1949
|
Wednesday, July 10, 2019, 11:59 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | Conditioning TM4 w/ new ST up to 50kV | David raised the bias to 49.5kV. Module
is still sparking mainly on top. Humidity
is super high. |
|
|
1958
|
Tuesday, August 06, 2019, 01:13 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | Checks on EE line leak fix and window line leak (not fixed) | TM4 has developed 4 leaks so far:
Line B - seems to be solved
with an indium gasket (some testing already |
|
|
264
|
Thursday, March 14, 2013, 10:04 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target 1 | Cooling Package Started | The cooling package was started at
10:00 today. See attached picture. There
is another snap shot at 10:03. |
![Cooling_system_start.JPG Cooling_system_start.JPG](attachment.png) |
|
266
|
Thursday, March 14, 2013, 11:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target 1 | Cooling Package Started |
|
|
|
235
|
Friday, January 18, 2013, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | CS Test Target #1 | Electrical check | Electrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details. |
|
|
236
|
Friday, January 18, 2013, 11:15 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move | TM#4 with the test target #1 is now in
the conditioning station, move went well. |
|
|
242
|
Wednesday, February 06, 2013, 14:34 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | 40kV All Common w/o Water Test | Today the module was biased to 40kV
in the conditioning station. The current
draw was 0uA. Sparking started at 27 kV. |
|
|
246
|
Friday, February 22, 2013, 13:02 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | HV test with Water | Hello Ray and Yi
Completed a HV test with the water
flowing today. |
|
|
247
|
Friday, February 22, 2013, 13:13 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | Broken Turbo Pump | Today while putting the cover on
the cord that goes to the controller was
bumped. This bent the connector down and |
|
|
249
|
Tuesday, February 26, 2013, 13:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move | TM#4 with CS Test Target #1 (dummy target)
moved from the conditioning station to the
east target station. Move went well. |
|
|
255
|
Friday, March 08, 2013, 15:50 |
Bevan Moss | ITE | Standard Operation | TM4 | CS Test Target #1 | Module Move from ITE to SHC | Today David and I moved the module
from ITE to the SHC. Move went very smoothly,
David operated the cameras and has had basic |
|
|
260
|
Wednesday, March 13, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Module Move | TM4 with CS Test Target #1 was moved
from the SHC to the Conditioning Station.
All went well. The welding cables came a |
|
|
261
|
Wednesday, March 13, 2013, 15:26 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | Roughing Started | Roughing pumps were turned on at
15:23 13/03/2013. |
|
|
265
|
Thursday, March 14, 2013, 11:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Turbos Started | Turbos started at 11:14. TP1S achieved
full speed in less than 2 minutes. TP1 and
2 tripped at 9 minutes. Restarted and reached |
![turbo_started_1115.JPG turbo_started_1115.JPG](attachment.png) |
|
267
|
Monday, March 18, 2013, 12:03 |
Bevan Moss | Conditioning Station | Repair | TM4 | CS Test Target #1 | Turbo Pump 1 Failure and Venting | Over the weekend Turbo pump one failed.
It was attempted to restart the turbo in
soft start but that also failed. Although |
|
|
268
|
Monday, March 18, 2013, 12:39 |
Bevan Moss | Conditioning Station | Repair | TM4 | CS Test Target #1 | TGHT PS Failure | The Model of the Power
Supply (PS) is TSQLG 480-20/1500 and serial
number is 2755.02.01.01.09. |
|
|
269
|
Monday, March 18, 2013, 15:28 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Vented With Argon | The conditioning station has been
vented with argon. Time taken is not known
but it is less than 3 hours. See attached |
|
|
270
|
Tuesday, March 19, 2013, 09:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Turbo pump 1 replaced roughing started | David replaced the broken turbo pump
this morning and I have started roughing
at 9:54. |
|
|
271
|
Tuesday, March 19, 2013, 13:49 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Tubros Started | Turbo Pumps have been started and
are in normal operation. TP1 which has recently
been replaced was started in soft start and |
|
|
275
|
Monday, March 25, 2013, 09:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Cooling Package and Vacuum Stopped | The cooling package and vacuum was
stopped today at 9:26 so the module can be
move. |
|