Entry  Wednesday, January 10, 2024, 11:24, Travis Cave, Spent Target Vault, Standard Operation, , Ta#66, Spent Target Move Target_Index_2023-01-10.pdf
 The spent Ta#66 was moved from the south hot cell to the spent target vault, it was placed in pail#285 and placed in spot 5B of the vault. The
target was 46.2mSv/hr when removed from the south hot cell. See the attached PDF for vault details.
Entry  Wednesday, February 14, 2024, 11:32, Adam Newsome, Spent Target Vault, Standard Operation, , UCx#43, Spent Target Move Target_Index_2024-02-14.xlsm
Spent target UCx#43 (pail 289) was moved from the South Hot Cell to the Storage Vault, placed in location 2A. Dose rate at 1m was approximately 22.6
mSv/hr.
Target index spreadsheet updated, attached.
Entry  Thursday, July 18, 2024, 11:22, Travis Cave, Spent Target Vault, Standard Operation, , UC#45, Spent Target Move Target_Index_2024-07-18.pdf
 The UC#45 target was moved from the south hot cell to the spent target vault. It was place in Pail#292 spot 1A of the vault, was 19.5mSv/hr. Also
this pail contains the target material of UC#44. See attached PDF for more details.
Entry  Friday, August 16, 2024, 08:47, Travis Cave, Spent Target Vault, Standard Operation, , SiC#46, Spent Target Move Target_Index_2024-08-16.pdf
 SiC#46 (pail 293) was placed in the vault (spot 3B) on Wednesday the 14th of August. It was 111 mSv/hr when removed from the south hot
cell. See attached PDF for details.
Entry  Wednesday, August 21, 2024, 10:53, Travis Cave, Spent Target Vault, Standard Operation, , TiC#7, Spent Target Move Target_Index_2024-08-21.pdf
 TIC#7 was placed in pail #294 and then moved from the south hot cell to the spent target vault spot 4B. It was 82.3mSv/hr when removed from the
SHC. See attached PDF for details.
Entry  Monday, August 26, 2024, 09:57, Travis Cave, Spent Target Vault, Standard Operation, , Nb#10, Spent Target Move Target_Index_2024-08-26.pdf
 Nb#10 was placed in pail#295 and moved from the south hot cell to the spent target vault, spot 4A, it was 230uSv/hr when removed from the SHC.
See attached PDF for vault details.
Entry  Tuesday, October 15, 2024, 13:44, Travis Cave, Spent Target Vault, Standard Operation, , TiC#8 and Ta#67, Spent Target Move Target_Index_2024-10-15.pdf
 On Friday October 11th TiC#8 and Ta#67 were place in the spent target vault in Tray 8. See attached PDF for details. 
Entry  Friday, November 08, 2024, 10:39, Travis Cave, Spent Target Vault, Standard Operation, , TiC#9, Spent Target Move Target_Index_2024-11-08.pdf
 TiC#9 was placed in Pail 299 in spot 8A of the vault and was 92.1mSv/hr when removed from the south hot cell. See attached pdf for full vault details.
Entry  Monday, January 13, 2025, 10:02, Travis Cave, Spent Target Vault, Standard Operation, , UC#46, Spent Target Move Target_Index_2025-01-13.pdf
UC#46 was placed in pail# 301 in spot 1B and was 26.3mSv/hr when removed from the SHC. See attached PDF for vault 
details.
Entry  Thursday, January 16, 2025, 10:03, Travis Cave, Spent Target Vault, Standard Operation, , UC#47, Spent Target Move Target_Index_2025-01-16.pdf
 The spent UC#47 was moved from the south hot cell to the spent target vault placed in pail #302 in spot 1C of the vault, it was 24.5mSv/hr when
removed from the south hot cell. See attached for vault details.
Entry  Thursday, June 19, 2025, 11:22, Travis Cave, Spent Target Vault, Standard Operation, , UC#48, Spent Target Move Target_Index_2025-06-19.pdf
 The spent UC#48 target was removed from the North Hot Cell, place in pail#303 and put into vault spot 2C, it was 35.4mSV/hr when removed from the
NHC. See attached PDF for vault details.
Entry  Thursday, August 06, 2015, 10:26, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Target Measurments and Assays Vault_Storage_August_6_2015.pdf
All targets but one ( SiC#31 went in last week) have been measured or assayed. See attached PDF for the details.
Entry  Thursday, November 10, 2011, 14:33, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Target Assay 
For the week of November 7th 2011, four of a possible ten targets that are in storage were assayed. Targets are as follows:
Target             General average field @ 1 metre from edge of pail
SiC#24           1.99 mSv/hr
Entry  Thursday, December 15, 2011, 13:08, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Target Assay Vault_Storage_December_14_2011.pdf
Spent target assay completed. A total of 16 target were looked at, 13 were low enough to be assayed and those 13 are at shippable levels, the other 3
of the 16 looked at were too hot to ship and assay. See attached pdf for complete details.
Entry  Thursday, June 20, 2013, 13:47, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Target Assay Vault_Storage_June_20_2013.pdf
Ten targets have been assayed or had field measurements(they were too hot to ship but were assayed the last time an assay was done) done on them 
over the past two days. Of those that have been assayed we have total of ten shippable targets. See the attached PDF for the latest details of the storage
vault.
Entry  Monday, March 05, 2018, 13:47, Travis Cave, Spent Target Vault, Repair, , Many, Spent Target Assay 
 The spent target assay was aborted today after the first target was finished due to the very old computer that controls the camera and the vault
door effectively died. The vault door had to be closed using the emergency door closing winch which worked so it passed that test.
Entry  Friday, March 23, 2018, 09:34, Travis Cave, Spent Target Vault, Standard Operation, , Many, Spent Target Assay Target_Index_2018-03-23.pdf
 All targets in the ISAC Spent Target Vault have been either assayed and had field measurement done on them or just measurement if to hot to assay.
Entry  Monday, May 27, 2013, 11:55, chad fisher, South Hot-Cell, Standard Operation, , , Special Tooling for RFQ target 
The special tool made for the RFQ target autopsy has been inserted into the hot cell.
 
4-40 button head screws have been successfully lossened.
Entry  Monday, March 06, 2023, 11:31, Adam Newsome, North Hot-Cell, Repair, , , Spare Telemanipulator: Y-Motion Linear Actuator Repair 
The linear actuator used for the Y-motion motor assistance on the spare telemanipulator was replaced and tested. It was observed around September 2021
that the former one which was installed was causing fuses to blow for the main 120 VAC power supply in the control box. After some troubleshooting, it
was determined that the linear actuator itself did not operate smoothly - it was suspected that this caused motor overload due to additional friction.
    Reply  Tuesday, March 07, 2023, 10:37, chad fisher, North Hot-Cell, Repair, , , Spare Telemanipulator: Y-Motion Linear Actuator Repair 


    
        
            Adam Newsome wrote:
        
        
            
            The linear actuator used for the Y-motion motor assistance on the spare telemanipulator was replaced