Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1096     Entry time: Thursday, October 08, 2015, 14:08
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: Dummy target febiad. 
Subject: TM3 has been moved from SHC to NW silo 

Bill and I moved TM3 from SHC to NW silo with a dummy febiad target installed on it. The move is smooth.

ELOG V2.9.2-2455