Entry  Wednesday, January 05, 2022, 12:45, Frank Song, ITW, Maintenance, TM2, UC#36, TM2 SIS with Target and No external Connections TM2_with_UCx36.jpg
 electrical checked in ITW
Entry  Thursday, January 06, 2022, 10:37, David Wang, ITW, Standard Operation, TM2, , ITW vacuum vessel and TM2 internal cooling lines leak check in pit.  
Frank  and I finished ITW and TM2 leak check. TM2 internal water-cooling lines  are leak free. They passed 70 psi helium pressure test. We found some
 small leaks on ITW primary and secondary vacuum vessel. I list them  here:

    Exit  module 2 service cap top plate to cap body O-ring at SW corner. Leak  rate 2XE-8 atm.cc/sec. It is an old leak we found
Entry  Monday, January 10, 2022, 12:38, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from ITW to NHC. 
Travis and Nadia moved TM2 from ITW to NHC this morning. The move is smooth and successful.
Entry  Tuesday, January 11, 2022, 11:51, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from NHC to SMP. 
TM2( no target ) has been moved  from NHC to SMP.  The moving is smooth and successful. 
Entry  Monday, January 17, 2022, 10:44, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36 (the target removed), TM2 electrical check without Target. TM2_without_UCx36_at_SHC_(2).jpg
 An electric check was done right after module moving from SMP to SHC. 
Entry  Monday, April 04, 2022, 21:04, Carla Babcock, Conditioning Station, Development, TM2, , HV testing of IGLIS wires in TM2 
TM2 is in the TCS without containment box for HV testing following the installation of the IGLIS wiring.
Not great results so far - sat at 42.5kV for nearly 2 hours, current around 200uA and occasional sparks. I did not have time to go higher, will
do this tomorrow. The sparks could be conditioning but it looks a bit suspicious to me. We will see if the ramp up tomorrow is very easy and how high we
Entry  Wednesday, April 13, 2022, 11:54, Carla Babcock, South Hot-Cell, Maintenance, TM2, , EZL cable change MicrosoftTeams-image_(25).png
Chad changed the EZL cable and plugs on TM2. New cable runs along the cable trays.
Entry  Thursday, April 21, 2022, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM2, Febiad TEST, TM2 FEBIAD WITH A TEST TARGET TEST_FEBIAD_TARGET_E_CHECK.jpg
 A Test Febiad Target was installed and checked at SHC. 
Entry  Thursday, April 28, 2022, 07:24, Frank Song, ITW, Standard Operation, TM2, Febiad Test Target, Module Connection module_connection_checklist20220426.jpg
 TM2 was connected in ITW with a Febiad Test Target. 
Entry  Thursday, April 28, 2022, 08:16, David Wang, ITW, Standard Operation, TM2, , Annual ITW water signal interlocks check . 
Annual ITW water signal interlocks check was done with TM2 in ITW.   Water signal interlocks on all water circuits related to TM and 2A beam
lines in ITW work fine.  
Entry  Wednesday, May 25, 2022, 13:43, Frank Song, ITW, Standard Operation, TM2, Febiad-Test, module disconnection tm2_disconnection.jpg
 TM2 with a test target was disconnected in ITW.
Entry  Monday, June 06, 2022, 14:15, Frank Song, South Hot-Cell, Standard Operation, TM2, SiC#42, TM2 FEBIAD with Target and No external Connections TM2_with_FEBIAD_SiC_42_electrical_check.jpg
 An electrical check was done at SHC for TM2 with FEBIAD SiC #42 Target. 
Entry  Tuesday, June 07, 2022, 14:15, Frank Song, ITE/ITW, Standard Operation, TM2, SiC#42, Module Connection TM2_with_sic_42_connected_in_ITW.jpg
 TM2 with Febiad target SiC#42 was connected in ITW.
Entry  Thursday, June 09, 2022, 09:47, Matthew Gareau, South Hot-Cell, Repair, TM2, SiC#42, containment box repair, Einzle lens, multi pin 
On June 2 2022, while attempting to install target SiC#42 a gasket fell off the water line. I attempted to remove the target to have the gasket reattached,
however the multi pin connector guide pin was loose and was preventing the target from being removed. During the attempt to remove the target it was noticed
that an electrical cable in the back of the module had become loose and was dangling. The target was then secured to the module, and then the module was
Entry  Monday, June 20, 2022, 11:00, Frank Song, North Hot-Cell, Repair, TM2, SiC#42, Failed Sic#42 electrical measurement at NHC Failed_Sic#42_electrical_measurement_at_NHC.jpg
 An electrical check was done at NHC, see attachment pls.
Entry  Monday, June 20, 2022, 18:03, Frank Song, South Hot-Cell, Standard Operation, TM2, Sic#43, electrical check TM2_with_SiC43.jpg
 TM2 with new target SiC#43 was electrical checked at SHC. please see attachment.
Entry  Tuesday, June 21, 2022, 15:36, Matthew Gareau, North Hot-Cell, Repair, TM2, SiC#42, SiC#43, multipin guide pin issues 
 While removing the SiC#42 it became apparent that the multipin guide pin had become loose
again and was not allowing the target to dismount from the module.
The multipin shoulder bolts were removed and then the multipin was able to be pried off.
Entry  Tuesday, June 21, 2022, 18:30, Frank Song, ITW, Standard Operation, TM2, SiC#43 Febiad, Module Connection TM2_with_sic_42_connected_in_ITW.jpg
 TM2 with Febiad Target SiC #43 was connected in ITW. NOTE: the number of TARGET in attached picture should be #43. 
Entry  Wednesday, June 22, 2022, 09:14, David Wang, South Hot-Cell, Standard Operation, TM2, SiC#42 and SiC#43. , Three of TM2 moves related to SiC#42 to SiC #43 target switching job.  
Monday morning June 20th: TM2 with SiC # 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target was moved from NHC to SHC due to 10 pin connector guide pin loose issue. The guide pin has to be moved out
in SHC due to NHC manipulator configuration limit .
Entry  Tuesday, July 19, 2022, 11:47, Frank Song, ITW, Standard Operation, TM2, SiC#43 Febiad, TM2 with SiC#43 disconnected in ITW  TM2_with_SiC43_disconnection_in_ITW.jpg
 the module was disconnected in pit and moved to NHC.