Entry  Wednesday, October 12, 2016, 10:00, David Wang, ITW, Standard Operation, TM2, , TM2 was disconnected at ITW 
TM2 was disconnected at ITW. 3 water circuits in ITW gave been looped to keep 75 GPM water flow to ITW. HS line was purged at HS. RPG got the water sample.
Entry  Tuesday, October 25, 2016, 15:10, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected at ITW 
All turbo pumps are started. Two gas valves for Febiad run are opened. Pumping down is good so far.
Entry  Tuesday, November 29, 2016, 12:57, David Wang, ITW, Standard Operation, TM2, , TM2 is connected in ITW 
All turbo pumps are started. Water system and water signals have been checked. Pumping down on ITW and TM2 is good so far.
Entry  Tuesday, November 29, 2016, 14:50, Travis Cave, ITW, Standard Operation, TM2, UC#18, module moved 
TM#2 with UC#18 has been moved to ITW from the conditioning station.
Entry  Saturday, December 03, 2016, 10:01, David Wang, ITW, Repair, TM2, , venting ITW and TM2 with argon. 
A short between TM2 EE and bias is produced yesterday during tube heater ramp up.  Alex asked for an argon venting on ITW to see if the problem
could be solved by venting and pumping down yesterday.  I set up argon venting system in electrical room and started the venting at 8:30 AM this morning. 
It will take 5 hours to vent the ITW to 760 torr(mechanical gauge reading).  The venting system pressure is set as 2 torr. A pressure relieve valve
Entry  Monday, December 05, 2016, 10:10, David Wang, ITW, Standard Operation, TM2, , Five shielding blocks have been transferred from ITE to ITW.  
The ITW is configured to take proton beam.
Entry  Thursday, January 12, 2017, 14:24, David Wang, ITW, Standard Operation, TM2, , ITW primary and secondary vacuum vessel winter shut down leak check. 
TM2 is located in ITW for this leak check. Leak detector is installed between ITW BV2s as before. LD base leak rate 0.0XE-9atm.cc/sec, base pressure
0.0XE-4 Torr. First , I leak checked dump module top flange seal which a small leak was found in last year winter shut down. This time,all ITW  turbo-pumps
cooling fans are switched off during the check. Lots helium are sprayed around the dump module top flange this time. I did not see any response on LD. 
Entry  Monday, January 16, 2017, 09:32, David Wang, ITW, Standard Operation, TM2, , Helium pressure test on TM2 water llines at ITW 
TM2 helium pressure test result at ITW. 70 psi helium 3 minutes on each circuit. LD base LR0.0XE-9atm.cc/sec  BP 0.0XE-4torr.  ITW IG1 1.22Xe-7
torr, ITW IG1S 1.31XE-7torr, ITW PNG4 2.66XE-6Torr(ITW TP4 off).
 
Entry  Tuesday, January 24, 2017, 15:32, David Wang, ITW, Standard Operation, TM2, , TM2 was moved from ITW to SHC this morning. 
The move is smooth. Yasmine and Travis did the move.
Entry  Tuesday, February 07, 2017, 10:34, David Wang, ITW, Maintenance, , , ITW clean up 
ITW has been cleaned up today.  All station are vacuum cleaned. I wiped all HV cover and HV area including conductors and insulators. The black
foams which are used to wrap around TP back up line are degrading now. I removed most of these foams. Also, Some obsolete  water lines  are moved
our of station. All waste are bagged . they will be surveyed and  stored(or disposed) according to radio-active level.
Entry  Tuesday, March 07, 2017, 09:25, David Wang, ITW, Repair, , , ITW HALCW 2" return line ball valve seals replacement. 
Leaking seals on ITW HALCW 2" return line ball valve have been replaced. 8 liter waters are drained out for this job. Water are drained into a thick
plastic bag.  The bag is tie strapped , labeled, and put into a yellow garbage bin in MAA. Water sample is given to RPG. After analyzing, RPG will
give instruction on how to deal with it. Since we just refilled NALCW to system before this job, the active level on sample is very low. We may dump them
Entry  Wednesday, April 26, 2017, 10:24, David Wang, ITW, Standard Operation, TM2, , TM2 ITW 
TM2 was moved and connected in ITW yesterday afternoon. After roughing down, ITW turbo pumps are started. ITW TP4 can not be started to full speed. ISAC
ops kept it at low speed mode with less than 1.0A current draw on pump. ITW IG1s shows red as well. I will take a look on them today when beam is off.
 
Entry  Wednesday, May 24, 2017, 08:11, David Wang, ITW, Standard Operation, TM2, , TH schedule 132 update weekly Target_Hall_shedule_132_Apr_to_Sep.mppTarget_Hall_shedule_132_Apr_to_Sep.pdf
See attachments.
Entry  Tuesday, June 13, 2017, 09:57, Travis Cave, ITW, Standard Operation, TM2, SiC#36, module moved 
TM#2 with SiC#36 has been moved from the conditioning station to the west target station.
Entry  Tuesday, June 13, 2017, 13:41, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected in ITW. 
Yasmine and I connected TM2 in ITW today. the control page is set to febiad mode. Both gas line in ITW are opened for febiad run. All connections are
double checked. Module connection checklist is finished.  All turbo pumps are started now. Everything is good so far. The TM2 is ready for conditioning
when the ITW vacuum is good enough.
Entry  Wednesday, August 02, 2017, 15:09, David Wang, ITW, Standard Operation, TM2, , TM2 was disconnencted in ITW yesterday. 
Tm2 was disconnected in ITW yesterday. ITW EL cable crimp ring was broken. John Chow replaced this ring this afternoon.
Entry  Tuesday, August 08, 2017, 13:26, Travis Cave, ITW, Standard Operation, TM2, Ta#53, module moved 
TM#2 with Ta#53 has been moved from the conditioning station to the west target station.
    Reply  Tuesday, August 15, 2017, 09:30, Anders Mjos, ITW, Standard Operation, TM2, Ta#53, TM2 radiation fields 


    
        
            Travis Cave wrote:
        
        
            
            TM#2 with Ta#53 has been moved from the conditioning station to the west target station.
Entry  Tuesday, October 03, 2017, 09:29, Travis Cave, ITW, Standard Operation, TM2, Ta#54, Module move 
 TM#2 with Ta#54 has been moved from the conditioning station to the west target station.
Entry  Thursday, October 05, 2017, 11:04, Anders Mjos, ITW, Maintenance, , , Installation of new valve for module move ventilation 
David installed the new ball valve and connections for the SAS project module move ventilation. SASP0482. Drawing reference ISK5029B.