  284   Wednesday, April 03, 2013, 12:26 David WangITEMaintenanceTM4Sic LIS/RFQLeak check on ITE TM4.TM 4 had been leak check in ITE due to
  relatively high PNG1 and IG1 readings.All
TM4 primary and secondary  vessel air
  
  294   Thursday, April 11, 2013, 07:18 David WangConditioning StationMaintenanceTM1Ta#29helium pressure tested all water lines in TM1 at CSOn April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found.
  
  295   Friday, April 12, 2013, 10:27 David WangITWStandard OperationTM1 I reconnected TM1 to ITW.TM1 has been reconnected in ITW. Water
interlock check for TM1 is done.
  
  296   Friday, April 12, 2013, 10:32 David WangITWRepairTM1 ITW EXIT1 tank to module o-ring leak check.I leak checked new installed ITW EXIT1
tank to module o-ring.No leak had been found
. Also ,TM1 primary vessel air to vacuum
  
  302   Wednesday, April 17, 2013, 10:35 David WangITEStandard OperationTM4 I moved 5 shielding blocks back to ITE.5 shielding block had been moved 
back to ITE. The ITE is configured to take
proton beam.
  
  310   Monday, April 22, 2013, 09:33 David WangConditioning StationRepairTM3 Leak check TM3 at conditioning stationTM3 leak check at conditioning station
without target: TM3 all air to vacuum seals
have been leak checked . They are all good.
  
  331   Tuesday, May 07, 2013, 12:07 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITE to ITW.Water interlock check  on ITW is done.
All water signals are strong on EL panel. 
ITW is configured to take proton beam.
  
  343   Wednesday, May 15, 2013, 10:00 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.HS had been purged. The ITE is under venting.
The TM4 will be moved to SH on next Tuesday
which is May 21th.
  
  358   Thursday, May 23, 2013, 11:14 David WangSouth Hot-CellStandard OperationTM4TA#40 TM4 TA# 40 HS leak check at SHCTM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be  a helium pressure test on it at
  
  371   Wednesday, May 29, 2013, 06:32 David WangITEStandard OperationTM4Ta#40TM4 has been connected in ITE.TM4 has been connected in ITE. The pumping
down is fine so far.TM4 water interlock check
was done yesterday.
  
  374   Tuesday, June 04, 2013, 12:36 David WangITEStandard OperationTM4 5 shielding blocks are transferred from ITW to ITEDan an I  transferred 5 shielding
blocks from ITW to ITE. The ITE is configured
to take proton beam.
  
  376   Tuesday, June 11, 2013, 10:05 David WangITWStandard OperationTM1 Disconnected TM1 in ITW.Dan and I  disconnected TM1 in ITW.   
  387   Wednesday, June 26, 2013, 11:03 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 UCx target heat shieldChad and I leak checked the TM1 UCx target
heat shield at SHC. No leak has been found
so far.
  
  396   Thursday, July 04, 2013, 11:37 David WangITWStandard OperationTM1UCxI reconnected TM1 to ITW. I  reconnected TM1 to ITW on
02 July.The pumping down is good so far.
TM1 water interlock check is good also.
  
  399   Tuesday, July 09, 2013, 14:26 David WangITWStandard OperationTM1UCx5 shielding blocks had been transferred from ITE to ITW5 shielding blocks had been  transferred
from ITE to ITW.  The  ITW is configured
to take proton beam.
  
  400   Tuesday, July 16, 2013, 13:09 David WangITEStandard OperationTM4 TM4 has been disconnected in ITE.TM4 has been disconnected in ITE. All water
lines on TM4 have been purged. ITE is venting
now.
  
  401   Wednesday, July 17, 2013, 08:29 David WangConditioning StationDevelopmentTM3 TM3 leak check in CS without source tray.Leak checked TM3 without source tray in
CS this morning. The CS and TM3 vacuum: IG1(top
of the TM3 service cap)4.9x E-7Torr, IG2(diagnostic
  
  402   Wednesday, July 17, 2013, 10:10 David WangConditioning StationDevelopmentTM3 CS cooling and vacuum system have been turned off CS water cooling and vacuum system have
been turned off at 10:00 AM this morning.The
TM3 will be disconnected and moved to silo
  
  409   Wednesday, July 24, 2013, 17:46 David WangConditioning StationStandard OperationTM4Sic 29#Started 3 turbo pumps on CS for TM43 turbo pumps on TM4 and CS have been started.
The pumping down is good so far, The TM4
PNG1 reading is more than 10 times higher
  
  411   Thursday, July 25, 2013, 10:08 David WangConditioning StationStandard OperationTM4SiC #29TM4 HS helium pressure test andTM4 connection at CSBevan and I did a helium pressure test
on TM4 HS water circuit at CS. The leak detector
is pumped to the bottom scale(E-9 atm.cc/sec
  