  1511   Thursday, April 27, 2017, 16:58 Isaac EarleNorth Hot-CellDevelopment  Right side NHC manipulator installed Installation of the NHC right side
manipulator was completed yesterday.  The
three piece manipulator was assembled in
 IMG_0036.JPGIMG_0046.JPGIMG_0054.JPGCRLD-1046-B_rev_1_Installation_Removal_Manual_(July_2013).pdfManipulator_Cart_User_Manual__(CRLD-1003).pdf 
  462   Tuesday, September 24, 2013, 14:46 Bevan MossSouth Hot-CellRepair  Right manipulator repair    
  486   Wednesday, October 02, 2013, 13:44 Bevan MossSouth Hot-CellStandard OperationTM4 Right Coil is leaking Today Maico and Travis completed
and electrical test to determine the right
and left coil on TM4. The left coil is the
 tm4leak.jpg 
  2512   Thursday, December 21, 2023, 09:37 Ferran Boix PamiesITEDevelopment  Rewiring of TC multiping wiresThursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger
  
  1962   Wednesday, August 14, 2019, 11:43 Travis CaveSouth Hot-CellStandard OperationTM2Ta#58 and no target.Results of electrical checks post beam at the south hot cell. Here are the results of the electrical
done at the south hot cell post beam of with
the Ta#58 target attached and with just the
 TM2_elec_chk_Ta58_post_beam_shc.pdfTM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf 
  1681   Monday, January 22, 2018, 07:47 David WangConditioning StationStandard OperationTM3 Restarted TM3 vacuum sysytem after site power bumpAll TCS and TM3  vacuum pumps are
started successfully.
  
  1858   Monday, January 14, 2019, 07:07 David WangConditioning StationMaintenanceTM2 Restarted TCS vacuum system .No issue.   
  2093   Wednesday, May 20, 2020, 13:19 David WangITEMaintenance  Restart of ITE turbo pumps. PLC6 drop out in weekend caused the ITH
MP1 and MP1s stopped. ITE turbo pumps were
running still after that. Without back up
  
  614   Thursday, March 06, 2014, 12:59 David WangConditioning StationMaintenanceTM1 Restart TM1 and CS TPs Restarted TM1 and CS turbo pumps after
the power off. Everything is fine .
  
  1843   Wednesday, January 02, 2019, 10:26 Anders MjosConditioning StationStandard Operation  Restarrted TP1SFound pumps off after the holidays. Restarted
roughing pump and TP1S
  
  846   Tuesday, February 17, 2015, 13:07 Anders MjosITWDevelopment  Resistance measured of TGHT and TBHT lines to ITW See e-log entry
for ITE for details. The copper bars have
not been removed. They can be used for testing
  
  903   Tuesday, April 28, 2015, 11:09 Anders MjosITWMaintenance  Resistance measured of TGHT and TBHT lines to ITWThe new TBHT and TGHT power supplies were
brough up to high current; 350 A and 420
A respectively. The TGHT power supply was
 Resistance_from_Electrical_Room_to_Target_Station.xlsx 
  845   Tuesday, February 17, 2015, 13:06 Anders MjosITEDevelopment  Resistance measured of TGHT and TBHT lines to ITEThe copper bars was installed by David
and Anders. After the measurements were completed,
the copper bars were removed.
 002.JPGResistance_from_Electrical_Room_to_Target_Station.xlsx 
  2609   Thursday, June 13, 2024, 11:44 David WangConditioning StationRepairTM2 Replaced several o ring seals on TM2 service cap.  couple of E-8 to low E-7 atm.cc/sec
leak were found on TM2 service cap top air
to vacuum  o rings.  Replaced these
  
  992   Friday, July 10, 2015, 14:41 Anders MjosConditioning StationMaintenanceTM1 Replaced roughing pump The roughing pump was replaced with
a more leak tight pump due to the discovery
of Rn-220 migration while roughing on TM1
  
  1687   Wednesday, February 14, 2018, 10:06 Anders MjosITWMaintenanceTM2 Replaced parker couplings on Window cooling lineBy Anders & David. Couplings will be
taken apart for inspection.
  
  2311   Wednesday, March 02, 2022, 10:51 David WangITE/ITWStandard Operation  Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel. Replaced 9 old turbo pumps from ITE/ ITW
and  one 2A3M20 wire scanner from ITE
are transferred to cyclotron tunnel for storage.
  
  164   Thursday, August 23, 2012, 07:34 David WangITWRepair  Replaced broken air lines on ITW HARP5B cylinder.Prob guys replaced broken air lines on
ITW HARP 5B Cylinder.Several shielding blocks
had been moved out to make the cylinder accessible.
  
  2613   Friday, June 14, 2024, 16:04 Carla BabcockITWRepairTM4UC#45Replaced and reinstalled electronics in ITW cageITW has been behaving badly at higher voltages
recently, even without protons on. I conditioned
it up to 50kV with heaters off in the TCS
  
  229   Thursday, January 10, 2013, 10:40 David WangITWMaintenance  Replaced all high active water system magnetic pedal wheels in ITW and ITE.I replaced all high active water system
magnetic pedal wheels in ITW and ITE. This
is a preventive maintenance job we planned
  