ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
1485
|
Monday, April 10, 2017, 11:23 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the conditioning
station to the north west silo. There
was a slight delay in the move as the limits |
|
1490
|
Wednesday, April 12, 2017, 09:20 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Module move | TM#3 is now in the south hot cell. |
|
1492
|
Wednesday, April 12, 2017, 13:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical Check | Electrical check of TM#3 with no target
at the south hot cell |
|
1493
|
Wednesday, April 12, 2017, 16:39 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 Inspection at the South Hot Cell | Found spark signs on TM3's containment
on the side of the water blocks. They may
be OLD or/and NEW sparking signs, but this |
|
1506
|
Wednesday, April 26, 2017, 10:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the south hot cell. |
|
1509
|
Wednesday, April 26, 2017, 17:37 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 HV tests at atmosphere Pictures from April 19-21, 2017 |
Please see the first two pictures
of the HV test at atmosphere done on April |
|
1510
|
Wednesday, April 26, 2017, 17:55 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 Schedule updates at the South Hot Cell and CS | Please see TM3's Updated Schedule (the
current schedule) at the SHC and TCS.
For the record I am uploading TM3's |
|
1512
|
Thursday, April 27, 2017, 19:59 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 HV tests at atmosphere for Each Line(s) April 27, 2017 | Today a HV test at atmosphere was performed
for Each Line(s), while floating the other
lines. |
|
1514
|
Sunday, April 30, 2017, 20:57 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 May 1-15, 2017 Tentative Schedule at the SHC and TCS | Please see attachment for TM3 May 1-15,
2017 Tentative Schedule at the SHC and TCS. |
|
1520
|
Tuesday, May 02, 2017, 18:33 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 HV tests at atmosphere for Each Line(s) after the Fiber Glass removal May 2, 2017 | Today a HV test at atmosphere was performed
for Each Line(s), while floating the other
lines. THIS TEST AT ATMOSPHERE IS THE FIRST |
|
1522
|
Thursday, May 04, 2017, 19:10 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | no target | TM3 HV test at TCS up to 50kV | Today TM3 was conditioned up to 50kV. At
50kV sparking started and to go higher in
voltage it needs more conditioning time. |
|
1525
|
Friday, May 05, 2017, 19:36 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | no target | TM3 HV test at TCS up to 65kV | Today TM3 HV conditioning went up to 65kV.
I'll leave it here over night. ISAC OPS have
instructions to keep an alarm on the HV, |
|
1526
|
Saturday, May 06, 2017, 13:30 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | no target | TM3 current limiting | Today the voltage was raised from 65kV
to 65.7kV. After about 10min at this level
TM3 started current limiting. TM3 was not |
|
1583
|
Thursday, July 13, 2017, 10:53 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the conditioning station. |
|
1588
|
Monday, July 31, 2017, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved back to the NE
silo from the conditioning station. |
|
1611
|
Friday, September 08, 2017, 11:20 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the conditioning station. |
|
1616
|
Friday, September 15, 2017, 14:12 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved back to the silo
from the conditioning station. |
|
1623
|
Friday, September 22, 2017, 11:00 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check | Electrical check of TM#2 after the insulator
change on thursday september 21. |
|
1699
|
Tuesday, April 10, 2018, 10:43 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#2 has been moved from the south
hot cell to the south west silo. |
|
1708
|
Thursday, May 03, 2018, 08:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical Check | The results of yesterdays electrical
check of TM#4 with no target attached. See
the attached PDF for details. |
|