49
|
Thursday, November 10, 2011, 14:33 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | For the week of November 7th 2011, four
of a possible ten targets that are in storage
were assayed. Targets are as follows: |
|
51
|
Tuesday, November 15, 2011, 13:08 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | | Move ot TM#1 | TM#1 has been moved from the south hot
cell to the conditioning station. Move went
well. |
|
60
|
Monday, November 21, 2011, 13:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 full leak check in conditioning station | TM1 full leak check in conditioning station
has been fulfilled this morning.Both air
to vacuum leak check and waterlines helium |
|
64
|
Thursday, December 15, 2011, 13:08 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | Spent target assay completed. A total of
16 target were looked at, 13 were low enough
to be assayed and those 13 are at shippable |
|
65
|
Wednesday, January 04, 2012, 13:49 |
Travis Cave | Spent Target Vault | Standard Operation | | | Moving the spent targets to mini storage. | Well the first of this year's lucky winners
to win a fabulous one way trip to Chalk River
are as follows. UC#1, UC#2, Ta#25, Ta#26, |
|
66
|
Thursday, January 05, 2012, 11:40 |
Travis Cave | Spent Target Vault | Standard Operation | | | Target swapping | Looks like the UC target s #1 and #2 were
found invalidprize winners for their all
inclusive trip to Chalk River and have thus |
 |
67
|
Monday, January 09, 2012, 14:44 |
David Wang | ITE | Maintenance | TM4 | | ITE and TM4 2012 winter shut down leak check is completed. | I did a vacuum leak check on all ITE primary
vacuum vessel and secondary vessel.I also
did a helium pressure test(80psi ) on all |
|
68
|
Tuesday, January 10, 2012, 11:51 |
Grant Minor | Conditioning Station | Repair | | | IMC at Cond. Station is VENTED - DO NOT PUT MODULE IN | Hi Remote Handling,
The guage on the IMC circuit in the
Target Hall is reading atmosphere, and the |
|
69
|
Thursday, January 12, 2012, 08:43 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent targets to F-308s | All targets in the mini storage have been
moved to F-308s and those flasks have been
moved over to rad waste. The transfer of |
|
70
|
Thursday, January 12, 2012, 14:32 |
David Wang | ITE | Repair | TM4 | | TP2 on TM4 has been replaced | TP2 on TM4 has been replaced with a new
turbo pump , I didnt reset the controller
in electrical room.So this new pump start |
|
71
|
Monday, January 16, 2012, 09:30 |
David Wang | ITE | Maintenance | | | Changed all old inducion coils for flow sensors in ITE | I had changed all old induction coils for
flow sensors in ITE .I checked all ITE water
signals on control boards in electrical room.They |
|
72
|
Wednesday, February 01, 2012, 09:54 |
David Wang | ITW | Maintenance | TM1 | | ITW and TM1 winter shut down vacuum leak check | ITW and TM1 winter shut down vacuum leak
check had been finished yesterday.All ITW
primary vacuum vessel, secondary vacuum vessel, |
|
79
|
Monday, April 02, 2012, 08:17 |
David Wang | Conditioning Station | Development | | | conditioning station IMC pump down. | I pumped down conditioning station IMC
today. The inside bellow pressure is -20
psi on the gauge.Visually checked the bellow |
|
80
|
Tuesday, April 03, 2012, 12:11 |
David Wang | Conditioning Station | Development | | | leak check on conditioning station vacuum system | I did a leak check on conditioning station
vacuum system today.The vacuum system had
been roughed over night . This morning before |
|
81
|
Thursday, April 05, 2012, 10:30 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks back to ITE this morning. | MAA is secured .The ITE and MAA are
ready for taking proton beam now. |
|
83
|
Thursday, April 12, 2012, 14:40 |
David Wang | Conditioning Station | Development | TM1 | | conditioning staion and TM1 is under TP1 and TP2 pumping now. | TM1 moved to conditioning station to today.
After moving, I connected the vacuum system
which include all gauges ,vacuum lines , |
|
84
|
Friday, April 13, 2012, 12:31 |
David Wang | Conditioning Station | Development | TM1 | | TM1 and conditioning station leak check. |
Normal
0
|
|
95
|
Thursday, April 26, 2012, 09:23 |
David Wang | ITE | Repair | TM4 | | changed flow wheel on ITE TM4 contaiment box water circuit | The the magnetic field on ITE TM4 flow
wheel was gone yesterday.So there is
no water signal on this circuit. The water |
|
96
|
Thursday, April 26, 2012, 13:01 |
David Wang | ITE | Repair | TM4 | | Replaced TM4 EE water flow wheel in ITE. | Due to weak magnetic field on TM4 EE water
flow wheel, we have two times intermittent
water signal on this circuit this morning. |
|
97
|
Wednesday, May 02, 2012, 11:27 |
David Wang | ITW | Standard Operation | TM1 | | ITW is ready for taking proton beam. | I moved 5 shielding blocks from ITE
to ITW . I checked all ITW water
signals strength and frequency in electrical |
|