Entry  Wednesday, June 06, 2012, 08:21, David Wang, ITW, Standard Operation, TM1, , TM1 disconnected in ITW 
I disconnected TM1 in ITW yesterday morning.The general radioactive level in ITW over the TM top (300mm) is about 350 usv/hr. contacting level on TP1
and TP2 are 1.0-1.2 msv/hr. I took 0.22 msv dose .The module is moved to
south hot cell later and a shielding plug is put back to ITW. Everything is fine.
Entry  Monday, June 25, 2012, 14:39, David Wang, ITW, Standard Operation, , , I moved 5 shielding blocks from ITE to ITW, 
and set up ventilation for ITW. ITW is ready for taking proton beam now. All water interlock checks for ITW are done. The ITW water signals strength
and frequency had been checked from electrical room, and everything is good.
Entry  Tuesday, June 26, 2012, 14:10, David Wang, South Hot-Cell, Repair, TM3, , TM3 heat shield and window circuits leak check is done. 
Chad and i did a leak check on TM3 heat shield and window circuits.Both circuits are pumped easily down to the bottom leak rate and base pressure on
the leak detector. There are two VCR caps on heat shield circuit. Chad sprayed helium on both of them   ( tested individually,2 seconds every time
) . There is no response on leakdetecor during 45 seconds waiting time. On window circuit there are 2 VCR joints. Chad sprayed helim on these joints(2seconds
Entry  Tuesday, July 03, 2012, 10:50, David Wang, ITE, Standard Operation, TM4, , Disconnected TM4 in ITE. 
I disconnected TM4 in ITE this morning. The window circuit and heat shield circuit had been purged. The general field inside ITE is about 200usv/h.
Entry  Friday, July 13, 2012, 16:33, Bevan Moss, Crane, Repair, , , Crane has stopped working 
In the AM today David and I used the crane to raise the ground plate sheet metal into place. This afternoon when I attempted to return the crane to its
usual place I discovered that the crane no longer worked. Upon further inspection it appears that the PLC has lost power. I will follow up on this Monday
morning. The crane is not supporting any load at this point.
    Reply  Monday, July 16, 2012, 11:55, Bevan Moss, Crane, Repair, , , Crane has stopped working 


    
        
            Bevan Moss wrote:
        
        
            
            In the AM today David and I used the crane to raise the ground plate sheet metal into place. This afternoon when I
Entry  Wednesday, July 18, 2012, 16:49, Grant Minor, South Hot-Cell, Development, , , South Hot Cell Ventilation Alarm Trip 
Today (Wednesday July 18th) at around 4:15 pm I was taking a small tour  group from VECC into the Target Hall.  In the process of discussing the  mechanical
design of the Target Modules and South Hot Cell turntable I  inadvertently lifted the Aluminum Hatch Cover of the Hot Cell about 2  inches in an effort
to explain something.  This tripped the ventilation  alarm before I realized what I was doing.  I evacuated the visitors from  the Target Hall, checked
Entry  Wednesday, July 18, 2012, 16:49, Grant Minor, South Hot-Cell, Development, , , South Hot Cell Ventilation Alarm Trip 
Today (Wednesday July 18th) at around 4:15 pm I was taking a small tour  group from VECC into the Target Hall.  In the process of discussing the  mechanical
design of the Target Modules and South Hot Cell turntable I  inadvertently lifted the Aluminum Hatch Cover of the Hot Cell about 2  inches in an effort
to explain something.  This tripped the ventilation  alarm before I realized what I was doing.  I evacuated the visitors from  the Target Hall, checked
Entry  Thursday, July 26, 2012, 08:33, David Wang, ITE, Standard Operation, TM4, , I moved 5 shielding blocks from ITW to ITE thisTuesday morning . 
  All water interlock checks for ITE had been done. The ITE water signals  strength and frequency(Espcially on MSP circuit) had been checked from
electrical room, and  everything is good.
Entry  Tuesday, August 07, 2012, 14:06, David Wang, ITW, Repair, , , ITW TP4S has been replaced 

 
  Normal
  0
  
   
   

  
   
   
  
  MicrosoftInternetExplorer4




st1\:*{behavior:url(#ieooui)
Entry  Monday, August 20, 2012, 12:28, David Wang, ITW, Standard Operation, TM1, , I moved 5 shielding blocks from ITE to ITW, 
I moved 5 shielding blocks from ITE  to ITW.ITW is configured to take proton beam now.
Entry  Thursday, August 23, 2012, 07:34, David Wang, ITW, Repair, , , Replaced broken air lines on ITW HARP5B cylinder. 
Prob guys replaced broken air lines on ITW HARP 5B Cylinder.Several shielding blocks had been moved out to make the cylinder accessible. After the replacement,the
HARP5B works fine.All shield blocks had been moved back to original position. The job is done.
Entry  Thursday, August 30, 2012, 13:57, David Wang, ITE, Standard Operation, TM4, , Disconnected TM4 in ITE. 
I disconnected TM 4 in ITE on AUG 29th morning.The vacuum lines stay untouched and they will be disconnected on SEP 04th.
Entry  Friday, August 31, 2012, 12:10, chad fisher, South Hot-Cell, Maintenance, , , Hot Cell Maitenance 
Entered south hot cell Wednesday and replaced the pre-filter air filter as well as the front two light bulbs. Also removed two bags of compressible garbage,
one bag of metal, and of course the bagged air filter (as Joe M. expressed as interest in havung it).
Inital checks found approximately 4000 cpm on the cell side of the temporary Al. panel used during the cell entry, 2000 cpm on the tacky mats layed
Entry  Thursday, September 27, 2012, 09:13, David Wang, ITE, Repair, TM4, , ITE MSP water circuit flow wheel had been replaced  
ITE MSP water circuit flow wheel was replaced yesterday due to poor performance. 
Entry  Thursday, October 04, 2012, 11:06, David Wang, Conditioning Station, Repair, , , Replace conditioning station scroll pump in target hall 
Grant and I replaced the conditioning station broken  srcoll pump with a refurbished scroll pump which is supplied by vacuum group. The replaced
pump is bagged and waiting for RPG further survey in target hall . The target hall is survey after the job, and everything is fine.
Entry  Wednesday, October 31, 2012, 11:24, David Wang, ITE, Standard Operation, TM4, , Transfer five shielding blocks from ITW to ITE. 
Bevan and I transferred five shielding blocks from ITW to ITE. ITE is ready for taking proton beam.
Entry  Friday, November 02, 2012, 08:45, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 
The F-308 have been cleaned and serviced. There were three F-308's that came back with some contamination.#13, #15 and #19 were found to have contamination.
They were decontaminated. All of the loose contamination was removed. There is still some fixed contamination. The levels of contamination are low enough
to still be used for shipping spent targets. They have been moved to the north hot cell area and are ready for to be filled with spent targets. 
Entry  Friday, November 02, 2012, 13:18, Travis Cave, Spent Target Vault, Standard Operation, , , spent target assay Vault_Storage_November_2_2012.pdf
This week six targets and the two source trays were assayed and surveyed from the storage vault. see attached PDF for details.
Entry  Tuesday, November 06, 2012, 11:34, chad fisher, South Hot-Cell, Standard Operation, TM1, , Nb#7 Removal IMG_0797[1].JPGIMG_0798[1].JPGIMG_0799[1].JPG
Attached are pre-removal pictures of NB#7 and the inside face of the containment box cover before cleaning.