ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  1949   Wednesday, July 10, 2019, 11:59 Carla BabcockConditioning StationRepairTM4Dummy HP SIS targetConditioning TM4 w/ new ST up to 50kVDavid raised the bias to 49.5kV. Module
is still sparking mainly on top. Humidity
is super high.
  
  1958   Tuesday, August 06, 2019, 01:13 Carla BabcockConditioning StationRepairTM4Dummy HP SIS targetChecks on EE line leak fix and window line leak (not fixed)TM4 has developed 4 leaks so far:

    Line B - seems to be solved
with an indium gasket (some testing already
  
  264   Thursday, March 14, 2013, 10:04 Bevan MossConditioning StationStandard OperationTM4CS Test Target 1Cooling Package Started The cooling package was started at
10:00 today. See attached picture. There
is another snap shot at 10:03.
 Cooling_system_start.JPGCooling_System_start_3_min.JPG 
  266   Thursday, March 14, 2013, 11:56 Bevan MossConditioning StationStandard OperationTM4CS Test Target 1Cooling Package Started

    

       
            
 Cooling_package_1155.JPG 
  235   Friday, January 18, 2013, 09:10 Travis CaveSouth Hot-CellStandard OperationTM4CS Test Target #1Electrical checkElectrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details.
 CS_Test_Target_#1_Elec_check.PDF 
  236   Friday, January 18, 2013, 11:15 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with the test target #1 is now in
the conditioning station, move went well.
  
  242   Wednesday, February 06, 2013, 14:34 Bevan MossConditioning StationDevelopmentTM4CS Test Target #140kV All Common w/o Water Test Today the module was biased to 40kV
in the conditioning station. The current
draw was 0uA. Sparking started at 27 kV.
 40kV_no_water_HV_test.JPG 
  246   Friday, February 22, 2013, 13:02 Bevan MossConditioning StationDevelopmentTM4CS Test Target #1HV test with Water Hello Ray and Yi
Completed a HV test with the water
flowing today.
 vacuum_for_40k.JPG 
  247   Friday, February 22, 2013, 13:13 Bevan MossConditioning StationDevelopmentTM4CS Test Target #1Broken Turbo Pump Today while putting the cover on
the cord that goes to the controller was
bumped. This bent the connector down and
 IMG_0528.JPG 
  249   Tuesday, February 26, 2013, 13:24 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with CS Test Target #1 (dummy target)
moved from the conditioning station to the
east target station. Move went well.
  
  255   Friday, March 08, 2013, 15:50 Bevan MossITEStandard OperationTM4CS Test Target #1Module Move from ITE to SHC Today David and I moved the module
from ITE to the SHC. Move went very smoothly,
David operated the cameras and has had basic
  
  260   Wednesday, March 13, 2013, 14:31 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Module Move TM4 with CS Test Target #1 was moved
from the SHC to the Conditioning Station.
All went well. The welding cables came a
  
  261   Wednesday, March 13, 2013, 15:26 Bevan MossConditioning StationDevelopmentTM4CS Test Target #1Roughing Started Roughing pumps were turned on at
15:23 13/03/2013.
  
  265   Thursday, March 14, 2013, 11:25 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Turbos Started Turbos started at 11:14. TP1S achieved
full speed in less than 2 minutes. TP1 and
2 tripped at 9 minutes. Restarted and reached
 turbo_started_1115.JPGvacuum_running_1124.JPG 
  267   Monday, March 18, 2013, 12:03 Bevan MossConditioning StationRepairTM4CS Test Target #1Turbo Pump 1 Failure and Venting Over the weekend Turbo pump one failed.
It was attempted to restart the turbo in
soft start but that also failed. Although
  
  268   Monday, March 18, 2013, 12:39 Bevan MossConditioning StationRepairTM4CS Test Target #1TGHT PS FailureThe Model of the Power
Supply (PS) is TSQLG 480-20/1500 and serial
number is 2755.02.01.01.09. 
 IMG_0529.JPG 
  269   Monday, March 18, 2013, 15:28 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Vented With Argon The conditioning station has been
vented with argon. Time taken is not known
but it is less than 3 hours. See attached
 Vented_with_Argon.JPG 
  270   Tuesday, March 19, 2013, 09:55 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Turbo pump 1 replaced roughing started David replaced the broken turbo pump
this morning and I have started roughing
at 9:54.
  
  271   Tuesday, March 19, 2013, 13:49 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Tubros Started Turbo Pumps have been started and
are in normal operation. TP1 which has recently
been replaced was started in soft start and
  
  275   Monday, March 25, 2013, 09:35 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Cooling Package and Vacuum Stopped The cooling package and vacuum was
stopped today at 9:26 so the module can be
move.
  