Monday, May 05, 2014, 13:05, David Wang, ITE, Repair, TM3, , ITE target module flange seal has been replaced.
Monday, May 05, 2014, 13:11, David Wang, ITE, Repair, TM3, , ITE Entrance module has been disconnected.
Wednesday, May 07, 2014, 10:08, David Wang, ITE, Repair, TM3, , ITE entrance module flange seal had been replaced.
7x
Wednesday, May 07, 2014, 10:15, David Wang, ITE, Repair, TM3, , ITE TM3, entrance module and BL2A3 window flange seals leak check..
Thursday, May 15, 2014, 14:38, David Wang, ITE, Repair, TM3, TM3, Bias short on ITE
Monday, June 02, 2014, 11:59, David Wang, South Hot-Cell, Standard Operation, TM1, , Leak check on TM1 HS water line with new UC9# target installed
Monday, June 02, 2014, 15:40, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started
Tuesday, June 03, 2014, 09:12, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, TM1 HS line helium pressure test and TM1 electrical check at CS
7x
Monday, June 09, 2014, 10:33, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, Stop TM1 and CS trubo pumps and ruff pump.
Tuesday, June 10, 2014, 07:57, David Wang, Conditioning Station, Standard Operation, TM1, UC#9, TM1 are vented with argon and disconnected at CS.
Tuesday, June 10, 2014, 14:02, David Wang, ITW, Standard Operation, TM1, UC9#, TM1 and ITW turbo pumps have been started.
Tuesday, June 17, 2014, 10:46, David Wang, ITW, Standard Operation, TM1, UC#9, 5 Shielding blocks have been transferred from ITE to ITW.
Thursday, June 26, 2014, 10:57, David Wang, South Hot-Cell, Standard Operation, TM3, , Leak check on TM3 HS water line with new target. installed.
Friday, June 27, 2014, 10:16, David Wang, Conditioning Station, Standard Operation, TM3, , TM3 HS water lines helium pressure test. at CS
Wednesday, July 02, 2014, 14:29, David Wang, ITE, Standard Operation, , , Reconnected TM3 in ITE.
Tuesday, July 08, 2014, 09:57, David Wang, ITE, Standard Operation, TM3, , 5 Shielding blocks have been transferred from ITW to ITE.
Wednesday, July 16, 2014, 11:28, David Wang, ITW, Standard Operation, TM1, , TM1 had been dsiconnected in ITW.
Thursday, July 17, 2014, 10:13, David Wang, Conditioning Station, Standard Operation, TM1, , Leak check on TM1 HS water line with new target installed
Thursday, July 17, 2014, 11:49, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started
Monday, July 21, 2014, 13:11, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS.