Entry  Wednesday, March 06, 2013, 12:50, Travis Cave, South Hot-Cell, Maintenance, , , module move 
ITW EX1 have been moved back to the west target station from the south hot cell.
Entry  Wednesday, March 06, 2013, 14:12, David Wang, ITW, Repair, , , ITW EXIT1 tank to module o-ring replacement 
 ITW EXIT1  o-ring replacement is fininshed today. The ITW EXIT 1 is back to ITW.
The old o-ring lost most its elastic property and changed  to stiff sqaure shape inside the slot.The flange surface around the o-ring slot  was dirty.
I cleaned the o-ring surface completely before putting the new o-ring  . Everything should be fine now. There will be a leak check late
Entry  Tuesday, March 12, 2013, 09:18, chad fisher, South Hot-Cell, Repair, TM4, , Ground Electrode Leak 
On Monday, March 11 the containment box was removed from TM4 and a vacuum leak check preformed in an attempt to locate the leak in the ground electrode
circuit.
Following Pierre's work plain helium was sprayed was the highest joint accessible towards the lowest.
Entry  Wednesday, March 13, 2013, 07:22, chad fisher, South Hot-Cell, Repair, TM4, , Ground Electrode Leak / Inspection Results IMG_3449.JPGIMG_3450.JPGIMG_3451.JPGIMG_3452.JPGIMG_3454.JPG
Further attempts to localize the leak were unsucessful. The circuit was pressurized with 60 psi air and snoop solution was applied to both the braze
joints and the mating surface between the two halfs of the water blocks. Unfortunately, no visible bubbles could be dectected.
This was reported to Grant and Pierre and it was decided to continue with removing one of the vcr gaskets from the optics cooling lines (on the
Entry  Wednesday, March 13, 2013, 11:23, chad fisher, South Hot-Cell, Repair, TM4, , Ground Electrode Leak 
The containment box has been re-installed and the window waterlines reconnected and leak checked.
The window lines did pass the leak check, however the leak dectoctor did not pump down past 5.8 x 10-9.
The front cover has also been reinstalled.
Entry  Wednesday, March 13, 2013, 14:30, Bevan Moss, Conditioning Station, Development, , , Faraday Cup 
 Dave Morris and I investigated the Faraday Cup today. It was found to be plumed in the wrong direction (fails in). This is not an issue for the
conditioning station as there is nothing down stream from the cup. Dave will change the controls to reflect this.
Entry  Thursday, March 14, 2013, 07:09, David Wang, South Hot-Cell, Standard Operation, TM4, , TM4 electrical test at SHC after windown and containment box back. 
TM4 electrical test at SHC after windown and containment box back is done. Everything is fine. 
Entry  Thursday, March 14, 2013, 07:18, David Wang, South Hot-Cell, Standard Operation, TM4, , TM4 window cooling line leak check 
It took a long time(more than 1 hour)   to pump down the TM4 window  cooling line during leak check time. The base leak rate could only be
pumped to 5.8xE-9 atm.cc/sec.Base pressure is 0.0xE-4 torr which is bottom reading. Chad and i did the leak check at this base leak rate .No leak had been
found. The window cooling line is leak tight at this stage. A pressure helium test will be fulfilled in conditioning station on this cooling line later.
Entry  Wednesday, March 20, 2013, 08:19, David Wang, Conditioning Station, Repair, TM4, , Leak check new installed TM4 TP1 at conditioning station. 
I leak checked new installed TM4 TP1 at conditioning station. The CS vacuum gauges reading were at 1.0-1.5xE-6 torr . Leak detector base leak rate 0.0xe-9atm.cc/sec,
base pressure 0.0xe-4torr. I sprayed helium around the pump  inlet flange and KF 25 pump outlet flange to pump joint. There is no response on leak
detector. The new installed TP1 is leak tight.
Entry  Friday, April 12, 2013, 10:32, David Wang, ITW, Repair, TM1, , ITW EXIT1 tank to module o-ring leak check. 
I leak checked new installed ITW EXIT1 tank to module o-ring.No leak had been found . Also ,TM1 primary vessel air to vacuum seals had been checked at
the same time. There was no response had been found on leak detector.
Entry  Monday, April 15, 2013, 11:00, chad fisher, South Hot-Cell, Standard Operation, TM3, , Items for TM3 dummy target installation 
New gaskets and fasteners have been inserted into the south hot cell in preparation for installing the dummy target onto TM3 tomorrow.
Entry  Tuesday, April 16, 2013, 11:20, chad fisher, South Hot-Cell, Repair, TM3, , TM3 Referb. start IMG_3523.JPGIMG_3524.JPG
Front containment box cover has been removed and heat shield circuit blank offs removed in preparation for installation of dummy target.
 image #1 - initail view after front panel removal.
image #2 - Heat shield circuit blank offs removed.
Entry  Wednesday, April 17, 2013, 09:02, chad fisher, South Hot-Cell, Repair, TM3, , TM3 ready for conditioning station 
The heat shield circuit blank offs have been re-installed and front cover replaced. TM3 is ready to move to the conditioning station for testing.
Entry  Wednesday, April 17, 2013, 10:35, David Wang, ITE, Standard Operation, TM4, , I moved 5 shielding blocks back to ITE. 
5 shielding block had been moved  back to ITE. The ITE is configured to take proton beam.
Entry  Monday, April 22, 2013, 09:33, David Wang, Conditioning Station, Repair, TM3, , Leak check TM3 at conditioning station 
TM3 leak check at conditioning station without target: TM3 all air to vacuum seals have been leak checked . They are all good. Water lines TAR(+-), TUBE(+-),
GAS, MSP , COIL2(+-), EE, HS(1,2) , GE,and WINDOW have been helium pressurized to 70 psi for 2 minutes each . No response had been found on leak detector.
They are leak tight.. Leak detector BR 0.0xE-9atm.cc/sec, BP 0.0xE-4 torr. TM3 and CS vacuum: PNG15.2xE-6 torr, IG1 8.8xE-7 torr,IG2 2.8xE-6torr, IG1S
Entry  Wednesday, April 24, 2013, 09:00, Bevan Moss, Conditioning Station, Development, , , New user testing 
 Controls has created a new user group that can operate the conditioning station but cannot use any of the bypasses or forces. The cooling package
will be used to test this new profile. The main loop bypass has been opened to allow this testing to happen without the risk of over pressure.
Entry  Wednesday, April 24, 2013, 10:36, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 
The F-308's have been serviced and are ready to be filled. All inspection records are stored  in docushare.
https://documents.triumf.ca/docushare/dsweb/View/Collection-1085
Entry  Wednesday, April 24, 2013, 11:48, chad fisher, South Hot-Cell, Repair, TM3, , TM3 Source Tray Removal 
Work on TM3 source tray removal started at 10:40 am today.
The containment box has been removed, and disconnection of the optics tray is 90 complete.
 
Entry  Wednesday, April 24, 2013, 14:09, chad fisher, South Hot-Cell, Repair, TM3, , TM3 Refurbishment E.O.D.  
Optics tray has been removed from module.
Waterblock jig installation has commenced. Of note, jig installation on TM3 has proven more dificult than the previous installation on TM2. Many
of the waterblock assemblies are skewed (not perpendicular to plane that they should be...perpendicular to).
Entry  Friday, April 26, 2013, 11:20, chad fisher, South Hot-Cell, Repair, TM3, , Water Block Jig (back half) 
The back half of the water block jig (services tray side) has been sucessfully located onto the module.
About 50% of the waterblocks have centered themselfs it their respective cups and the rest look good for concentricity but will require some gentle
wiggling to get them to seat.