Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1086     Entry time: Tuesday, September 29, 2015, 12:31
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#46 
Subject: TM4 has been connected in ITE 

Dan and I connected TM4 in ITE. The turbo- pumps are started. Water supply to TM4 only at this stage. Everything is good so far.

ELOG V2.9.2-2455