394
|
Wednesday, July 03, 2013, 08:44 |
chad fisher, Travis Cave | South Hot-Cell | Standard Operation | | | Ta#39 Transfered to spent target storage vault | Ta#39 has been transferred to spent target
storage vault. Ta#39 was placed into pail
#106 and placed into spot of 4C of the spent |
|
397
|
Friday, July 05, 2013, 09:22 |
chad fisher | South Hot-Cell | Repair | TM3 | | Service Tray Water Block Inspection | I have inspected the service tray water
block and suggest that they SHOULD be cleaned/polished
before we install the new source tray. |
|
400
|
Tuesday, July 16, 2013, 13:09 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been disconnected in ITE. | TM4 has been disconnected in ITE. All water
lines on TM4 have been purged. ITE is venting
now. |
|
401
|
Wednesday, July 17, 2013, 08:29 |
David Wang | Conditioning Station | Development | TM3 | | TM3 leak check in CS without source tray. | Leak checked TM3 without source tray in
CS this morning. The CS and TM3 vacuum: IG1(top
of the TM3 service cap)4.9x E-7Torr, IG2(diagnostic |
|
402
|
Wednesday, July 17, 2013, 10:10 |
David Wang | Conditioning Station | Development | TM3 | | CS cooling and vacuum system have been turned off | CS water cooling and vacuum system have
been turned off at 10:00 AM this morning.The
TM3 will be disconnected and moved to silo |
|
412
|
Friday, July 26, 2013, 11:06 |
David Wang | South Hot-Cell | Standard Operation | | | The steel shielding plug has been put on theSHC top in target hall | to reduce the radioactive shining from
SHC Ta# 40 target. |
|
415
|
Tuesday, July 30, 2013, 14:42 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE. | TM4 has been connected in ITE. All turbo
pumps have been started now. The pumping
down on TM4 and ITE is good so far. The water |
|
416
|
Wednesday, July 31, 2013, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target move | Five spent targets have been removed from
the storage vault and placed into the mini
storage. The target placed into the mini |
![Vault_Storage_July_31_2013.pdf Vault_Storage_July_31_2013.pdf](attachment.png) |
417
|
Wednesday, August 07, 2013, 06:47 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | All the F-308's have been torqued up
and the locks installed. Ready to be moved. |
|
418
|
Wednesday, August 14, 2013, 11:50 |
Travis Cave | South Hot-Cell | Maintenance | TM3 | | module move | TM#3 and its new source tray have been
both moved into the south hot cell. |
|
419
|
Thursday, August 15, 2013, 07:37 |
David Wang | ITE | Repair | TM4 | | I moved 5 shielding blocks from ITE to block storage area. | I moved5shielding blocks from ITE to block
storage area, This is a job for preparing
ITE vacuum surge investigation and leak check. |
|
420
|
Thursday, August 15, 2013, 09:32 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 source tray installation status |
The installation of the module
side water block jig has been successful.
During |
|
423
|
Wednesday, August 21, 2013, 20:36 |
Grant Minor | South Hot-Cell | Repair | TM3 | | TM3 module-side water block sealing surface inspection (post polishing) | The water block sealing surfaces on the
module-side of TM3 were polished this week
by Chad Fisher, using his air-ratchet controlled |
![TM3_final_water_block_polishing_16-048.JPG TM3_final_water_block_polishing_16-048.JPG](attachment.png) |
424
|
Thursday, August 22, 2013, 19:38 |
Grant Minor | South Hot-Cell | Repair | TM3 | | TM3 Rev 3 source tray - water blocks connected and torqued | After a great struggle with the water block
jigs, the TM3 source tray was finally advanced
fully into the service tray and all water |
6x |
425
|
Friday, August 23, 2013, 18:32 |
Grant Minor | South Hot-Cell | Repair | TM3 | | TM3 Rev 3 - steerer wire broken from connector on module side | While continuing on the TM3 Rev 3 source
tray installation, Chad noticed today that
one of the steerer wires is broken and has |
![TM3_Broken_Steerer_Wire_Module_Side_23Aug2013.JPG TM3_Broken_Steerer_Wire_Module_Side_23Aug2013.JPG](attachment.png) ![TM3_Broken_Steerer_Wire_Module_Side_23Aug2013-001.JPG TM3_Broken_Steerer_Wire_Module_Side_23Aug2013-001.JPG](attachment.png) ![TM3_Broken_Steerer_Wire_Module_Side_23Aug2013-002.JPG TM3_Broken_Steerer_Wire_Module_Side_23Aug2013-002.JPG](attachment.png) ![ITA2826D_RevD02_23Aug2013.pdf ITA2826D_RevD02_23Aug2013.pdf](attachment.png) |
426
|
Monday, August 26, 2013, 18:22 |
Grant Minor | South Hot-Cell | Repair | TM3 | | TM3 Rev 3 - all connetions made except steerers, IMG, and entrance window | Today Chad finished making all connections
to the new source tray, except for:
- steerers - broken wire, must be |
8x |
427
|
Monday, August 26, 2013, 18:26 |
Grant Minor | Conditioning Station | Standard Operation | TM3 | | TM3 moved from Hot Cell to Conditioning Station | Target Module 3 with no target, and a partially-installed
Rev-3 source tray (no steerers connected,
no IMG connected, entrance window lines blanked |
|
434
|
Thursday, August 29, 2013, 06:48 |
David Wang | Conditioning Station | Development | TM3 | | TM3 leak check in CS with new source tray. | A huge leak had been found on HS circuit
during 60 psi helium pressurize test. Other
circuits are free of obvious major leak at |
|
435
|
Thursday, August 29, 2013, 09:08 |
chad fisher | South Hot-Cell | Repair | TM3 | | Heat Shield Circuit Leak | The heat shield circuit was pressurized
with air (15-20 psi) and snoop applied to
the water block joint and brazes. Bubbles |
![20130829_084751.jpg 20130829_084751.jpg](attachment.png) ![20130829_084754.jpg 20130829_084754.jpg](attachment.png) ![20130829_084949.jpg 20130829_084949.jpg](attachment.png) |
436
|
Thursday, August 29, 2013, 10:09 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Heat Shield Circuit Leak |
|
|