  1448   Friday, March 10, 2017, 09:19 chad fisherSouth Hot-CellStandard Operation  South Hot Cell Field MeasurementsThe fields in the hot cell have been measured
by means of a pole monitor through the tool
port. Field was measured to be 25 uSv/h.
  
  1820   Thursday, November 08, 2018, 09:27 chad fisherSouth Hot-CellMaintenance  South East Manipulator cable replacementThe handle cable on the east manipulator
of the south hot cell has been replaced.
Old cable showed signs of wear but had no
  
  1617   Tuesday, September 19, 2017, 10:40 chad fisherSouth Hot-CellMaintenance  South East Manipulator MaintenenceEntered hot cell to preform replacement
of slave tong cable. Existing cable shows
no signs of wear so it has been re-installed.
  
  1321   Tuesday, August 16, 2016, 11:27 chad fisherSouth Hot-CellMaintenance  South Cell Field ReadingsField readings have been taken at the south
hot cell in preparation for entry into the
cell to fix manipulator.
  
  1880   Friday, March 01, 2019, 10:23 Travis CaveSpent Target VaultStandard Operation  Source tray moved The old TM#2 source tray and TM#4
optics tray have been removed from the vault
and placed into the spent target storage
  
  1648   Thursday, October 19, 2017, 14:20 Anders MjosAssembly/Bench TestStandard Operation  Source tray inspection Two minor chips in the main 60 kV
insulators on the source tray was inspected
today by Anders, Tom and Aurelia. The chips
 Left_Insulator.jpgRight_Insulator.jpg 
  1646   Wednesday, October 18, 2017, 14:54 Anders MjosAssembly/Bench TestStandard Operation  Source tray assembly electrical checkSource tray meggered today by Anders and
Keith
GND - MSP OL @ 1000V
 Steerer_Connections_2017-10-18.pdf 
  378   Thursday, June 13, 2013, 09:18 chad fisherSouth Hot-CellRepairTM3 Source Tray/Extraction Column RemovalTM3 Rev 2 source tray/extraction column
insertion into its storage was completed
yesterday and it was then removed from the
  
  1666   Wednesday, December 13, 2017, 15:32 Anders MjosAssembly/Bench TestMaintenanceTM2 Source Tray inspectionThe Source tray was inspected in the RH
shop today by Anders, Friedhelm and Jens.
The routing of the lines are satisfactory,
  
  325   Monday, April 29, 2013, 15:58 Bevan MossSouth Hot-CellRepairTM3 Source Tray RemovalChad removed the source tray from TM3  today,
see attached picture (video was also taken).
There was some interference between the window
 20130429_TM3_SOURCE_TRAY_REMOVAL_IMG_0620.JPG 
  1292   Tuesday, July 26, 2016, 11:22 chad fisherSouth Hot-CellMaintenance  Soth Hot Cell Waste Storage Vault TunnelThe two 45 gal (m) drums of waste removed
from the south hot cell in December 2015
and January 2016 were transferred from the
  
  1739   Friday, June 22, 2018, 13:59 chad fisherSouth Hot-CellRepair  Soth Hot Cell FieldsField measurements have been taken to determine
the level before entry for repair of manipulators.
Field on contact at manipulator is
  
  1578   Thursday, July 06, 2017, 14:23 Isaac EarleNorth Hot-CellRepair  Slave side Z motion tape snapped on NHC right side manipulatorThe NHC right side manipulator was evaluated
today to check if operation was normal through
all ranges of motion.  The manipulator
  
  2094   Wednesday, May 20, 2020, 13:30 David WangSafe Module ParkingMaintenance  Silo area radio active waste clean up. Sorted and packed one 55 gallon drum with
low contamination and active stuffs which
are placed around silo area in the past.
  
  705   Wednesday, July 16, 2014, 13:59 chad fisherSouth Hot-CellStandard OperationTM3SiC#30Sic#30 installJust some notes on the install of SiC#30
on TM3 last month...It was installed with
all new fasteners and torque values provided
  
  2467   Tuesday, July 25, 2023, 16:25 Carla BabcockNorth Hot-CellStandard Operation SiC#45SiC#45 post irradiation inspectionLooked at SiC#45 in the hot cell. Looked
very clean, no deposits on the heat shield
or other components. Target also looked very
  
  2036   Tuesday, December 03, 2019, 12:45 Adam NewsomeSpent Target VaultStandard Operation SiC#38SiC#38 in Pail 205 moved to Storage Vault: 4BSiC#38 in Pail 205 was moved to section 4B
of the storage vault. Dose rate when retrieving
from Hot Cell was 22.2 mSv/h. 
 Target_Index_2019-12-03.pdf 
  1649   Thursday, October 19, 2017, 14:20 Anders MjosConditioning StationStandard OperationTM4SiC#37SiC#37 ConditioningThursday, October 19, 2017, 14:20: EE configured
for conditioning. HV cage locked up
Thursday, October 19, 2017, 16:46:
 SiC#37_BIAS_current_vs_voltage.xlsxSiC#37.docx 
  1380   Monday, October 24, 2016, 14:44 chad fisherSouth Hot-CellStandard OperationTM2SiC#35SiC#35 installedSic#35 has been installed onto TM2. High
current fasteners torqued to 130 in lbs.
Mating of the 9 pin connector was
 20161024_141155.jpg 
  1328   Tuesday, August 23, 2016, 13:31 chad fisherSouth Hot-CellStandard OperationTM2SiC#33SiC#33 RemovedSiC#33 has been removed from TM2.   