Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 76 of 140  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  787   Thursday, November 13, 2014, 14:05 David WangITERepairTM4 Dan and I replaced flow wheel on ITE HVC2 water flow sensor.Dan and I replaced flow wheel on ITE HVC2
water flow sensor. The old wheel did rotate
smoothly inside its SST case. The new wheel
  
  791   Tuesday, November 18, 2014, 11:14 David WangSouth Hot-CellStandard Operation UCx11crane down UCx 11 target into SHC from THI craned down UCx11 target from TH into
SHC. Chad was in SHC service area watching
on it. The source tray moving jig was installed
  
  792   Tuesday, November 18, 2014, 11:15 David WangITEStandard OperationTM4Ta#44TM4 has been disconnected in ITE.Dan and I disconnected TM4 in ITE.   
  795   Wednesday, November 19, 2014, 11:12 David WangConditioning StationStandard OperationTM4 CS roughing pump is started. CS roughing pump is started for TM4 and
UCX 11 target.
  
  797   Thursday, November 20, 2014, 14:12 David WangITEStandard OperationTM4UCx11TM4 is connected in ITE.TM4 has been connected connect in ITE.
Water is supplied to TM4 module only.
  
  798   Thursday, November 20, 2014, 14:13 David WangConditioning StationStandard OperationTM4UCx11CS and TM4 was vented with Argon gasCS and TM4 was vented with Argon gas this
morning before it was moved from CS to ITE.
  
  800   Tuesday, November 25, 2014, 11:33 David WangSouth Hot-CellDevelopment  Remove UCX 11 target transfer stand from SHC back to TH.The stand was used for transferring UCX11
targte from TH to SHC. The stand wit target
was craned down from TH into SHC last week
  
  801   Tuesday, November 25, 2014, 12:45 David WangITEStandard OperationTM4UCx115 Shielding blocks have been transferred from ITW to ITE.5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam.
  
  808   Tuesday, December 02, 2014, 13:33 David WangSouth Hot-CellDevelopmentTM2 Leak check on TM2 tube heater +(D) at SHCChad and I leak checked TM2 tube heater+(D)
circuit at SHC with water bypass loop and
new seals installed on the water block. The
 2014-12-02_003.JPG2014-12-02_001.JPG2014-12-02_004.JPG 
  812   Thursday, December 04, 2014, 16:37 David WangConditioning StationDevelopmentTM2 connected TM2 and CS vacuum system .I connected TM2 and CS vacuum system. All
vacuum pumps on TM2 and CS are started .The
pumping down is good so .far
  
  813   Friday, December 05, 2014, 07:47 David WangConditioning StationDevelopmentTM2 TM2 at CSThe pumping down on TM2 at CS was good
overnight. However, the back up line pressure
is still too high for LD to get to 0.0-E-9atm.cc/sec
  
  814   Friday, December 05, 2014, 11:58 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D) water lines.At CS, The leak detector is hooked directly
to the TM2 top service cap. The base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4torr. Applied
 6x 
  827   Tuesday, January 06, 2015, 11:14 David WangITEStandard OperationTM4 4 Shielding blocks have been moved out of ITE .4 shielding blocks have been moved out
of  ITE to block storage area. Fiona
did the survey and with me during the move.
  
  830   Thursday, January 08, 2015, 08:04 David WangITEStandard OperationTM4 TM4 water lines have been disconnected in ITE and purged.TM4 waterlines have been disconnected and
purged in ITE. The TM4 vacuum system is still
in operation.
  
  840   Friday, February 06, 2015, 08:06 David WangCraneRepair  TH crane lost movement controls since last Friday.Last Friday, During the crane per use check,
I found the main power supply to to crane
was shut off. I was told   Don and Travis
  
  841   Friday, February 06, 2015, 12:27 David WangCraneRepair  TH crane troubleshoot Gordon crane technician started TH crane
trouble shooting this morning. The problem
is found that there is no 115VAC power supply
  
  843   Thursday, February 12, 2015, 09:11 David WangCraneRepairTM4 TH crane troubleshoot and annual inspection.Gordon crane technicians continued their
troubleshooting on this Tuesday. They found
the crane up-limit protection switch which
  
  844   Monday, February 16, 2015, 11:57 David WangCraneRepair  TH craneDave.Morris installed a new battery on
crane control PLC board and uploaded the
program. Travis, Dan and I tested the crane
  
  847   Monday, February 23, 2015, 12:28 David WangITEMaintenance  2015 shut down coils and pedal wheels replacement on ITE water flow sensors.Dan and I replaced pedal wheels and coils
on ITE water flow sensors. It is a shut down
job we did every two years. See attachment
 2015_shut_down_ITE_water_sensors__replacements.pdf 
  848   Wednesday, February 25, 2015, 10:44 David WangITWMaintenance  2015 shut dwon ITW water sensor coils and pedal wheels replacementDan and I replaced pedal wheels and coils
on ITW water flow sensors. It  is a shut
down job we did every two years. See attachment
 2015_shut_down_ITW_water_sensors__replacements.pdf 
ELOG V2.9.2-2455