Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1485     Entry time: Monday, April 10, 2017, 11:23
Author: Travis Cave 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM1 
Target/Number: no target 
Subject: Module move 

 TM#1 has been moved from the conditioning station to the north west silo.  There was a slight delay in the move as the limits for the hoist drum got way out of whack and had to be adjusted.

ELOG V2.9.2-2455