:30 Frank SongITWStandard OperationTM2SiC#43 FebiadModule Connection

 TM2 with Febiad Target SiC #43 was connected in ITW. NOTE: the number of TARGET in attached picture should be #43. 

Attachment 1: TM2_with_sic_42_connected_in_ITW.jpg
TM2_with_sic_42_connected_in_ITW.jpg
  2337   Wednesday, June 22, 2022, 09:14 David WangSouth Hot-CellStandard OperationTM2SiC#42 and SiC#43. Three of TM2 moves related to SiC#42 to SiC #43 target switching job.

Monday morning June 20th: TM2 with SiC # 42 was moved from ITW to NHC.

Monday afternoon: TM2 with no target was moved from NHC to SHC due to 10 pin connector guide pin loose issue. The guide pin has to be moved out in SHC due to NHC manipulator configuration limit .

Monday afternoon: TM2 with SiC # 43 was moved from SHC  to ITW.

all module moves are smooth.

  2346   Tuesday, July 19, 2022, 11:47 Frank SongITWStandard OperationTM2SiC#43 FebiadTM2 with SiC#43 disconnected in ITW

 the module was disconnected in pit and moved to NHC.

Attachment 1: TM2_with_SiC43_disconnection_in_ITW.jpg
TM2_with_SiC43_disconnection_in_ITW.jpg
  2347   Tuesday, July 19, 2022, 11:53 Frank SongNorth Hot-CellStandard OperationTM2SiC#43 Febiadelectrical check

 A electrical check was done at NHC, see the pic attached with please.

Attachment 1: e_check_for_TM2_with_SiC43_Febiad.jpg
e_check_for_TM2_with_SiC43_Febiad.jpg
  2348   Thursday, July 21, 2022, 10:24 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check

 A electrical check was done for TM2 with UCx#38

Attachment 1: TM2_with_UCx38_echeck_on_NHC.jpg
TM2_with_UCx38_echeck_on_NHC.jpg
  2349   Tuesday, July 26, 2022, 13:50 Frank SongNorth Hot-CellStandard OperationTM2UCx#38TM2 electrical check with Target and No external Connections

 A standard electrical check was done for TM2 after the short issue be fixed.

Attachment 1: TM2_with_UCx38_echeck_on_NHC.jpg
TM2_with_UCx38_echeck_on_NHC.jpg
  2350   Wednesday, July 27, 2022, 08:11 Frank SongITWStandard OperationTM2UCx#38Module Connection

 TM2 with Target UCx#38 was connected in ITW.

Attachment 1: TM2_with_UCx38_connection_at_ITW.jpg
TM2_with_UCx38_connection_at_ITW.jpg
  2352   Friday, July 29, 2022, 12:05 Carla BabcockNorth Hot-CellRepairTM2UCx#38Repair of UCx#38 EE short in ante room

UCx#38 developed a short between the plasma electrode and the extraction electrode about 30mins after reaching full temperature in the conditioning station. The decision was made to bring it into the anteroom and try to clean it there.

To do this, it was uninstalled, the parasitic attachments were removed and it was brought into the ante room.

I removed the EE and the PE, and cleaned quite a lot of material from them both with methanol. I think put the ionizer foil bar down the ionizer to help dislodge any material there, and I also turned the target over and tapped gently to get any material out. The first two times some flakes came out, the third time nothing came out. I then reinstalled the electrodes using the EE alignment tool (not sure how successfully, didn't push it into the ionizer too much because I was worried about catching the Rh foil).

The taret was meggered at 500V then reinstalled and electrical checks were done. Everything looks back to normal. Conditioning in ITW was successful.

Attachment 1: 20220726_111649.jpg
20220726_111649.jpg
Attachment 2: 20220726_111641.jpg
20220726_111641.jpg
  2361   Tuesday, September 06, 2022, 13:58 Frank SongITWStandard OperationTM2UCx#38module disconnection

 TM2 with Target UCx38 was disconnected in ITW and moved to NHC

Attachment 1: TM2_with_UCx38_disconnection_in_ITW.png
TM2_with_UCx38_disconnection_in_ITW.png
  2362   Tuesday, September 06, 2022, 14:05 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check after disconnection

 An electrical was done on the NHC for TM2 with spent Target UCx#38 on

Attachment 1: TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
TM2_electrical_check_on_NHC_with_spent_UCx38_on.png