261
|
Wednesday, March 13, 2013, 15:26 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | Roughing Started | Roughing pumps were turned on at
15:23 13/03/2013. |
|
339
|
Friday, May 10, 2013, 11:28 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Roughing Started | Roughing on TM3 was started at 11:26am
today |
|
511
|
Friday, October 18, 2013, 14:37 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Roughing Started | The roughing pump has been started. |
|
386
|
Tuesday, June 25, 2013, 14:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#6 | Roughing Pumps Started | The roughing pumps have been started
on the conditioning station. As it is late
in the day for David he will make the turbo |
|
345
|
Wednesday, May 15, 2013, 10:20 |
Bevan Moss | Conditioning Station | Repair | | | Roof top chiller failed | I have been getting a fault on the roof
top chiller for the 2 tandem 7.5 ton chillers.
I have checked and we have water flow and |
|
1511
|
Thursday, April 27, 2017, 16:58 |
Isaac Earle | North Hot-Cell | Development | | | Right side NHC manipulator installed | Installation of the NHC right side
manipulator was completed yesterday. The
three piece manipulator was assembled in |
|
462
|
Tuesday, September 24, 2013, 14:46 |
Bevan Moss | South Hot-Cell | Repair | | | Right manipulator repair | |
|
486
|
Wednesday, October 02, 2013, 13:44 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | | Right Coil is leaking | Today Maico and Travis completed
and electrical test to determine the right
and left coil on TM4. The left coil is the |
|
2512
|
Thursday, December 21, 2023, 09:37 |
Ferran Boix Pamies | ITE | Development | | | Rewiring of TC multiping wires | Thursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger |
|
1962
|
Wednesday, August 14, 2019, 11:43 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 and no target. | Results of electrical checks post beam at the south hot cell. | Here are the results of the electrical
done at the south hot cell post beam of with
the Ta#58 target attached and with just the |
|
1681
|
Monday, January 22, 2018, 07:47 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Restarted TM3 vacuum sysytem after site power bump | All TCS and TM3 vacuum pumps are
started successfully. |
|
1858
|
Monday, January 14, 2019, 07:07 |
David Wang | Conditioning Station | Maintenance | TM2 | | Restarted TCS vacuum system . | No issue. |
|
2093
|
Wednesday, May 20, 2020, 13:19 |
David Wang | ITE | Maintenance | | | Restart of ITE turbo pumps. | PLC6 drop out in weekend caused the ITH
MP1 and MP1s stopped. ITE turbo pumps were
running still after that. Without back up |
|
614
|
Thursday, March 06, 2014, 12:59 |
David Wang | Conditioning Station | Maintenance | TM1 | | Restart TM1 and CS TPs | Restarted TM1 and CS turbo pumps after
the power off. Everything is fine . |
|
1843
|
Wednesday, January 02, 2019, 10:26 |
Anders Mjos | Conditioning Station | Standard Operation | | | Restarrted TP1S | Found pumps off after the holidays. Restarted
roughing pump and TP1S |
|
846
|
Tuesday, February 17, 2015, 13:07 |
Anders Mjos | ITW | Development | | | Resistance measured of TGHT and TBHT lines to ITW | See e-log entry
for ITE for details. The copper bars have
not been removed. They can be used for testing |
|
903
|
Tuesday, April 28, 2015, 11:09 |
Anders Mjos | ITW | Maintenance | | | Resistance measured of TGHT and TBHT lines to ITW | The new TBHT and TGHT power supplies were
brough up to high current; 350 A and 420
A respectively. The TGHT power supply was |
|
845
|
Tuesday, February 17, 2015, 13:06 |
Anders Mjos | ITE | Development | | | Resistance measured of TGHT and TBHT lines to ITE | The copper bars was installed by David
and Anders. After the measurements were completed,
the copper bars were removed. |
|
2609
|
Thursday, June 13, 2024, 11:44 |
David Wang | Conditioning Station | Repair | TM2 | | Replaced several o ring seals on TM2 service cap. | couple of E-8 to low E-7 atm.cc/sec
leak were found on TM2 service cap top air
to vacuum o rings. Replaced these |
|
992
|
Friday, July 10, 2015, 14:41 |
Anders Mjos | Conditioning Station | Maintenance | TM1 | | Replaced roughing pump | The roughing pump was replaced with
a more leak tight pump due to the discovery
of Rn-220 migration while roughing on TM1 |
|