71
|
Monday, January 16, 2012, 09:30 |
David Wang | ITE | Maintenance | | | Changed all old inducion coils for flow sensors in ITE | I had changed all old induction coils for
flow sensors in ITE .I checked all ITE water
signals on control boards in electrical room.They |
|
72
|
Wednesday, February 01, 2012, 09:54 |
David Wang | ITW | Maintenance | TM1 | | ITW and TM1 winter shut down vacuum leak check | ITW and TM1 winter shut down vacuum leak
check had been finished yesterday.All ITW
primary vacuum vessel, secondary vacuum vessel, |
|
79
|
Monday, April 02, 2012, 08:17 |
David Wang | Conditioning Station | Development | | | conditioning station IMC pump down. | I pumped down conditioning station IMC
today. The inside bellow pressure is -20
psi on the gauge.Visually checked the bellow |
|
80
|
Tuesday, April 03, 2012, 12:11 |
David Wang | Conditioning Station | Development | | | leak check on conditioning station vacuum system | I did a leak check on conditioning station
vacuum system today.The vacuum system had
been roughed over night . This morning before |
|
81
|
Thursday, April 05, 2012, 10:30 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks back to ITE this morning. | MAA is secured .The ITE and MAA are
ready for taking proton beam now. |
|
83
|
Thursday, April 12, 2012, 14:40 |
David Wang | Conditioning Station | Development | TM1 | | conditioning staion and TM1 is under TP1 and TP2 pumping now. | TM1 moved to conditioning station to today.
After moving, I connected the vacuum system
which include all gauges ,vacuum lines , |
|
84
|
Friday, April 13, 2012, 12:31 |
David Wang | Conditioning Station | Development | TM1 | | TM1 and conditioning station leak check. |
Normal
0
|
|
95
|
Thursday, April 26, 2012, 09:23 |
David Wang | ITE | Repair | TM4 | | changed flow wheel on ITE TM4 contaiment box water circuit | The the magnetic field on ITE TM4 flow
wheel was gone yesterday.So there is
no water signal on this circuit. The water |
|
96
|
Thursday, April 26, 2012, 13:01 |
David Wang | ITE | Repair | TM4 | | Replaced TM4 EE water flow wheel in ITE. | Due to weak magnetic field on TM4 EE water
flow wheel, we have two times intermittent
water signal on this circuit this morning. |
|
97
|
Wednesday, May 02, 2012, 11:27 |
David Wang | ITW | Standard Operation | TM1 | | ITW is ready for taking proton beam. | I moved 5 shielding blocks from ITE
to ITW . I checked all ITW water
signals strength and frequency in electrical |
|
98
|
Tuesday, May 08, 2012, 10:28 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | I disconnected TM4 in ITE. The heat shield
water circuit is purged. I closed the
water supply to ITE.Now, the water system |
|
113
|
Friday, May 25, 2012, 10:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | Moving the spent targets to mini storage. | Five targets were moved to the mini storage
today in preparation for transfer of the
targets to the F308s later next week. The |
 |
114
|
Monday, May 28, 2012, 13:05 |
David Wang | ITE | Standard Operation | | | I moved 5 shielding blocks from ITW to ITE . | 5 shielding blocks have been transferred
from ITW to ITE. ITE ventilation is
opened, and ITW closed. All ITE water |
|
117
|
Wednesday, June 06, 2012, 08:21 |
David Wang | ITW | Standard Operation | TM1 | | TM1 disconnected in ITW | I disconnected TM1 in ITW yesterday morning.The
general radioactive level in ITW over the
TM top (300mm) is about 350 usv/hr. contacting |
|
134
|
Monday, June 25, 2012, 14:39 |
David Wang | ITW | Standard Operation | | | I moved 5 shielding blocks from ITE to ITW, | and set up ventilation for ITW. ITW is
ready for taking proton beam now. All water
interlock checks for ITW are done. The ITW |
|
135
|
Tuesday, June 26, 2012, 14:10 |
David Wang | South Hot-Cell | Repair | TM3 | | TM3 heat shield and window circuits leak check is done. | Chad and i did a leak check on TM3 heat
shield and window circuits.Both circuits
are pumped easily down to the bottom leak |
|
136
|
Tuesday, July 03, 2012, 10:50 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | I disconnected TM4 in ITE this morning.
The window circuit and heat shield circuit
had been purged. The general field inside |
|
146
|
Friday, July 13, 2012, 16:33 |
Bevan Moss | Crane | Repair | | | Crane has stopped working | In the AM today David and I used the crane
to raise the ground plate sheet metal into
place. This afternoon when I attempted to |
|
147
|
Monday, July 16, 2012, 11:55 |
Bevan Moss | Crane | Repair | | | Crane has stopped working |
|
|
148
|
Wednesday, July 18, 2012, 16:49 |
Grant Minor | South Hot-Cell | Development | | | South Hot Cell Ventilation Alarm Trip | Today (Wednesday July 18th) at around 4:15
pm I was taking a small tour group from
VECC into the Target Hall. In the process |
|