Entry  Wednesday, February 01, 2012, 09:54, David Wang, ITW, Maintenance, TM1, , ITW and TM1 winter shut down vacuum leak check 
Entry  Monday, April 02, 2012, 08:17, David Wang, Conditioning Station, Development, , , conditioning station IMC pump down. 
Entry  Tuesday, April 03, 2012, 12:11, David Wang, Conditioning Station, Development, , , leak check on conditioning station vacuum system 
Entry  Thursday, April 05, 2012, 10:30, David Wang, ITE, Standard Operation, TM4, , I moved 5 shielding blocks back to ITE this morning. 
Entry  Thursday, April 12, 2012, 14:40, David Wang, Conditioning Station, Development, TM1, , conditioning staion and TM1 is under TP1 and TP2 pumping now. 
Entry  Friday, April 13, 2012, 12:31, David Wang, Conditioning Station, Development, TM1, , TM1 and conditioning station leak check. 
Entry  Thursday, April 26, 2012, 09:23, David Wang, ITE, Repair, TM4, , changed flow wheel on ITE TM4 contaiment box water circuit 
Entry  Thursday, April 26, 2012, 13:01, David Wang, ITE, Repair, TM4, , Replaced TM4 EE water flow wheel in ITE. 
Entry  Wednesday, May 02, 2012, 11:27, David Wang, ITW, Standard Operation, TM1, , ITW is ready for taking proton beam. 
Entry  Tuesday, May 08, 2012, 10:28, David Wang, ITE, Standard Operation, TM4, , Disconnected TM4 in ITE. 
Entry  Friday, May 25, 2012, 10:48, Travis Cave, Spent Target Vault, Standard Operation, , , Moving the spent targets to mini storage. Mini_Vault_Storage_May_25_2012.pdfVault_Storage_May_25_2012.pdf
Entry  Monday, May 28, 2012, 13:05, David Wang, ITE, Standard Operation, , , I moved 5 shielding blocks from ITW to ITE . 
Entry  Wednesday, June 06, 2012, 08:21, David Wang, ITW, Standard Operation, TM1, , TM1 disconnected in ITW 
Entry  Monday, June 25, 2012, 14:39, David Wang, ITW, Standard Operation, , , I moved 5 shielding blocks from ITE to ITW, 
Entry  Tuesday, June 26, 2012, 14:10, David Wang, South Hot-Cell, Repair, TM3, , TM3 heat shield and window circuits leak check is done. 
Entry  Tuesday, July 03, 2012, 10:50, David Wang, ITE, Standard Operation, TM4, , Disconnected TM4 in ITE. 
Entry  Friday, July 13, 2012, 16:33, Bevan Moss, Crane, Repair, , , Crane has stopped working 
   +  Reply  Monday, July 16, 2012, 11:55, Bevan Moss, Crane, Repair, , , Crane has stopped working 
Entry  Wednesday, July 18, 2012, 16:49, Grant Minor, South Hot-Cell, Development, , , South Hot Cell Ventilation Alarm Trip 
Entry  Wednesday, July 18, 2012, 16:49, Grant Minor, South Hot-Cell, Development, , , South Hot Cell Ventilation Alarm Trip 