676
|
Tuesday, June 03, 2014, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | TM1 HS line helium pressure test and TM1 electrical check at CS | TM1 HS line helium pressure test and TM1
electrical check at CS under vacuum are finished.
Everything is good. See attachment |
7x |
677
|
Monday, June 09, 2014, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | Stop TM1 and CS trubo pumps and ruff pump. | The CS and TM1 is still under vacuum. They
will be vented with argon tomorrow mornig |
|
678
|
Tuesday, June 10, 2014, 07:57 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#9 | TM1 are vented with argon and disconnected at CS. | TM1 will be moved to ITW this morning. |
|
680
|
Tuesday, June 10, 2014, 14:02 |
David Wang | ITW | Standard Operation | TM1 | UC9# | TM1 and ITW turbo pumps have been started. | TM1 has been connected to ITW. It is pumping
down in ITW with 6 turbo-pumps on. |
|
683
|
Tuesday, June 17, 2014, 10:46 |
David Wang | ITW | Standard Operation | TM1 | UC#9 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 shielding blocks have been transferred
from ITE to ITW. ITW is configured to take
proton beam. Argon venting system for ITW |
|
692
|
Thursday, June 26, 2014, 10:57 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Leak check on TM3 HS water line with new target. installed. | Chad and I leak checked the TM3 HS water
line with new target installed. No
leak has been found during the check. Leak |
|
695
|
Friday, June 27, 2014, 10:16 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TM3 HS water lines helium pressure test. at CS | TM3 HS water line helium pressure test
is done at CS. 70 psi helium , 3 minutes.Base
LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 |
|
698
|
Wednesday, July 02, 2014, 14:29 |
David Wang | ITE | Standard Operation | | | Reconnected TM3 in ITE. | I reconnected TM3 in ITE. All turbo pumps
have been started. The water supply to TM3
only in ITE. The HV keys are back to electrical |
|
700
|
Tuesday, July 08, 2014, 09:57 |
David Wang | ITE | Standard Operation | TM3 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
702
|
Wednesday, July 16, 2014, 11:28 |
David Wang | ITW | Standard Operation | TM1 | | TM1 had been dsiconnected in ITW. | The TM1 and ITW were vented with
argon gas last night. TM1 had been disconnected
in ITW this morning. |
|
708
|
Thursday, July 17, 2014, 10:13 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure: |
|
709
|
Thursday, July 17, 2014, 11:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | I connected TM1 at CS. All turbo pumps
have been started. The pumping down is
good so far. |
|
710
|
Monday, July 21, 2014, 13:11 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | The TM1 HS line is pressure tested
this morning with 70 psi helium at
CS. No response has been found on leak detector. |
|
711
|
Tuesday, July 22, 2014, 07:32 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Stop TM1 and CS turbo pumps and ruff pump. | Stop TM1 and CS turbo pumps and ruff pump.
TM1 is disconnect at CS. It will be vented
tomorrow morning and moved to ITW. |
|
712
|
Wednesday, July 23, 2014, 13:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 in ITW. | TM1 has been connected in ITW .
The new roughing pump replaced on last Friday
works good. I started all turbo pumps in |
|
716
|
Monday, July 28, 2014, 14:37 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D)and -(C)water lines. |
TM2 installed in Conditioning
Station
Varian Leak detector
connected directly to Target Module 2 |
7x |
717
|
Monday, July 28, 2014, 14:45 |
David Wang | Conditioning Station | Development | TM2 | | turned off TM2 and CS turbo pumps. | I turned off TM2 and CS turbo-pumps. TM2
will be moved from CS to silo tomorrow morning. |
|
722
|
Tuesday, August 05, 2014, 11:53 |
David Wang | ITE | Repair | | | Reconnected ITE entrance module | ITE entrance module is reconnected in ITE. |
|
726
|
Thursday, August 07, 2014, 13:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx #10 | Leak check on TM4 HS water line with new UCX target. | Isaac and I leak checked TM4 HS line with
new UCX target. The leak detector base LR
0.0xE-9 atm.cc/sec, base pressure0.0xE-4torr. |
|
727
|
Thursday, August 07, 2014, 17:07 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx #10 | TM4 is connected in CS. | TM4 is connected at CS. All turbo pumps
are started. The pumping down is good so
far. |
|