  1474   Tuesday, April 04, 2017, 10:23 David WangConditioning StationStandard OperationTM4 Helium pressure leak check on TM4 Ta(-) water lines

This morning, The helium pressure leak check on TM4 Ta(-) is done after TM4 finished conditioning yesterday.  LD base LR:8.0XE-9 atm.cc/sec, base pressure: 0.0XE-4 torr. Applied 70 psi helium to TM4 TA(-) water line. The LR slowly climbed to 2.2XE-7 atm.cc/sec, and stopped there. Waited for 5 minutes and change at 2.2 X E-7 atm.cc/sec.

  1473   Tuesday, April 04, 2017, 09:29 Travis CaveITEStandard OperationTM4UC#19module moved

TM#4 with UC#19 has been moved from the conditioning station to the east target station.

  1472   Thursday, March 30, 2017, 11:21 David WangConditioning StationRepairTM4 Leak check on TM4 Ta(-) water lines in service cap

Leak check on TM4 Ta(-) water lines in service cap is done. LD base LR after 50minutes pumping down:0.0xE-9 atm.cc/sec. base pressure: 0.0XE-4 torr. I sprayed lots helium on welding stems on Ta(-) line in service cap including stems in blue nylon insulator and stems to service tray.  no any response has been foun on LD. The Ta(-) line in service cap is leak free.

 Totally panel open and leak check time is about 12minutes. Argon vented TCS before leak check this morning. 

  1471   Wednesday, March 29, 2017, 14:11 David WangConditioning StationStandard OperationTM4 small leak on TM4 Ta(-) water line.

A small leak has been found on TM4 Ta(-) which is marked as "B" on terminal blocks. The LD base Leak rate is 1.2XE-8 atm.cc/sec. 70psi helium has been applied to Ta(-) water line for 3minutes. The leak rate went up to 2.5xE-6 atm.cc/sec and stabilized there. Anders found a helium response on RGA helium reading during the same time. This confirms the leak is real. Other lines are leak checked today also. They are good still. All TM4 water lines were leak checked in ITE in 2017 January. They  were all good at 0.0 X E-9 atm.cc/sec. See attachment e-log.

Attachment 1: TM4_2017_leak_check_in_ITE.png
TM4_2017_leak_check_in_ITE.png
  1470   Wednesday, March 29, 2017, 11:42 Anders MjosConditioning StationStandard OperationTM4UC#19Conditioning UC#19

 Wednesday, March 29, 2017, 11:37: RGA on

Wednesday, March 29, 2017, 13:51: Water package on


Thursday, March 30, 2017, 08:50: Restarted chiller. OP3 fault on both VFDs.

Thursday, March 30, 2017, 10:18: Roughing

Thursday, March 30, 2017, 16:02: Configured EE to conditioning mode. All power supplies for SIS operation was checked to be working earlier.

Thursday, March 30, 2017, 16:06: BIAS / EL 10 / 5 kV and 0.02 / 0.04 mA

Thursday, March 30, 2017, 16:10: BIAS / EL210 / 10 kV and 0.03 / 0.06 mA

Thursday, March 30, 2017, 16:11: IG1 at 7.8E-7 T, IG2 at 2.3E-6 T

Thursday, March 30, 2017, 16:21: No sparking. Ramping down for the day


Friday, March 31, 2017, 08:32: BIAS / EL 20 / 10 kV and 0.03 / 0.06 mA

Friday, March 31, 2017, 08:32: IG1 at 4.2E-7 T, IG2 at 1.4E-6 T

Friday, March 31, 2017, 08:45: BIAS / EL 25 / 12.5 kV and 0.04 / 0.08 mA. Some minor vacuum responses around 24 kV

Friday, March 31, 2017, 10:03: BIAS current was limiting at 26 kV after EPICS restart. Updated limit

Friday, March 31, 2017, 10:10: BIAS / EL 30 / 15 kV and 0.04 / 0.09 mA. Vacuum and current responses when increasing BIAS.

Friday, March 31, 2017, 10:54: BIAS / EL 35 / 17.5 kV and 0.05 / 0.10 mA.

Friday, March 31, 2017, 11:24: BIAS / EL 40/ 20 kV and 0.05 / 0.11 mA.

Friday, March 31, 2017, 11:43: BIAS / EL 45/ 22.5 kV and 0.06 / 0.13 mA.

 Friday, March 31, 2017, 13:47: No sparks for ~90 min. Ramping down HV

Friday, March 31, 2017, 13:58: Starting auto-ramping heaters to 100 / 100 A at 1 A/min. Good/bad vacuum at 3E-6 and 5E-6 T on IG2. EE to 1500 V

Friday, March 31, 2017, 14:03: BIAS / EL / EE at 30 / 15 / 1.5 kV and 0.04 / 0.09 / 1.5 mA


Saturday, April 01, 2017, 10:58: Continue auto-ramping to 440 A / 200 A.

Saturday, April 01, 2017, 17:17: IG1 / IG2 to 1.7E-6 and 3.6E-6 T at 440 A. Reduced manually to 430 A to limit outgassing.

Saturday, April 01, 2017, 18:03: Discovered TP2 had tripped off. Likely causing "increased outgassing" above.

Saturday, April 01, 2017, 18:12: TP2 back at speed.

Saturday, April 01, 2017, 23:25 : TP2 fault from spark. Restarting. Ramping down heaters.


Sunday, April 02, 2017, 06:45: Found source to be tripped on water flow TGHT at around 1:15 am. Vacuum and water flow otherwise ok. Set source to 0. To be investigated Monday. 


