Entry  Thursday, November 22, 2018, 08:53, Anders Mjos, ITW, Standard Operation, TM2, UC#25, Block move 

Frank and Anders moved blocks from ITE to ITW yesterday

Entry  Thursday, November 22, 2018, 08:55, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal limit switch installed FC5_limit_switch.jpg

Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system.

Entry  Friday, January 04, 2019, 08:48, David Wang, ITW, Standard Operation, TM2, , TM2 has been disconnected in ITW. UCx25_TM2_disconnection_checklist.pdf

TP1, TP2 are still connected for next week leak check. All water lines in TM2 are purged with 80 psi air, each for 5 minutes.

TP1 and TP2 had been disconnected. TM2 with UCx 25  disconnection checklist, See attachment.

Entry  Tuesday, January 08, 2019, 08:49, David Wang, ITW, Standard Operation, TM2, , TP1 TP1 have been disconnected in ITW 

Started argon venting of ITW now.

Entry  Wednesday, January 09, 2019, 10:47, Travis Cave, South Hot-Cell, Standard Operation, TM2, UC#25, Module move 

 TM#4 with UC#25 has been moved from ITW to the south hot cell.

Entry  Wednesday, January 09, 2019, 13:08, Travis Cave, South Hot-Cell, Standard Operation, TM2, UC#25, Electrical Check Electrical_Chk_TM#2_UC#25_post_beam_Jan-09-2019.pdf

 Electrical check of the target module with the UC#25 attached after the beam run.

Entry  Thursday, January 10, 2019, 09:26, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, Module move 

 TM#2 has been moved from the south hot cell to the conditioning station.

Entry  Thursday, January 10, 2019, 10:45, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 is under vacum at TCS. 

TCS: TP1, TP2 and TP1S are started.

Entry  Friday, January 11, 2019, 13:17, David Wang, Conditioning Station, Standard Operation, TM2, , TCS and TM2 vacuum system are switched off for this Sunday power outage.  

I will restart all pumps Monday morning.  

Entry  Monday, January 14, 2019, 07:07, David Wang, Conditioning Station, Maintenance, TM2, , Restarted TCS vacuum system . 

No issue.

Entry  Tuesday, January 22, 2019, 09:56, David Wang, ITW, Maintenance, TM2, , ITW water system maintenance. 

ITW water system maintenance is done. All working paddle wheels and coils are replaced. ITW water system polyurethane tubes are replaced as well. Two 3/8" leak small valves on return lines are replaced. 85 liters of tritium water are transferred from storage tank to B2 level holding tank. LALC water are refilled into S-tank. Restarted pump and checked system. Everything works fine now. No water leak has been found so far.  

Entry  Monday, January 28, 2019, 10:41, David Wang, Conditioning Station, Repair, TM2, , TM2 water lines helium pressure test at TCS 

leak detector base LR: 0.0Xe-9atm.cc/sec. helium 70 psi. test time : 3 minutes for each circuit.The results in atm.cc/sec are Ta+(A):1.8  XE-8. TA-(B):0.0xE-9. Tu-(C):1.2XE-7. TU+(D):1.6XE-7. Coil 2 (PQ):0.0XE-9. Coil 1 (RU):0.0XE-9. MSP:2.2XE-7. EE:1.0XE-7. HS:N/A. Window:5.8XE-9

Entry  Thursday, February 14, 2019, 07:13, David Wang, Conditioning Station, Standard Operation, TM2, , TCS vacuum pumps have been stopped. 

Preparation on TM2 move from TCS to SHC.

Entry  Thursday, February 14, 2019, 14:02, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 

 TM#2 has been moved from the conditioning station to the south hot cell.

Entry  Tuesday, February 19, 2019, 10:20, chad fisher, South Hot-Cell, Repair, TM2, , Containment box removed 

Containment box has been removed from TM2 in preparation for source tray removal. I will walk Aaron through removal of the optics tray today also.

Entry  Tuesday, February 19, 2019, 11:56, chad fisher, South Hot-Cell, Repair, TM2, , Optics tray removal 

Aaron has removed the optics tray in TM2 in preparation for source tray removal.

Entry  Wednesday, February 20, 2019, 09:07, chad fisher, South Hot-Cell, Repair, TM2, , Module side waterblock jig 

I have installed the module side water block jig.

Entry  Friday, February 22, 2019, 10:31, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Source tray removal 6x

The source tray has been removed from TM2.

Entry  Monday, February 25, 2019, 09:44, chad fisher, South Hot-Cell, Repair, TM2, , Water block jig 

module side water block jig has been removed in preparation for electrical checks.

Entry  Tuesday, February 26, 2019, 08:51, chad fisher, South Hot-Cell, Repair, TM2, , TM2 containment box 

The containment box has been reinstalled onto TM2 in prepatation for testing in the conditioning station.