Entry  Monday, June 20, 2022, 18:03, Frank Song, South Hot-Cell, Standard Operation, TM2, Sic#43, electrical check TM2_with_SiC43.jpg
 TM2 with new target SiC#43 was electrical checked at SHC. please see attachment.
Entry  Tuesday, June 21, 2022, 15:36, Matthew Gareau, North Hot-Cell, Repair, TM2, SiC#42, SiC#43, multipin guide pin issues 
 While removing the SiC#42 it became apparent that the multipin guide pin had become loose
again and was not allowing the target to dismount from the module.
The multipin shoulder bolts were removed and then the multipin was able to be pried off.
Entry  Tuesday, June 21, 2022, 18:30, Frank Song, ITW, Standard Operation, TM2, SiC#43 Febiad, Module Connection TM2_with_sic_42_connected_in_ITW.jpg
 TM2 with Febiad Target SiC #43 was connected in ITW. NOTE: the number of TARGET in attached picture should be #43. 
Entry  Wednesday, June 22, 2022, 09:14, David Wang, South Hot-Cell, Standard Operation, TM2, SiC#42 and SiC#43. , Three of TM2 moves related to SiC#42 to SiC #43 target switching job.  
Monday morning June 20th: TM2 with SiC # 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target was moved from NHC to SHC due to 10 pin connector guide pin loose issue. The guide pin has to be moved out
in SHC due to NHC manipulator configuration limit .
Entry  Tuesday, July 19, 2022, 11:47, Frank Song, ITW, Standard Operation, TM2, SiC#43 Febiad, TM2 with SiC#43 disconnected in ITW  TM2_with_SiC43_disconnection_in_ITW.jpg
 the module was disconnected in pit and moved to NHC.
Entry  Tuesday, July 19, 2022, 11:53, Frank Song, North Hot-Cell, Standard Operation, TM2, SiC#43 Febiad, electrical check e_check_for_TM2_with_SiC43_Febiad.jpg
 A electrical check was done at NHC, see the pic attached with please.
Entry  Thursday, July 21, 2022, 10:24, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, electrical check TM2_with_UCx38_echeck_on_NHC.jpg
 A electrical check was done for TM2 with UCx#38
Entry  Tuesday, July 26, 2022, 13:50, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, TM2 electrical check with Target and No external Connections TM2_with_UCx38_echeck_on_NHC.jpg
 A standard electrical check was done for TM2 after the short issue be fixed.
Entry  Wednesday, July 27, 2022, 08:11, Frank Song, ITW, Standard Operation, TM2, UCx#38, Module Connection TM2_with_UCx38_connection_at_ITW.jpg
 TM2 with Target UCx#38 was connected in ITW.
Entry  Friday, July 29, 2022, 12:05, Carla Babcock, North Hot-Cell, Repair, TM2, UCx#38, Repair of UCx#38 EE short in ante room 20220726_111649.jpg20220726_111641.jpg
UCx#38 developed a short between the plasma electrode and the extraction electrode about 30mins after reaching full temperature in the conditioning station.
The decision was made to bring it into the anteroom and try to clean it there.
To do this, it was uninstalled, the parasitic attachments were removed and it was brought into the ante room.
Entry  Tuesday, September 06, 2022, 13:58, Frank Song, ITW, Standard Operation, TM2, UCx#38, module disconnection TM2_with_UCx38_disconnection_in_ITW.png
 TM2 with Target UCx38 was disconnected in ITW and moved to NHC
Entry  Tuesday, September 06, 2022, 14:05, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, electrical check after disconnection  TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
 An electrical was done on the NHC for TM2 with spent Target UCx#38 on
Entry  Thursday, September 08, 2022, 07:20, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check TM2_with_UCx#39_E_Check.png
 An electrical check was done on NHC yesterday.
Entry  Thursday, September 08, 2022, 09:06, David Wang, Conditioning Station, Standard Operation, TM2, UCx#39, HS line helium pressure test. 
TM2 with UCX#39 HS line helium pressure test is done at TCS. 70 psi helium 3minutes. No leak @0.0XE-9 atm.cc/sec. 
Entry  Tuesday, September 13, 2022, 14:10, Frank Song, ITW, Standard Operation, TM2, UCx#39, Module Connection TM2_with_UCx#39_connection_in_ITW.png
 TM2 with UCx#39 is connected in ITW.
Entry  Tuesday, November 01, 2022, 12:37, Frank Song, ITW, Standard Operation, TM2, UCx#39, disconnection TM2_with_UCx39_disconnection_in_ITW.png
 TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC.
Entry  Tuesday, November 01, 2022, 12:40, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png
 TM2 with spent target UCx#39 had an electric check in NHC.
After UCx 39# target was removed out., I did electrical check on TM2.   @500 V B to C is 5M ohm. all Others between are above 25Mohm.
HV to Chasis is 650Mohm.  A to P is still short. 
Entry  Wednesday, November 02, 2022, 11:11, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#40, electrical check TM2_with_UCx40_electrical_check_on_NHC.png
an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.
Entry  Thursday, November 03, 2022, 13:15, David Wang, Conditioning Station, Standard Operation, TM2, UCx#40, HS line helium pressure test. TM4 with UCx#40at TCS. 
Helium 70 psi. tested 5minutes at base leak rate 0.9 xE09 atm.cc/sec on HS line.  No leak.
Entry  Tuesday, November 15, 2022, 13:33, Frank Song, ITW, Standard Operation, TM2, UCx#40, Module Connection TM2_with_UCx#40_connection_in_ITW.png
 TM2 with UCx#40 is connected in ITW.