  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1787   Thursday, September 20, 2018, 14:36 Travis CaveITWStandard OperationTM2nSiC#1Module move TM#2 with nSiC#1 has been moved from
the south hot cell to the west target station.
  
  1788   Friday, September 21, 2018, 10:06 David WangITWStandard OperationTM2UCx23TM2 was disconnected in ITW.TM2 was disconnected in ITW this Tuesday.
See attachment for checklist.
 TM2_UCx_23#_disconnection_in_ITW..pdf 
  1789   Friday, September 21, 2018, 10:07 David WangITWStandard OperationTM2SiC nanoTM2 with SiC nano target was has been connected in ITW.Tm2 with SiC nano has been connected in
ITW. See attachment for checklist
 TM2_with_SiC_nano_connection_in_ITW..pdf 
  1790   Monday, September 24, 2018, 10:21 Anders MjosSouth Hot-CellStandard OperationTM2UC#23Post Irradiation Examination (PIE)UC#23 experienced short between target
and heat shield as it was heated during operation.
The inspection of the target after irradiation
 20180924_161322929_iOS.jpg 
  1793   Tuesday, September 25, 2018, 08:01 chad fisherSouth Hot-CellStandard OperationTM2nSiC#1nSiC#1 installOn September 18th installation of nSiC#1
was attempted on TM2. As usual, new fasteners
were tested previous to insertion into hot
 20180919_132304.jpg20180919_143535.jpg 
  1806   Tuesday, October 23, 2018, 10:45 David WangITWStandard OperationTM2SiC nanoTM2 was disconnected in ITW.TM2(SiC nano) has been disconnected in
ITW. See attachment
 TM2_SiC_nano_disconnection_in_ITW.pdf 
  1812   Tuesday, October 30, 2018, 10:50 Travis CaveITWStandard OperationTM2nSiC#1Modules moved Modules were moved, ITW EX2 was moved
from the conditioning station to the west
target station and TM#2 ,with nSiC#1, 
  
  1813   Wednesday, October 31, 2018, 14:20 Travis CaveConditioning StationStandard OperationTM2UC#25Module moveTM#2 with UC#25 has been moved from the south
hot cell to the conditioning station.
  
  1814   Wednesday, October 31, 2018, 14:23 Travis CaveSouth Hot-CellStandard OperationTM2nSiC#1 and UC#25Electrical Check TM#2 with targets nSiC#1 (old target)
and UC#25 (new target) electrical check results.
See attached for details.
 Electrical_Chk__TM#2_nSiC#1_SHC_Post_Beam_Oct-31-2018.pdfElectrical_Chk_TM#2_UC#25_SHC_Oct-31-2018.pdf 
  1815   Thursday, November 01, 2018, 11:42 David WangConditioning StationStandard OperationTM2UCx 25.TM2 HS line helium pressure test at TCS and helium spray at SHC..Chad and I did  leak check on TM2
HS line at SHC yesterday. Base LR 0.0XE-9
atm.cc/sec.   No response on LD.
  
  1817   Monday, November 05, 2018, 14:27 Anders MjosConditioning StationStandard OperationTM2UC#25Target module disconnectedFrank and Anders disconnected the water
and electrical connections this afternoon
after the target was conditioned over the
  
  1818   Tuesday, November 06, 2018, 10:59 Travis CaveITWStandard OperationTM2UC#25Module move TM#2 with UC#25 has been moved from
the conditioning station to the west target
station.
  
  1819   Wednesday, November 07, 2018, 09:50 Anders MjosITWStandard OperationTM2UC#25TM2 connected in ITWTM2 was connected yesterday by Frank and
Anders. The West side panel with IG1S on
Exit Module 2 was replaced with a new SST
  
  1821   Wednesday, November 14, 2018, 16:10 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal troubleshootingMeasured resistance on safety limit switches
for FC5 on Exit Module 2. Determined that
the in connected signal did not work (shows
 2018-11-13_FC5.pdf 
  1823   Thursday, November 22, 2018, 08:53 Anders MjosITWStandard OperationTM2UC#25Block moveFrank and Anders moved blocks from ITE
to ITW yesterday
  
  1824   Thursday, November 22, 2018, 08:55 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal limit switch installedYesterday Diagnostics group installed a
temporary external limit switch to provide
the in signal to the safety system.
 FC5_limit_switch.jpg 
  1846   Friday, January 04, 2019, 08:48 David WangITWStandard OperationTM2 TM2 has been disconnected in ITW.TP1, TP2 are still connected for next week
leak check. All water lines in TM2 are purged
with 80 psi air, each for 5 minutes.
 UCx25_TM2_disconnection_checklist.pdf 
  1848   Tuesday, January 08, 2019, 08:49 David WangITWStandard OperationTM2 TP1 TP1 have been disconnected in ITWStarted argon venting of ITW now.    
  1850   Wednesday, January 09, 2019, 10:47 Travis CaveSouth Hot-CellStandard OperationTM2UC#25Module move TM#4 with UC#25 has been moved from
ITW to the south hot cell.
  
  1851   Wednesday, January 09, 2019, 13:08 Travis CaveSouth Hot-CellStandard OperationTM2UC#25Electrical Check Electrical check of the target module
with the UC#25 attached after the beam run.
 Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf 