2022
|
Tuesday, November 05, 2019, 11:57 |
David Wang | ITE | Standard Operation | TM2 | Ta 59 | Ta#59 disconnection checklist |
See attachment |
Attachment 1: Ta#59_disconnection_checklist.pdf
|
|
2023
|
Tuesday, November 05, 2019, 12:46 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ta#59 | Ta#59 removed |
Ta#59 has been removed from TM2 and it is now ready for electrical check. |
2024
|
Tuesday, November 05, 2019, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Electrical Check |
Results of the electrical check of TM#2 with the old Ta#59 target and target free. |
Attachment 1: Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdf
|
|
Attachment 2: Elec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf
|
|
2025
|
Thursday, November 07, 2019, 08:56 |
David Wang | Conditioning Station | Standard Operation | TM2 | SiC#38 | TM2 in TCS. |
Helium pressure leak check on TM2 HS line at TCS is done. No leak. Also, Helium are sprayed to gas line adapter and fittings. No leak. TM2 is connected at TCS. Anode plug on TCS is connected to module 52pin connector. Water system is started. Vacuum pumping down is good. HV cover will be installed today. |
2026
|
Thursday, November 07, 2019, 10:39 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | SiC#38 | Conditioing SiC#38 |
Thursday, November 07, 2019, 10:35: Tested source to 30 A on TGHT, TBHT and COIL. ANODE at 100 V.
Tuesday, November 12, 2019
The FEBIAD source worked well over the weekend. The anode current limit was adjusted twice to stop voltage limiting. About 5E-8 A on the FC with TGHT=580A, TBHT=300A, ANODE=200V,150 mA, COIL=50A. Bias was conditioned to 30 kV |
Attachment 1: SiC#38_ANODE_bias_2019-11-07.PNG
|
|
2027
|
Tuesday, November 12, 2019, 10:02 |
Adam Newsome | ITE | Standard Operation | TM2 | SiC#38 | TM2 Move |
TM2 was moved from the Conditioning Station to ITE, with SiC#38 target. |
2030
|
Tuesday, November 19, 2019, 13:41 |
David Wang | ITE | Standard Operation | TM2 | SiC 38# febiad | TM2 SiC#38 connection check list. |
TM2 was connected in ITE 12th Nov. attach checklist |
Attachment 1: SiC_#_38_febiad_connection_checklist.pdf
|
|
2031
|
Tuesday, November 26, 2019, 10:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 | Module move |
TM#2 with SiC#38 has been moved from ITE to the south hot cell. |
2032
|
Wednesday, November 27, 2019, 13:46 |
David Wang | Conditioning Station | Standard Operation | TM2 | SiC 38# febiad | TM2 SiC #38 disconnection checklist. |
TM2 was disconnected in ITE yesterday. |
Attachment 1: SiC_#_38_febiad_disconnection_checklist.pdf
|
|
2033
|
Friday, November 29, 2019, 11:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 SiC#39 | Electrical Check |
Results from the electrical check with the old SiC#38 target and the new SiC#39. |
Attachment 1: Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdf
|
|
Attachment 2: Elec_chk_SiC#39_SHC_TM2_11-29-2019.pdf
|
|
2034
|
Friday, November 29, 2019, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#39 | Module move |
TM#2 with the SiC#39 target has been moved from the south hot cell to the east target station. |
2035
|
Friday, November 29, 2019, 13:10 |
David Wang | ITE | Standard Operation | TM2 | SiC 39# febiad | TM2 SiC#39 connection check list. |
TM2 has been connected in ITE. All turbo-pumps are started. |
Attachment 1: SiC_#_39_febiad_connection_checklist.pdf
|
|
2053
|
Wednesday, January 29, 2020, 12:37 |
David Wang | ITE | Standard Operation | TM2 | | ITE primary/secondary vacuum vessel leak check. |
Leak check on ITE vacuum vessel is done. LD base leak rate 0.0XE-9atm.cc/sec. base pressure 0.0Xe-4torr. Sprayed helium on all ITE primary and secondary vacuum vessel seals(including TM2). No leak . Also,70psi helium pressurized TM2 waterlines inside the module for each circuit 3 minutes. No leak on all operating TM2 waterlines. |
2071
|
Thursday, February 27, 2020, 09:50 |
Travis Cave | Safe Module Parking | Standard Operation | TM2 | SiC#39 | Module move |
TM#2 with SiC#39 has been moved from the east station to the smp. |
2072
|
Thursday, February 27, 2020, 10:37 |
David Wang | Safe Module Parking | Standard Operation | TM2 | | Start of SMP vacuum pump. |
TM2 in SMP with old SiC #39 target on it. SMP vacuum pump is started. |
2076
|
Wednesday, March 04, 2020, 14:30 |
David Wang | Safe Module Parking | Standard Operation | TM2 | | Remove of TM2 from SMP to SHC. |
Frank and I removed TM2 from SMP to SHC. The move is successful. |
2077
|
Thursday, March 05, 2020, 07:16 |
David Wang | South Hot-Cell | Standard Operation | TM2 | SiC #39 | TM2 SiC #39 post run electrical checklist |
Electrical check result is fine. See attachment. |
Attachment 1: SiC_#39_post_run_cheklist..pdf
|
|
2079
|
Friday, March 06, 2020, 09:51 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 was moved from SHC to SMP yesterday. |
TM2 was moved from SHC to SMP yesterday. The move is successful. TM2 is located at SMP. There is no hot target on module so SMP vacuum is not started. |
2102
|
Tuesday, June 16, 2020, 09:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move |
TM#2 with no target has been moved from the south west silo to the south hot cell. |
2104
|
Wednesday, June 17, 2020, 09:53 |
David Wang | South Hot-Cell | Standard Operation | TM2 | C#1 | C#1 target electrical check and leak check at SHC. |
Target to HS is 400 ohm. The rest check is good. See attachment. |
Attachment 1: C#1_target_electrical_and_leak_check.pdf
|
|