  49   Thursday, November 10, 2011, 14:33 Travis CaveSpent Target VaultStandard Operation  Spent Target AssayFor the week of November 7th 2011, four
of a possible ten targets that are in storage
were assayed. Targets are as follows:
  
  64   Thursday, December 15, 2011, 13:08 Travis CaveSpent Target VaultStandard Operation  Spent Target AssaySpent target assay completed. A total of
16 target were looked at, 13 were low enough
to be assayed and those 13 are at shippable
 Vault_Storage_December_14_2011.pdf 
  382   Thursday, June 20, 2013, 13:47 Travis CaveSpent Target VaultStandard Operation  Spent Target AssayTen targets have been assayed or had field
measurements(they were too hot to ship but
were assayed the last time an assay was done)
 Vault_Storage_June_20_2013.pdf 
  1690   Monday, March 05, 2018, 13:47 Travis CaveSpent Target VaultRepair ManySpent Target Assay The spent target assay was aborted
today after the first target was finished
due to the very old computer that controls
  
  1695   Friday, March 23, 2018, 09:34 Travis CaveSpent Target VaultStandard Operation ManySpent Target Assay All targets in the ISAC Spent Target
Vault have been either assayed and had field
measurement done on them or just measurement
 Target_Index_2018-03-23.pdf 
  364   Monday, May 27, 2013, 11:55 chad fisherSouth Hot-CellStandard Operation  Special Tooling for RFQ targetThe special tool made for the RFQ target
autopsy has been inserted into the hot cell.
 
  
  2422   Monday, March 06, 2023, 11:31 Adam NewsomeNorth Hot-CellRepair  Spare Telemanipulator: Y-Motion Linear Actuator RepairThe linear actuator used for the Y-motion
motor assistance on the spare telemanipulator
was replaced and tested. It was observed
  
  2423   Tuesday, March 07, 2023, 10:37 chad fisherNorth Hot-CellRepair  Spare Telemanipulator: Y-Motion Linear Actuator Repair


   
        
            
  
  2679   Wednesday, September 11, 2024, 13:38 Adam NewsomeNorth Hot-CellRepair  Spare Manipulator - Y-axis motion not functioningUpdate 2024-09-12:
C. Fisher confirms this is actually normal
behaviour. The Y-axis motion is inhibited
  
  148   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm TripToday (Wednesday July 18th) at around 4:15
pm I was taking a small tour  group from
VECC into the Target Hall.  In the process
  
  149   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm TripToday (Wednesday July 18th) at around 4:15
pm I was taking a small tour  group from
VECC into the Target Hall.  In the process
  
  1746   Friday, June 29, 2018, 10:27 chad fisherSouth Hot-CellMaintenance  South Hot Cell Filter ChangeAt the end of manipulator repair Thursday
the ventilation pre-filter in the hot cell
was changed. Old filter remains in the hot
  
  1451   Wednesday, March 15, 2017, 07:45 chad fisherSouth Hot-CellMaintenance  South Hot Cell FieldsI have moved the suspected "hot"
items in the hot cell and placed them under
some lead bricks. I have re-measured the
  
  1742   Tuesday, June 26, 2018, 08:56 chad fisherSouth Hot-CellStandard Operation  South Hot Cell Fieldshot items have been moved and shielded
as much as possible. Field at left manipulator
has been reduced from 560 uSv/h to 85 uSv/h.
  
  1448   Friday, March 10, 2017, 09:19 chad fisherSouth Hot-CellStandard Operation  South Hot Cell Field MeasurementsThe fields in the hot cell have been measured
by means of a pole monitor through the tool
port. Field was measured to be 25 uSv/h.
  
  1820   Thursday, November 08, 2018, 09:27 chad fisherSouth Hot-CellMaintenance  South East Manipulator cable replacementThe handle cable on the east manipulator
of the south hot cell has been replaced.
Old cable showed signs of wear but had no
  
  1617   Tuesday, September 19, 2017, 10:40 chad fisherSouth Hot-CellMaintenance  South East Manipulator MaintenenceEntered hot cell to preform replacement
of slave tong cable. Existing cable shows
no signs of wear so it has been re-installed.
  
  1321   Tuesday, August 16, 2016, 11:27 chad fisherSouth Hot-CellMaintenance  South Cell Field ReadingsField readings have been taken at the south
hot cell in preparation for entry into the
cell to fix manipulator.
  
  1880   Friday, March 01, 2019, 10:23 Travis CaveSpent Target VaultStandard Operation  Source tray moved The old TM#2 source tray and TM#4
optics tray have been removed from the vault
and placed into the spent target storage
  
  1648   Thursday, October 19, 2017, 14:20 Anders MjosAssembly/Bench TestStandard Operation  Source tray inspection Two minor chips in the main 60 kV
insulators on the source tray was inspected
today by Anders, Tom and Aurelia. The chips
 Left_Insulator.jpgRight_Insulator.jpg 