28
|
Wednesday, September 28, 2011, 09:07 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#36 | Move of TM#4 from East target station to south hot cell. | Move of TM#4 with Ta#36 from East target
station to south hot cell, move went well. |
|
67
|
Monday, January 09, 2012, 14:44 |
David Wang | ITE | Maintenance | TM4 | | ITE and TM4 2012 winter shut down leak check is completed. | I did a vacuum leak check on all ITE primary
vacuum vessel and secondary vessel.I also
did a helium pressure test(80psi ) on all |
|
70
|
Thursday, January 12, 2012, 14:32 |
David Wang | ITE | Repair | TM4 | | TP2 on TM4 has been replaced | TP2 on TM4 has been replaced with a new
turbo pump , I didnt reset the controller
in electrical room.So this new pump start |
|
71
|
Monday, January 16, 2012, 09:30 |
David Wang | ITE | Maintenance | | | Changed all old inducion coils for flow sensors in ITE | I had changed all old induction coils for
flow sensors in ITE .I checked all ITE water
signals on control boards in electrical room.They |
|
81
|
Thursday, April 05, 2012, 10:30 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks back to ITE this morning. | MAA is secured .The ITE and MAA are
ready for taking proton beam now. |
|
95
|
Thursday, April 26, 2012, 09:23 |
David Wang | ITE | Repair | TM4 | | changed flow wheel on ITE TM4 contaiment box water circuit | The the magnetic field on ITE TM4 flow
wheel was gone yesterday.So there is
no water signal on this circuit. The water |
|
96
|
Thursday, April 26, 2012, 13:01 |
David Wang | ITE | Repair | TM4 | | Replaced TM4 EE water flow wheel in ITE. | Due to weak magnetic field on TM4 EE water
flow wheel, we have two times intermittent
water signal on this circuit this morning. |
|
98
|
Tuesday, May 08, 2012, 10:28 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | I disconnected TM4 in ITE. The heat shield
water circuit is purged. I closed the
water supply to ITE.Now, the water system |
|
99
|
Monday, May 14, 2012, 12:37 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#26 | module move | TM#4 with SiC #26 was moved from the East
Station to the South Hot Cell. Bevan was
at the helm of the PLC. There was no issue |
|
110
|
Tuesday, May 22, 2012, 10:50 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#27 | module moved | Module has been moved from conditioning
station to the east target station. Move
went well. |
|
111
|
Tuesday, May 22, 2012, 12:36 |
David Wang | ITE | Standard Operation | TM4 | sic 27 | TM4 connection in ITE | All TM4 connections in ITE is done. The
station and TM4 is under roughing now. |
|
112
|
Tuesday, May 22, 2012, 15:19 |
David Wang | ITE | Standard Operation | TM4 | sic 27 | TM4 in ITE under pumping |
Normal
0
|
|
114
|
Monday, May 28, 2012, 13:05 |
David Wang | ITE | Standard Operation | | | I moved 5 shielding blocks from ITW to ITE . | 5 shielding blocks have been transferred
from ITW to ITE. ITE ventilation is
opened, and ITW closed. All ITE water |
|
136
|
Tuesday, July 03, 2012, 10:50 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | I disconnected TM4 in ITE this morning.
The window circuit and heat shield circuit
had been purged. The general field inside |
|
144
|
Monday, July 09, 2012, 10:51 |
Travis Cave | ITE | Standard Operation | TM4 | UO#3 | module move | TM#4 with UO#3 from the conditioning station
to the east target station. Move went well. |
|
145
|
Monday, July 09, 2012, 16:08 |
David Wang | ITE | Standard Operation | TM4 | UO#3 | ITM4 in ITE connected and pumping down |
Normal
0
|
|
150
|
Thursday, July 26, 2012, 08:33 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks from ITW to ITE thisTuesday morning . | All water interlock checks for ITE
had been done. The ITE water signals strength
and frequency(Espcially on MSP circuit) had |
|
165
|
Thursday, August 30, 2012, 13:57 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | I disconnected TM 4 in ITE on AUG 29th
morning.The vacuum lines stay untouched and
they will be disconnected on SEP 04th. |
|
175
|
Wednesday, September 12, 2012, 07:00 |
David Wang | ITE | Standard Operation | TM4 | NiO #1 | ITM4 in ITE connected and pumping down | TM4 had been connected in ITE. Six turbo
pump had been started . thepumpming diwn
is very good so far. The water interlock |
|
189
|
Thursday, September 27, 2012, 09:13 |
David Wang | ITE | Repair | TM4 | | ITE MSP water circuit flow wheel had been replaced | ITE MSP water circuit flow wheel was replaced
yesterday due to poor performance. |
|