Tuesday, June 03, 2014, 09:12, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, TM1 HS line helium pressure test and TM1 electrical check at CS 7x
|
TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment |
Monday, June 09, 2014, 10:33, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, Stop TM1 and CS trubo pumps and ruff pump.
|
The CS and TM1 is still under vacuum. They will be vented with argon tomorrow mornig |
Tuesday, June 10, 2014, 07:57, David Wang, Conditioning Station, Standard Operation, TM1, UC#9, TM1 are vented with argon and disconnected at CS.
|
TM1 will be moved to ITW this morning. |
Tuesday, June 10, 2014, 14:02, David Wang, ITW, Standard Operation, TM1, UC9#, TM1 and ITW turbo pumps have been started.
|
TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on. |
Tuesday, June 17, 2014, 10:46, David Wang, ITW, Standard Operation, TM1, UC#9, 5 Shielding blocks have been transferred from ITE to ITW.
|
5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also. |
Thursday, June 26, 2014, 10:57, David Wang, South Hot-Cell, Standard Operation, TM3, , Leak check on TM3 HS water line with new target. installed.
|
Chad and I leak checked the TM3 HS water line with new target installed. No leak has been found during the check. Leak detector base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr. The line will be helium pressurized at CS later. |
Friday, June 27, 2014, 10:16, David Wang, Conditioning Station, Standard Operation, TM3, , TM3 HS water lines helium pressure test. at CS
|
TM3 HS water line helium pressure test is done at CS. 70 psi helium , 3 minutes.Base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr. No response. The line is leak free. |
Wednesday, July 02, 2014, 14:29, David Wang, ITE, Standard Operation, , , Reconnected TM3 in ITE.
|
I reconnected TM3 in ITE. All turbo pumps have been started. The water supply to TM3 only in ITE. The HV keys are back to electrical room. |
Tuesday, July 08, 2014, 09:57, David Wang, ITE, Standard Operation, TM3, , 5 Shielding blocks have been transferred from ITW to ITE.
|
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam. |
Wednesday, July 16, 2014, 11:28, David Wang, ITW, Standard Operation, TM1, , TM1 had been dsiconnected in ITW.
|
The TM1 and ITW were vented with argon gas last night. TM1 had been disconnected in ITW this morning. |
Thursday, July 17, 2014, 10:13, David Wang, Conditioning Station, Standard Operation, TM1, , Leak check on TM1 HS water line with new target installed
|
Chad and I leak checked TM1 HS waterline with new target installed at SHC. The LD base LR:0.0xE-9atm.cc/sec, base pressure: 0.0xE-4 torr. Chad sprayed helium on both VCR fittings and flushed helium around the target. No response has been found on leak detector. The target HS line is leak tight so far. I will do helium pressure test on this line at CS on next Monday. |
Thursday, July 17, 2014, 11:49, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started
|
I connected TM1 at CS. All turbo pumps have been started. The pumping down is good so far. |
Monday, July 21, 2014, 13:11, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS.
|
The TM1 HS line is pressure tested this morning with 70 psi helium at CS. No response has been found on leak detector. |
Tuesday, July 22, 2014, 07:32, David Wang, Conditioning Station, Standard Operation, TM1, , Stop TM1 and CS turbo pumps and ruff pump.
|
Stop TM1 and CS turbo pumps and ruff pump. TM1 is disconnect at CS. It will be vented tomorrow morning and moved to ITW. |
Wednesday, July 23, 2014, 13:36, David Wang, ITW, Standard Operation, TM1, , TM1 in ITW.
|
TM1 has been connected in ITW . The new roughing pump replaced on last Friday works good. I started all turbo pumps in ITW. The ITW TP1 controller was broken during the starting time. Dimo and I changed a new controller for ITW TP1 in electrical room. The pumping down is good so far. ITW water supplies to TM1 only. |
Monday, July 28, 2014, 14:37, David Wang, Conditioning Station, Development, TM2, , helium pressure test on TM2 tube heater +(D)and -(C)water lines. 7x
|
- TM2 installed in Conditioning Station
- Varian Leak detector connected directly to Target Module 2 Service cap.
- Vacuum draw in Target Station with both module turbo pumps
- Leak detector baseline normal (10^-4 Torr, 10^-9 Std cc/s He)
- Since no Source tray is installed, and tube heater supply conductor is blanked off in target enclosure, it was necessary to test both supply and return points.
- For each line tested, 80 psi He was connected, and waited ~2 min to for a response on the leak detector.
- Lines tested:
- conductor D (tube heater), Supply -> no He response
- conductor D (tube heater), Return -> no He response
- conductor C (tube heater), Supply -> no He response
- conductor C (tube heater), Return -> no He response
- Based on this leak testing, both supply and return lines of conductors C & D are leak tight under 95 psi He (80 psig He supply to vacuum)
|
Monday, July 28, 2014, 14:45, David Wang, Conditioning Station, Development, TM2, , turned off TM2 and CS turbo pumps.
|
I turned off TM2 and CS turbo-pumps. TM2 will be moved from CS to silo tomorrow morning. |
Tuesday, August 05, 2014, 11:53, David Wang, ITE, Repair, , , Reconnected ITE entrance module
|
ITE entrance module is reconnected in ITE. |
Thursday, August 07, 2014, 13:58, David Wang, South Hot-Cell, Standard Operation, TM4, UCx #10, Leak check on TM4 HS water line with new UCX target.
|
Isaac and I leak checked TM4 HS line with new UCX target. The leak detector base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4torr. Isaac sprayed helium on both VCR connections(5 seconds each) and flushed helium around the target for 6 seconds. No response on leak detector. |
Thursday, August 07, 2014, 17:07, David Wang, Conditioning Station, Standard Operation, TM4, UCx #10, TM4 is connected in CS.
|
TM4 is connected at CS. All turbo pumps are started. The pumping down is good so far. |
|