Wednesday, October 14, 2015, 14:49, David Wang, South Hot-Cell, Standard Operation, TM2, , Install new high current cables to TM2
|
I installed a set of new high current cables for TM2 Febiad run. The top of TM2 is configured to Febiad mode. See attachments |
Thursday, October 15, 2015, 08:07, David Wang, South Hot-Cell, Standard Operation, TM2, no target, TM2 no target electrical check at SHC.
|
I did a TM2 no target electrical check at SHC this morning. A to RU at 500v is 250K which is low. anode- x pin is dead short to 60kv
bias. RU is dead short to 60kv bias( as before). see attachment |
Monday, November 16, 2015, 08:04, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015
|
Update TH schedule according to changes. See attachment 1,2 .
update TH schedule weekly. See attachments 3,4 |
Monday, November 16, 2015, 10:37, David Wang, Conditioning Station, Repair, TM3, , TM3 has been disconnected at TCS.
|
I stopped the TM3 and TCS vacuum pumps and water system. The TM3 is disconnected and vented. It will be moved to silo this afternoon. |
Thursday, November 26, 2015, 06:25, David Wang, Conditioning Station, Standard Operation, TM4, UC#14, TM4 vacuum has been connected in TCS.
|
TM4 vacuum has been connected in TCS. All vacuum pumps were started yesterday. The pumping down of TM4 and TCS are good so far. |
Thursday, November 26, 2015, 07:34, David Wang, Conditioning Station, Standard Operation, TM4, UC#14, Helium pressure test on TM4 HS line at CS
|
I did helium pressure test on TM4 HS line at TCS this morning. 70psi helium 3 minutes, 0.0xE-9 atm.cc/sec base leak rate. No response. No leak. |
Thursday, November 26, 2015, 07:37, David Wang, Conditioning Station, Standard Operation, TM4, UC#14, TM4 has been connected at CS
|
TM4 has been connected at TCS. The water system is started. The TCS HV cover for TM4 is installed also. Basically, The TM4 is ready for conditioning. |
Monday, November 30, 2015, 11:46, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015
|
Weekly update TH schedule according to changes. see attachment 1,2 .
Update TH schedule before the weekend. see attachment 3,4 |
Tuesday, December 01, 2015, 06:41, David Wang, Conditioning Station, Standard Operation, TM4, UC#14, Turned off TCS all vacuum pumps and water pumps.
|
I turned off TCS vacuum and water pumps. The TSC and TM4 are still under vacuum condition. |
Tuesday, December 01, 2015, 14:30, David Wang, ITE, Standard Operation, TM4, UCx 13, TM4 has been connected in ITE
|
TM4 has been connected in ITE. All turbo-pumps are started. Everything is good so far. |
Friday, January 22, 2016, 14:24, David Wang, South Hot-Cell, Standard Operation, , , 2016 Winter Shut Down Target Hall Schedule (sketch)
|
Post a sketch of 2016 winter shut down target hall schedule. see attachment 1,2
UPDATE THE SCHEDULE ACCORDING TO CYCLOTRON SIDE JOB. SEE ATTACHMENTS 3,4 |
Friday, February 12, 2016, 13:00, David Wang, Conditioning Station, Standard Operation, , , 2016 Winter Shut Down Target Hall Schedule 6x
|
2016 Winter shut down target hall schedule. See attachments1,2.
update the schedule weekly. Everything is on time so far. see attachment 3,4.
Update the schedule according to beam new beam schedule and target process. see attachment 5,6 |
Thursday, February 25, 2016, 06:48, David Wang, ITE, Standard Operation, , , 4 Shielding blocks have been transferred from ITE to block storage area.
|
Dan and I transferred 4 shielding blocks from ITE to block storage area. The ITE pit is opened now. |
Thursday, February 25, 2016, 06:52, David Wang, Conditioning Station, Standard Operation, , , stop CS vacuum pumps.
|
I stopped the conditioning station vacuum pumps. The CS is still under vacuum without venting. |
Thursday, February 25, 2016, 09:27, David Wang, ITW, Standard Operation, TM2, , TM2 has been disconnected in ITW
|
TM2 has been disconnected in ITW (except vacuum lines). The vacuum system is still operating. |
Thursday, February 25, 2016, 09:29, David Wang, ITE, Standard Operation, TM4, , TM4 has been disconnected in ITE.
|
TM4 has been disconnect in ITE(except vacuum lines). The ITE vacuum system is still operating. |
Wednesday, March 02, 2016, 09:51, David Wang, ITW, Standard Operation, TM2, , all water lines on TM2 and TM4 are purged.
|
All water lines on TM2 and TM4 are purged for upcoming water lines helium pressure test. |
Wednesday, March 02, 2016, 10:04, David Wang, ITW, Standard Operation, TM2, , Leak check on ITW and TM2.
|
Dan and I leak checked TM2 and ITW primary vacuum vessel. It was found a 1X E-7 atm.cc/sec leak on top T flange seal between TM2 and dump module in first
time check. But it is not a repeatable leak. I checked the same spot and around area two more times with increased helium volume.It did not show up again.
The first response could be a helium drift to dry scroll pump. I will check it again later. The primar vacuum vessel on ITW and TM2 are leak free. |
Friday, March 04, 2016, 12:34, David Wang, ITE, Standard Operation, TM4, , TM4 ITE annual leak check
|
Dan and I finished TM4 and ITE annual leak check on primary and secondary vacuum vessel. We found one leak on a KF25 blank off which is located
on the top of the service cap. It is a low E-7 atm.cc/sec range leak. But, it is very close to turbo-pumps so ITE IG1 and other gauges are not affected
by it very much. It is an easy fix. TheKF -25 center ring on the blank off will be replaced after vent . It be will leak checked again at CS |
Friday, March 04, 2016, 13:58, David Wang, Conditioning Station, Standard Operation, , , 2016 Winter Shut Down Target Hall Schedule 8x
|
Update Schedule according to changes.See attachment1, 2.
Re-post it after some minor correction See attachment 3,4.
Update schedule according changes. See attachments 5,6 |
|