  362   Monday, May 27, 2013, 10:35 Bevan MossConditioning StationStandard OperationTM4Ta #40Pumps Started HV testing to followThe pumps have been turned on at ~9:30
this morning. Current values are 6.61 Mohm
TCS:DIC1 @19.4 C. HV testing will start momentarily.
  
  363   Monday, May 27, 2013, 10:37 Bevan MossConditioning StationMaintenanceTM4 Cooling Systems topped offRob walker has flushed and refilled the
primary side of the system (note the water
still looks nasty). This morning the primary
  
  367   Monday, May 27, 2013, 16:07 Bevan MossConditioning StationStandard OperationTM4Ta #40HV conditioning The HV conditioning reached a maximum
of 44kV today before a spark took out the
canbus card. I will attach the data once
  
  368   Monday, May 27, 2013, 16:36 Bevan MossConditioning StationStandard OperationTM4Ta#40Argon Venting Started Argon venting has started. It will
be left to vent over night. 
  
  369   Tuesday, May 28, 2013, 10:37 Travis CaveITEStandard OperationTM4Ta#40module moveTM#4 with Ta #40 moved from the conditioning
station to the east target station, move
went well.
  
  370   Tuesday, May 28, 2013, 10:42 Travis CaveSouth Hot-CellStandard OperationTM4Ta#40Electrical checkResults of the electrical check on 
TM#4 with Ta#40, it passed. See attached
PDF for results.
 TM#4_Ta#40_SIS_Target_Elec_Chk.PDF 
  371   Wednesday, May 29, 2013, 06:32 David WangITEStandard OperationTM4Ta#40TM4 has been connected in ITE.TM4 has been connected in ITE. The pumping
down is fine so far.TM4 water interlock check
was done yesterday.
  
  374   Tuesday, June 04, 2013, 12:36 David WangITEStandard OperationTM4 5 shielding blocks are transferred from ITW to ITEDan an I  transferred 5 shielding
blocks from ITW to ITE. The ITE is configured
to take proton beam.
  
  400   Tuesday, July 16, 2013, 13:09 David WangITEStandard OperationTM4 TM4 has been disconnected in ITE.TM4 has been disconnected in ITE. All water
lines on TM4 have been purged. ITE is venting
now.
  
  405   Tuesday, July 23, 2013, 10:55 Travis CaveITEStandard OperationTM4Ta#40module moveTM#4 with Ta#40 has been moved from the
east target station to the south hot cell
move went well.
  
  406   Tuesday, July 23, 2013, 13:33 Travis CaveSouth Hot-CellStandard OperationTM4Ta#40Electrical checkResults of electrical check on Ta#40 target
on TM#4 post beam at the south hot cell
 TM#4_Ta#40_SIS_Tgt_Elec_Chk_post.PDF 
  407   Wednesday, July 24, 2013, 08:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical checkElectrical check on TM#4 with SiC#29 has
been done. The reading of the magnet coil
and 60kV common is low at 750 ohms, normally
 TM#4_SiC#29_FEBIAD_Tgt_Elec_Chk.PDF 
  408   Wednesday, July 24, 2013, 14:40 Travis CaveConditioning StationStandard OperationTM4SiC#29module moveTM#4 with SiC#29 has been moved from the
south hot cell to the conditioning station
move went well.
  
  409   Wednesday, July 24, 2013, 17:46 David WangConditioning StationStandard OperationTM4Sic 29#Started 3 turbo pumps on CS for TM43 turbo pumps on TM4 and CS have been started.
The pumping down is good so far, The TM4
PNG1 reading is more than 10 times higher
  
  410   Thursday, July 25, 2013, 09:37 Travis CaveConditioning StationStandard OperationTM4SiC#29Electrical checkElectrical check of TM#4 with SiC#29 attached.
Results are pretty much the same as yesterday
for the coil to 60kV common, and anode to
 TM#4_SiC#29_FEBIAD_TgtElecChkCS_.PDF 
  411   Thursday, July 25, 2013, 10:08 David WangConditioning StationStandard OperationTM4SiC #29TM4 HS helium pressure test andTM4 connection at CSBevan and I did a helium pressure test
on TM4 HS water circuit at CS. The leak detector
is pumped to the bottom scale(E-9 atm.cc/sec
  
  414   Tuesday, July 30, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#29module moveTM#4 with SiC #29 has been moved from the
conditioning station to the east target station,
move went well.
  
  415   Tuesday, July 30, 2013, 14:42 David WangITEStandard OperationTM4 TM4 has been connected in ITE.TM4 has been connected in ITE. All turbo
pumps have been started now. The pumping
down on TM4 and ITE is good so far. The water
  
  419   Thursday, August 15, 2013, 07:37 David WangITERepairTM4 I moved 5 shielding blocks from ITE to block storage area.I moved5shielding blocks from ITE to block
storage area, This is a job for preparing
ITE vacuum surge investigation and leak check.
  
  421   Thursday, August 15, 2013, 16:35 Anders MjosITERepairTM4SiC#29Leak found on Coil 1By
pressurizing the water lines with 70 psi
 ITE_Leak_Test_2013-08-14.pdf 