Entry  Monday, October 04, 2021, 09:27, Frank Song, ITW, Standard Operation, TM2, C#3, Module Connection IMG_3711.jpgIMG_3712.jpgIMG_3713.jpgIMG_3714.jpg
Entry  Monday, October 04, 2021, 09:33, Frank Song, North Hot-Cell, Standard Operation, TM2, C#3, TM2 with target connection test IMG_3710.jpg
Entry  Tuesday, November 09, 2021, 09:58, Frank Song, ITW, Standard Operation, TM2, C#3, module disconnection IMG_4315.jpg
Entry  Wednesday, November 10, 2021, 11:06, Travis Cave, Spent Target Vault, Standard Operation, , C#3, Spent Target Move Target_Index_2021-11-10.pdf
Entry  Monday, October 19, 2020, 12:52, David Wang, South Hot-Cell, Standard Operation, TM2, C#2, TM2 electrical and leak check at SHC Tm3_bunker_set_up_018.JPG
Entry  Tuesday, October 20, 2020, 10:14, Travis Cave, ITW, Standard Operation, TM2, C#2, Module move 
Entry  Thursday, November 19, 2020, 12:00, Adam Newsome, Spent Target Vault, Standard Operation, , C#2, Spent Target Move 
Entry  Wednesday, June 17, 2020, 09:49, chad fisher, South Hot-Cell, Standard Operation, TM4, C#1, C#1 installed C#1_Target.jpg
Entry  Wednesday, June 17, 2020, 09:53, David Wang, South Hot-Cell, Standard Operation, TM2, C#1, C#1 target electrical check and leak check at SHC. C#1_target_electrical_and_leak_check.pdf
Entry  Thursday, June 18, 2020, 13:22, David Wang, ITW, Standard Operation, TM2, C#1, Remove of TM2 from ITE to SHC. 
Entry  Friday, July 03, 2020, 06:57, David Wang, ITW, Standard Operation, TM2, C#1, TM2 CONNECTION CHECKLIST  TM2_C#1_CONNECTION_CHECKLIST.pdf
Entry  Monday, July 06, 2020, 12:20, David Wang, ITW, Standard Operation, TM2, C#1, Five shielding blocks to ITW 
Entry  Thursday, March 25, 2021, 10:38, David Wang, Spent Target Vault, Standard Operation, , C#1, Remove pail 237 spent target C#1 from storage vault to mini storage.  
Entry  Friday, July 03, 2020, 07:03, David Wang, South Hot-Cell, Standard Operation, TM4, BEFORE TARGET INSTALLATION, ELECTRICAL CHECK BEFORE TARGET INSTALLATION. TM4_ELECTRICAL_CHECK_20220_07_02.pdf
Entry  Wednesday, April 30, 2014, 12:03, Travis Cave, Spent Target Vault, Standard Operation, , 2A3 window, Window now in vault Vault_Storage_April_30_2014.pdf
    Reply  Friday, March 24, 2017, 11:19, Keith C Ng, Spent Target Vault, Standard Operation, , 2A3 window, Window now in vault 2017mar24_vault_tunnel_storage_form(1).pdf
Entry  Friday, March 24, 2017, 13:21, Travis Cave, Spent Target Vault, Standard Operation, , 2A window, 2A window has been removed from the vault. Vault_Storage_March_24_2017.pdf
Entry  Tuesday, April 24, 2012, 10:38, David Wang, Conditioning Station, Standard Operation, TM1, LP SIS Nb6, TM1 heat shield circuit leak check with Nb5 
Entry  Friday, April 12, 2013, 10:27, David Wang, ITW, Standard Operation, TM1, , I reconnected TM1 to ITW. 
Entry  Thursday, June 30, 2011, 16:04, Pierre Bricault, Conditioning Station, Repair, TM1, , TM1 status 