2031
|
Tuesday, November 26, 2019, 10:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 | Module move |
TM#2 with SiC#38 has been moved from ITE to the south hot cell. |
2032
|
Wednesday, November 27, 2019, 13:46 |
David Wang | Conditioning Station | Standard Operation | TM2 | SiC 38# febiad | TM2 SiC #38 disconnection checklist. |
TM2 was disconnected in ITE yesterday. |
Attachment 1: SiC_#_38_febiad_disconnection_checklist.pdf
|
|
2033
|
Friday, November 29, 2019, 11:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 SiC#39 | Electrical Check |
Results from the electrical check with the old SiC#38 target and the new SiC#39. |
Attachment 1: Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdf
|
|
Attachment 2: Elec_chk_SiC#39_SHC_TM2_11-29-2019.pdf
|
|
2034
|
Friday, November 29, 2019, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#39 | Module move |
TM#2 with the SiC#39 target has been moved from the south hot cell to the east target station. |
2035
|
Friday, November 29, 2019, 13:10 |
David Wang | ITE | Standard Operation | TM2 | SiC 39# febiad | TM2 SiC#39 connection check list. |
TM2 has been connected in ITE. All turbo-pumps are started. |
Attachment 1: SiC_#_39_febiad_connection_checklist.pdf
|
|
2053
|
Wednesday, January 29, 2020, 12:37 |
David Wang | ITE | Standard Operation | TM2 | | ITE primary/secondary vacuum vessel leak check. |
Leak check on ITE vacuum vessel is done. LD base leak rate 0.0XE-9atm.cc/sec. base pressure 0.0Xe-4torr. Sprayed helium on all ITE primary and secondary vacuum vessel seals(including TM2). No leak . Also,70psi helium pressurized TM2 waterlines inside the module for each circuit 3 minutes. No leak on all operating TM2 waterlines. |
2071
|
Thursday, February 27, 2020, 09:50 |
Travis Cave | Safe Module Parking | Standard Operation | TM2 | SiC#39 | Module move |
TM#2 with SiC#39 has been moved from the east station to the smp. |
2072
|
Thursday, February 27, 2020, 10:37 |
David Wang | Safe Module Parking | Standard Operation | TM2 | | Start of SMP vacuum pump. |
TM2 in SMP with old SiC #39 target on it. SMP vacuum pump is started. |
2076
|
Wednesday, March 04, 2020, 14:30 |
David Wang | Safe Module Parking | Standard Operation | TM2 | | Remove of TM2 from SMP to SHC. |
Frank and I removed TM2 from SMP to SHC. The move is successful. |
2077
|
Thursday, March 05, 2020, 07:16 |
David Wang | South Hot-Cell | Standard Operation | TM2 | SiC #39 | TM2 SiC #39 post run electrical checklist |
Electrical check result is fine. See attachment. |
Attachment 1: SiC_#39_post_run_cheklist..pdf
|
|
2079
|
Friday, March 06, 2020, 09:51 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 was moved from SHC to SMP yesterday. |
TM2 was moved from SHC to SMP yesterday. The move is successful. TM2 is located at SMP. There is no hot target on module so SMP vacuum is not started. |
2102
|
Tuesday, June 16, 2020, 09:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move |
TM#2 with no target has been moved from the south west silo to the south hot cell. |
2104
|
Wednesday, June 17, 2020, 09:53 |
David Wang | South Hot-Cell | Standard Operation | TM2 | C#1 | C#1 target electrical check and leak check at SHC. |
Target to HS is 400 ohm. The rest check is good. See attachment. |
Attachment 1: C#1_target_electrical_and_leak_check.pdf
|
|
2105
|
Thursday, June 18, 2020, 09:11 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move |
TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station. |
2106
|
Thursday, June 18, 2020, 13:22 |
David Wang | ITW | Standard Operation | TM2 | C#1 | Remove of TM2 from ITE to SHC. |
Remotely remove TM2 from ITW to SHC. The move is good. Shielding plug is put back to ITW. |
2110
|
Thursday, June 25, 2020, 09:45 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move |
TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station. |
2115
|
Friday, July 03, 2020, 06:57 |
David Wang | ITW | Standard Operation | TM2 | C#1 | TM2 CONNECTION CHECKLIST |
SEE ATTACHMENTS. EVERYTHING IS GOOD. |
Attachment 1: TM2_C#1_CONNECTION_CHECKLIST.pdf
|
|
2121
|
Monday, July 06, 2020, 12:20 |
David Wang | ITW | Standard Operation | TM2 | C#1 | Five shielding blocks to ITW |
Five shielding blocks are transferred to ITW |
2127
|
Friday, July 24, 2020, 09:43 |
Travis Cave | Conditioning Station | Maintenance | TM2 | Graphite #1 | Module move |
TM#2 has been moved from the west station to the conditioning station. ITW entrance module moved will take place on Monday morning. |
2131
|
Thursday, July 30, 2020, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move |
TM#2 with Graphite #1 has been moved back to the west target station from the conditioning station. |