2467
|
Tuesday, July 25, 2023, 16:25 |
Carla Babcock | North Hot-Cell | Standard Operation | | SiC#45 | SiC#45 post irradiation inspection | Looked at SiC#45 in the hot cell. Looked
very clean, no deposits on the heat shield
or other components. Target also looked very |
|
2036
|
Tuesday, December 03, 2019, 12:45 |
Adam Newsome | Spent Target Vault | Standard Operation | | SiC#38 | SiC#38 in Pail 205 moved to Storage Vault: 4B | SiC#38 in Pail 205 was moved to section 4B
of the storage vault. Dose rate when retrieving
from Hot Cell was 22.2 mSv/h. |
|
1649
|
Thursday, October 19, 2017, 14:20 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | SiC#37 | SiC#37 Conditioning | Thursday, October 19, 2017, 14:20: EE configured
for conditioning. HV cage locked up
Thursday, October 19, 2017, 16:46: |
 |
1380
|
Monday, October 24, 2016, 14:44 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#35 | SiC#35 installed | Sic#35 has been installed onto TM2. High
current fasteners torqued to 130 in lbs.
Mating of the 9 pin connector was |
|
1328
|
Tuesday, August 23, 2016, 13:31 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#33 | SiC#33 Removed | SiC#33 has been removed from TM2. |
|
1167
|
Wednesday, March 16, 2016, 14:23 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#32 | SiC#32 removal Target Module Inspection | SiC#32 has been removed from TM2. Quick
inspection shows some troubling discoloration
on the water cooled connection blocks of |
 |
1105
|
Monday, October 19, 2015, 11:53 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#32 | SiC#32 installed on TM2 | SiC#32 has been installed on TM2. High
current fasteners torqued to 130 in lbs. |
|
1172
|
Friday, March 18, 2016, 11:43 |
chad fisher | South Hot-Cell | Standard Operation | | | SiC#32 dissection | SiC#32 has been open for inspection. |
   |
1023
|
Tuesday, July 28, 2015, 14:40 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 UCx#13 | SiC#31 removed UCx#13 installed | SiC#31 has been removed from TM4 and UCx#13
installed. UCx#13 connection to the 9 pin
connector was VERY VERY tight to the tube |
|
924
|
Tuesday, June 02, 2015, 09:43 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 | SiC#31 installed | Ta #45 has been removed from TM4 and SIC#31installed. |
|
1022
|
Tuesday, July 28, 2015, 14:36 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 | SiC#31 Autopsy | Extraction electrode was removed from SiC#31
and target inspected.
Pictures of findings can be found |
|
720
|
Thursday, July 31, 2014, 08:08 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | SiC#30 | SiC#30 Removed and inpect | SiC#30 has been removed from TM3. A quick
exam of TM3 source tray did not yield
any obvious signs of damage. |
   |
105
|
Friday, May 18, 2012, 08:17 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#27 | SiC#27 Installed | SiC#27 has been installed onto TM4. Fit
was very good. All electrical connections
double checked with mirror. |
|
101
|
Tuesday, May 15, 2012, 12:14 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#26 | SiC#26 removal TM4 degredation | SiC#26 was removed from target module #4
this morning. Target shows the now standard
arc marks on the 9 pin connector housing...pictures |
19x |
42
|
Friday, October 28, 2011, 09:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#26 HP Febiad | SiC#26 installed on TM4 | HP febiad target SiC#26 was installed onto
Tm4 on Monday morning.
"JP's" connector required |
|
233
|
Thursday, January 17, 2013, 10:06 |
chad fisher | South Hot-Cell | Standard Operation | | | SiC Test Target for TM4/CS | I have inserted the test target for TM4
and the CS into the hot cell.
I had some concerns about the condition |
16x |
918
|
Tuesday, May 26, 2015, 14:34 |
chad fisher | South Hot-Cell | Repair | TM2 | | Shutter replacement | The shutter in TM2 was successfully replaced
today.
New lock washer and nut were installed |
|
915
|
Wednesday, May 13, 2015, 13:55 |
chad fisher | South Hot-Cell | Repair | TM2 | | Shutter removal | TM2 has been successfully de-shuttered.
All went pretty much according to
plan except I had to remove one fastener |
 |
1670
|
Friday, December 22, 2017, 11:09 |
Anders Mjos | ITW | Standard Operation | TM2 | | Shut down High Active Cooling water | Stopped MP1 today in preparation for the
power outage over the holidays. both P-25
and P-26 breakers have been switched off |
|
1145
|
Tuesday, December 01, 2015, 11:47 |
Anders Mjos | Conditioning Station | Maintenance | TM4 | UC#14 | Short on Extraction Electrode | After conditioning over the weekend
the EE developed a short. This was confirmed
by measuring the resistance between EE and |
|