Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1525     Entry time: Friday, May 05, 2017, 19:36
Author: Aurelia Laxdal 
Category: Conditioning Station 
Type: Repair 
Module: TM3 
Target/Number: no target 
Subject: TM3 HV test at TCS up to 65kV 

Today TM3 HV conditioning went up to 65kV. I'll leave it here over night. ISAC OPS have instructions to keep an alarm on the HV, and ion gauge and turbo pump (TP2 tripped 3 times due to sparking).

ELOG V2.9.2-2455