2076
|
Wednesday, March 04, 2020, 14:30 |
David Wang | Safe Module Parking | Standard Operation | TM2 | | Remove of TM2 from SMP to SHC. |
Frank and I removed TM2 from SMP to SHC. The move is successful. |
2077
|
Thursday, March 05, 2020, 07:16 |
David Wang | South Hot-Cell | Standard Operation | TM2 | SiC #39 | TM2 SiC #39 post run electrical checklist |
Electrical check result is fine. See attachment. |
2079
|
Friday, March 06, 2020, 09:51 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 was moved from SHC to SMP yesterday. |
TM2 was moved from SHC to SMP yesterday. The move is successful. TM2 is located at SMP. There is no hot target on module so SMP vacuum is not started. |
2102
|
Tuesday, June 16, 2020, 09:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move |
TM#2 with no target has been moved from the south west silo to the south hot cell. |
2104
|
Wednesday, June 17, 2020, 09:53 |
David Wang | South Hot-Cell | Standard Operation | TM2 | C#1 | C#1 target electrical check and leak check at SHC. |
Target to HS is 400 ohm. The rest check is good. See attachment. |
2105
|
Thursday, June 18, 2020, 09:11 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move |
TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station. |
2106
|
Thursday, June 18, 2020, 13:22 |
David Wang | ITW | Standard Operation | TM2 | C#1 | Remove of TM2 from ITE to SHC. |
Remotely remove TM2 from ITW to SHC. The move is good. Shielding plug is put back to ITW. |
2110
|
Thursday, June 25, 2020, 09:45 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move |
TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station. |
2115
|
Friday, July 03, 2020, 06:57 |
David Wang | ITW | Standard Operation | TM2 | C#1 | TM2 CONNECTION CHECKLIST |
SEE ATTACHMENTS. EVERYTHING IS GOOD. |
2121
|
Monday, July 06, 2020, 12:20 |
David Wang | ITW | Standard Operation | TM2 | C#1 | Five shielding blocks to ITW |
Five shielding blocks are transferred to ITW |
2127
|
Friday, July 24, 2020, 09:43 |
Travis Cave | Conditioning Station | Maintenance | TM2 | Graphite #1 | Module move |
TM#2 has been moved from the west station to the conditioning station. ITW entrance module moved will take place on Monday morning. |
2131
|
Thursday, July 30, 2020, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move |
TM#2 with Graphite #1 has been moved back to the west target station from the conditioning station. |
2133
|
Tuesday, August 18, 2020, 09:06 |
David Wang | ITW | Standard Operation | TM2 | | TM2 and ITW entrance module have been disconnected in ITW |
Tm2 and itw entrance module have been disconnected in ITW. I will attach disconnection checklist later. |
2134
|
Tuesday, August 18, 2020, 09:57 |
Adam Newsome | Conditioning Station | Standard Operation | TM2 | | TM2 Moved to Conditioning Station |
TM2 was moved from ITW to the Conditioning Station. |
2137
|
Tuesday, August 25, 2020, 09:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Graphite #1 | Module move |
TM#2 with Graphite #1 has been moved from the conditioning station to the south hot cell. |
2138
|
Wednesday, August 26, 2020, 09:52 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Ta#60 | Ta#60 target electrical check and leak check at SHC. |
Electrical check and leak check at SHC. NO leak. electrical check ok. Before target on, A is short to PQ, RU is short to HS ( 60KV bias) as we measured before. |
2139
|
Thursday, August 27, 2020, 08:21 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#60 | Helium pressure check on TM2 HS line at TCS. |
Helium pressurize on TM2 HS line at TCS is done. Base LR is 0.0X E-9 atm.cc/sec. 70 psi helium 3 minutes. No response. Also, The TCS vacuum pumping down over night is good. |
2140
|
Thursday, August 27, 2020, 09:42 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | Ta#60 | Refilled TK2 |
Refilled TCS:TK2 from 10 in to 22 in using the newly installed valve. |
2142
|
Thursday, August 27, 2020, 13:18 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | New Power Supply installed for TGHT |
Arthur installed a new Magna Power PS for the TGHT yesterday. The old power supply has been moved to Evaporator 2. The power supply was configured for remote operation and tested successfully with low current (30 A). |
2144
|
Friday, September 11, 2020, 11:25 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#60 | Module move |
Both the west entrance module and TM#2 with Ta#60 have been moved back into ITW. |