Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 717     Entry time: Monday, July 28, 2014, 14:45
Author: David Wang 
Category: Conditioning Station 
Type: Development 
Module: TM2 
Target/Number:  
Subject: turned off TM2 and CS turbo pumps. 

I turned off TM2 and CS turbo-pumps. TM2 will be moved from CS to silo tomorrow morning.

ELOG V2.9.2-2455