ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
362
|
Monday, May 27, 2013, 10:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Pumps Started HV testing to follow | The pumps have been turned on at ~9:30
this morning. Current values are 6.61 Mohm
TCS:DIC1 @19.4 C. HV testing will start momentarily. |
|
363
|
Monday, May 27, 2013, 10:37 |
Bevan Moss | Conditioning Station | Maintenance | TM4 | | Cooling Systems topped off | Rob walker has flushed and refilled the
primary side of the system (note the water
still looks nasty). This morning the primary |
|
367
|
Monday, May 27, 2013, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | HV conditioning | The HV conditioning reached a maximum
of 44kV today before a spark took out the
canbus card. I will attach the data once |
|
368
|
Monday, May 27, 2013, 16:36 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta#40 | Argon Venting Started | Argon venting has started. It will
be left to vent over night. |
|
369
|
Tuesday, May 28, 2013, 10:37 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta #40 moved from the conditioning
station to the east target station, move
went well. |
|
370
|
Tuesday, May 28, 2013, 10:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Electrical check | Results of the electrical check on
TM#4 with Ta#40, it passed. See attached
PDF for results. |
|
371
|
Wednesday, May 29, 2013, 06:32 |
David Wang | ITE | Standard Operation | TM4 | Ta#40 | TM4 has been connected in ITE. | TM4 has been connected in ITE. The pumping
down is fine so far.TM4 water interlock check
was done yesterday. |
|
374
|
Tuesday, June 04, 2013, 12:36 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks are transferred from ITW to ITE | Dan an I transferred 5 shielding
blocks from ITW to ITE. The ITE is configured
to take proton beam. |
|
400
|
Tuesday, July 16, 2013, 13:09 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been disconnected in ITE. | TM4 has been disconnected in ITE. All water
lines on TM4 have been purged. ITE is venting
now. |
|
405
|
Tuesday, July 23, 2013, 10:55 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta#40 has been moved from the
east target station to the south hot cell
move went well. |
|
406
|
Tuesday, July 23, 2013, 13:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Electrical check | Results of electrical check on Ta#40 target
on TM#4 post beam at the south hot cell |
|
407
|
Wednesday, July 24, 2013, 08:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check | Electrical check on TM#4 with SiC#29 has
been done. The reading of the magnet coil
and 60kV common is low at 750 ohms, normally |
|
408
|
Wednesday, July 24, 2013, 14:40 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#29 | module move | TM#4 with SiC#29 has been moved from the
south hot cell to the conditioning station
move went well. |
|
409
|
Wednesday, July 24, 2013, 17:46 |
David Wang | Conditioning Station | Standard Operation | TM4 | Sic 29# | Started 3 turbo pumps on CS for TM4 | 3 turbo pumps on TM4 and CS have been started.
The pumping down is good so far, The TM4
PNG1 reading is more than 10 times higher |
|
410
|
Thursday, July 25, 2013, 09:37 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#29 | Electrical check | Electrical check of TM#4 with SiC#29 attached.
Results are pretty much the same as yesterday
for the coil to 60kV common, and anode to |
|
411
|
Thursday, July 25, 2013, 10:08 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #29 | TM4 HS helium pressure test andTM4 connection at CS | Bevan and I did a helium pressure test
on TM4 HS water circuit at CS. The leak detector
is pumped to the bottom scale(E-9 atm.cc/sec |
|
414
|
Tuesday, July 30, 2013, 10:44 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#29 | module move | TM#4 with SiC #29 has been moved from the
conditioning station to the east target station,
move went well. |
|
415
|
Tuesday, July 30, 2013, 14:42 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE. | TM4 has been connected in ITE. All turbo
pumps have been started now. The pumping
down on TM4 and ITE is good so far. The water |
|
419
|
Thursday, August 15, 2013, 07:37 |
David Wang | ITE | Repair | TM4 | | I moved 5 shielding blocks from ITE to block storage area. | I moved5shielding blocks from ITE to block
storage area, This is a job for preparing
ITE vacuum surge investigation and leak check. |
|
421
|
Thursday, August 15, 2013, 16:35 |
Anders Mjos | ITE | Repair | TM4 | SiC#29 | Leak found on Coil 1 | By
pressurizing the water lines with 70 psi |
|