  253   Wednesday, March 06, 2013, 12:50 Travis CaveSouth Hot-CellMaintenance  module moveITW EX1 have been moved back to the west
target station from the south hot cell.
  
  254   Wednesday, March 06, 2013, 14:12 David WangITWRepair  ITW EXIT1 tank to module o-ring replacement ITW
EXIT1  o-ring replacement is fininshed today.
The ITW EXIT 1 is back to ITW. The old o-ring
  
  256   Tuesday, March 12, 2013, 09:18 chad fisherSouth Hot-CellRepairTM4 Ground Electrode LeakOn Monday, March 11 the containment box
was removed from TM4 and a vacuum leak check
preformed in an attempt to locate the leak
  
  257   Wednesday, March 13, 2013, 07:22 chad fisherSouth Hot-CellRepairTM4 Ground Electrode Leak / Inspection ResultsFurther attempts to localize the leak were
unsucessful. The circuit was pressurized
with 60 psi air and snoop solution was applied
 IMG_3449.JPGIMG_3450.JPGIMG_3451.JPGIMG_3452.JPGIMG_3454.JPG 
  258   Wednesday, March 13, 2013, 11:23 chad fisherSouth Hot-CellRepairTM4 Ground Electrode LeakThe containment box has been re-installed
and the window waterlines reconnected and
leak checked.
  
  259   Wednesday, March 13, 2013, 14:30 Bevan MossConditioning StationDevelopment  Faraday Cup Dave Morris and I investigated the
Faraday Cup today. It was found to be plumed
in the wrong direction (fails in). This is
  
  262   Thursday, March 14, 2013, 07:09 David WangSouth Hot-CellStandard OperationTM4 TM4 electrical test at SHC after windown and containment box back.TM4 electrical test at SHC after windown
and containment box back is done. Everything
is fine. 
  
  263   Thursday, March 14, 2013, 07:18 David WangSouth Hot-CellStandard OperationTM4 TM4 window cooling line leak checkIt took a long time(more than 1 hour)  
to pump down the TM4 window  cooling
line during leak check time. The base leak
  
  272   Wednesday, March 20, 2013, 08:19 David WangConditioning StationRepairTM4 Leak check new installed TM4 TP1 at conditioning station.I leak checked new installed TM4 TP1 at
conditioning station. The CS vacuum gauges
reading were at 1.0-1.5xE-6 torr . Leak detector
  
  296   Friday, April 12, 2013, 10:32 David WangITWRepairTM1 ITW EXIT1 tank to module o-ring leak check.I leak checked new installed ITW EXIT1
tank to module o-ring.No leak had been found
. Also ,TM1 primary vessel air to vacuum
  
  297   Monday, April 15, 2013, 11:00 chad fisherSouth Hot-CellStandard OperationTM3 Items for TM3 dummy target installationNew gaskets and fasteners have been inserted
into the south hot cell in preparation for
installing the dummy target onto TM3 tomorrow.
  
  299   Tuesday, April 16, 2013, 11:20 chad fisherSouth Hot-CellRepairTM3 TM3 Referb. startFront containment box cover has been removed
and heat shield circuit blank offs removed
in preparation for installation of dummy
 IMG_3523.JPGIMG_3524.JPG 
  300   Wednesday, April 17, 2013, 09:02 chad fisherSouth Hot-CellRepairTM3 TM3 ready for conditioning stationThe heat shield circuit blank offs have
been re-installed and front cover replaced.
TM3 is ready to move to the conditioning
  
  302   Wednesday, April 17, 2013, 10:35 David WangITEStandard OperationTM4 I moved 5 shielding blocks back to ITE.5 shielding block had been moved 
back to ITE. The ITE is configured to take
proton beam.
  
  310   Monday, April 22, 2013, 09:33 David WangConditioning StationRepairTM3 Leak check TM3 at conditioning stationTM3 leak check at conditioning station
without target: TM3 all air to vacuum seals
have been leak checked . They are all good.
  
  318   Wednesday, April 24, 2013, 09:00 Bevan MossConditioning StationDevelopment  New user testing Controls has created a new user group
that can operate the conditioning station
but cannot use any of the bypasses or forces.
  
  320   Wednesday, April 24, 2013, 10:36 maicodallavalleSpent Target VaultMaintenance  F-308The F-308's have been serviced and are
ready to be filled. All inspection records
are stored  in docushare.
  
  321   Wednesday, April 24, 2013, 11:48 chad fisherSouth Hot-CellRepairTM3 TM3 Source Tray RemovalWork on TM3 source tray removal started
at 10:40 am today.
The containment box has been removed,
  
  322   Wednesday, April 24, 2013, 14:09 chad fisherSouth Hot-CellRepairTM3 TM3 Refurbishment E.O.D. Optics tray has been removed from module.
Waterblock jig installation has commenced.
Of note, jig installation on TM3 has proven
  
  323   Friday, April 26, 2013, 11:20 chad fisherSouth Hot-CellRepairTM3 Water Block Jig (back half)The back half of the water block jig (services
tray side) has been sucessfully located onto
the module.
  