  1823   Thursday, November 22, 2018, 08:53 Anders MjosITWStandard OperationTM2UC#25Block move

Frank and Anders moved blocks from ITE to ITW yesterday

  1824   Thursday, November 22, 2018, 08:55 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal limit switch installed

Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system.

Attachment 1: FC5_limit_switch.jpg
FC5_limit_switch.jpg
  1846   Friday, January 04, 2019, 08:48 David WangITWStandard OperationTM2 TM2 has been disconnected in ITW.

TP1, TP2 are still connected for next week leak check. All water lines in TM2 are purged with 80 psi air, each for 5 minutes.

TP1 and TP2 had been disconnected. TM2 with UCx 25  disconnection checklist, See attachment.

Attachment 1: UCx25_TM2_disconnection_checklist.pdf
UCx25_TM2_disconnection_checklist.pdf UCx25_TM2_disconnection_checklist.pdf
  1848   Tuesday, January 08, 2019, 08:49 David WangITWStandard OperationTM2 TP1 TP1 have been disconnected in ITW

Started argon venting of ITW now.

  1850   Wednesday, January 09, 2019, 10:47 Travis CaveSouth Hot-CellStandard OperationTM2UC#25Module move

 TM#4 with UC#25 has been moved from ITW to the south hot cell.

  1851   Wednesday, January 09, 2019, 13:08 Travis CaveSouth Hot-CellStandard OperationTM2UC#25Electrical Check

 Electrical check of the target module with the UC#25 attached after the beam run.

Attachment 1: Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf
Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf
  1853   Thursday, January 10, 2019, 09:26 Travis CaveConditioning StationStandard OperationTM2no targetModule move

 TM#2 has been moved from the south hot cell to the conditioning station.

  1854   Thursday, January 10, 2019, 10:45 David WangConditioning StationStandard OperationTM2 TM2 is under vacum at TCS.

TCS: TP1, TP2 and TP1S are started.

  1856   Friday, January 11, 2019, 13:17 David WangConditioning StationStandard OperationTM2 TCS and TM2 vacuum system are switched off for this Sunday power outage.

I will restart all pumps Monday morning.  

  1858   Monday, January 14, 2019, 07:07 David WangConditioning StationMaintenanceTM2 Restarted TCS vacuum system .

No issue.

  1861   Tuesday, January 22, 2019, 09:56 David WangITWMaintenanceTM2 ITW water system maintenance.

ITW water system maintenance is done. All working paddle wheels and coils are replaced. ITW water system polyurethane tubes are replaced as well. Two 3/8" leak small valves on return lines are replaced. 85 liters of tritium water are transferred from storage tank to B2 level holding tank. LALC water are refilled into S-tank. Restarted pump and checked system. Everything works fine now. No water leak has been found so far.  

  1863   Monday, January 28, 2019, 10:41 David WangConditioning StationRepairTM2 TM2 water lines helium pressure test at TCS

leak detector base LR: 0.0Xe-9atm.cc/sec. helium 70 psi. test time : 3 minutes for each circuit.The results in atm.cc/sec are Ta+(A):1.8  XE-8. TA-(B):0.0xE-9. Tu-(C):1.2XE-7. TU+(D):1.6XE-7. Coil 2 (PQ):0.0XE-9. Coil 1 (RU):0.0XE-9. MSP:2.2XE-7. EE:1.0XE-7. HS:N/A. Window:5.8XE-9

  1866   Thursday, February 14, 2019, 07:13 David WangConditioning StationStandard OperationTM2 TCS vacuum pumps have been stopped.

Preparation on TM2 move from TCS to SHC.

  1867   Thursday, February 14, 2019, 14:02 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move

 TM#2 has been moved from the conditioning station to the south hot cell.

  1870   Tuesday, February 19, 2019, 10:20 chad fisherSouth Hot-CellRepairTM2 Containment box removed

Containment box has been removed from TM2 in preparation for source tray removal. I will walk Aaron through removal of the optics tray today also.

  1871   Tuesday, February 19, 2019, 11:56 chad fisherSouth Hot-CellRepairTM2 Optics tray removal

Aaron has removed the optics tray in TM2 in preparation for source tray removal.

  1872   Wednesday, February 20, 2019, 09:07 chad fisherSouth Hot-CellRepairTM2 Module side waterblock jig

I have installed the module side water block jig.

  1874   Friday, February 22, 2019, 10:31 chad fisherSouth Hot-CellRepairTM2 TM2 Source tray removal

The source tray has been removed from TM2.

Attachment 1: 20190220_090149.jpg
20190220_090149.jpg
Attachment 2: 20190222_100828.jpg
20190222_100828.jpg
Attachment 3: 20190222_101507.jpg
20190222_101507.jpg
Attachment 4: 20190222_101507.jpg
20190222_101507.jpg
Attachment 5: 20190222_101624.jpg
20190222_101624.jpg
Attachment 6: 20190222_102240.jpg
20190222_102240.jpg
  1875   Monday, February 25, 2019, 09:44 chad fisherSouth Hot-CellRepairTM2 Water block jig

module side water block jig has been removed in preparation for electrical checks.

  1876   Tuesday, February 26, 2019, 08:51 chad fisherSouth Hot-CellRepairTM2 TM2 containment box

The containment box has been reinstalled onto TM2 in prepatation for testing in the conditioning station.