Monday, April 03, 2017, 11:05: The paddle wheel on the TGHT line was not turning this morning. After running water through a bypass an reconnecting to the module, flow was restored, but it appeared to be at a relatively low rate.

Monday, April 03, 2017, 12:00: BIAS / EL / EE at 30 / 15 / 1.5 kV and 0.03 / 0.09 / 1.5 mA

Monday, April 03, 2017, 12:18: Tested TGHT / TBHT to 20 / 10 A.

Monday, April 03, 2017, 12:18: Increased EE to 2 kV and 2.0 mA

Attachment 1: UC#19.docx
Attachment 2: TCS-2017-03-29_UC#19.rga
Attachment 3: TCS-2017-03-30_UC#19.rga
Attachment 4: TCS-2017-04-03_UC#19.rga
  1469   Tuesday, March 28, 2017, 10:44 chad fisherSouth Hot-CellStandard OperationTM4UCx#19UCx#19 Installed

UCx#19 has been installed onto TM4. High current fasteners torqued to 130 in lbs. Has been leak and electrical checked and is ready to leave hot cell.

  1468   Tuesday, March 28, 2017, 10:30 Travis CaveSouth Hot-CellStandard OperationTM4UC#19Electrical Check

Electrical check done on TM#4 with UC#19. See attached PDF for results.

Attachment 1: TM4__UC19_SHC.PDF
TM4__UC19_SHC.PDF
  1467   Tuesday, March 28, 2017, 09:18 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moved

TM#4 has been moved from the conditioning station to the south hot cell.

  1466   Monday, March 27, 2017, 13:40 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check

Did the start of the running year electrical checks of both TM#2 and TM#4 with no target attached to either module. TM#2 was in the south hot cell and TM#4 is in the conditioning station under vacuum.

Attachment 1: TM2__No_Tgt.PDF
TM2__No_Tgt.PDF
Attachment 2: TM4__No_Tgt.PDF
TM4__No_Tgt.PDF
  1465   Monday, March 27, 2017, 12:55 David WangSpent Target VaultRepair  S/W silo rust clean up

Rust on S/W silo and cover plate stored at silo area are cleaned up.

Attachment 1: rust_removal_at_sw_silo_001.JPG
rust_removal_at_sw_silo_001.JPG
Attachment 2: rust_removal_at_sw_silo_002.JPG
rust_removal_at_sw_silo_002.JPG
Attachment 3: rust_removal_at_sw_silo_003.JPG
rust_removal_at_sw_silo_003.JPG
Attachment 4: rust_removal_at_sw_silo_004.JPG
rust_removal_at_sw_silo_004.JPG
Attachment 5: rust_removal_at_sw_silo_005.JPG
rust_removal_at_sw_silo_005.JPG
  1464   Monday, March 27, 2017, 06:33 David WangITEStandard Operation  ITE clean up

ITE clean up is done.  HV cage inside is wiped.

  1463   Friday, March 24, 2017, 13:21 Travis CaveSpent Target VaultStandard Operation 2A window2A window has been removed from the vault.

2A window has been removed from the vault and moved over the cyclotron vault tunnels.  Attached is the updated storage vault list.

Attachment 1: Vault_Storage_March_24_2017.pdf
Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf
  1462   Friday, March 24, 2017, 11:19 Keith C NgSpent Target VaultStandard Operation 2A3 windowWindow now in vault

Travis Cave wrote:

The 2A3 window now has a lid, and lift yolk on it and it has been installed in the spent target vault in spot 2A. The lid is a normal unmodified and has no sealant on it.

The pail containing window was transferred from the Storage Vault to the Cyclotron Vault Tunnel Storage 2017 Mar 24. It was placed in a brick bunker along the north wall and marked with item #1434. RPG storage form is attached.

Highest field measured at 0.5 m was 3000 uSv/h with an estimate of 4000 uSv/h on contact with the pail. Pail exterior was not contaminated. See attached storage form for details.

 

Attachment 1: 2017mar24_vault_tunnel_storage_form(1).pdf
2017mar24_vault_tunnel_storage_form(1).pdf
  1461   Friday, March 24, 2017, 11:12 Keith C NgSpent Target VaultStandard Operation  2A window transfer

Transfered the 2A window from the ISAC Storage Vault to the Cyclotron Vault Tunnel Storage area. RPG storage form attached.

Attachment 1: 2017mar24_vault_tunnel_storage_form(1).pdf
2017mar24_vault_tunnel_storage_form(1).pdf
  1460   Thursday, March 23, 2017, 11:42 David WangConditioning StationMaintenanceTM4 TM4 Sevice cap rust are cleaned out.

TM4 service cap rust are cleaned out at TCS. All top surface of TM4 are wiped and cleaned . The module looks good now. see attachments

Attachment 1: TM4_clean_up_at_TCS_006.JPG
TM4_clean_up_at_TCS_006.JPG
Attachment 2: TM4_clean_up_at_TCS_007.JPG
TM4_clean_up_at_TCS_007.JPG
Attachment 3: TM4_clean_up_at_TCS_002.JPG
TM4_clean_up_at_TCS_002.JPG
Attachment 4: TM4_clean_up_at_TCS_008.JPG
TM4_clean_up_at_TCS_008.JPG
Attachment 5: TM4_clean_up_at_TCS_005.JPG
TM4_clean_up_at_TCS_005.JPG
  1459   Thursday, March 23, 2017, 11:22 Grant MinorCraneMaintenance  Target Hall crane 20 ton hoist noise / smell - inspection by Gordon Crane & Hoist

Strange noise and a burning brake type smell was observed yesterday by David and Anders when running the main 20 ton hoist locally.  A service call was arranged today with Gordon Crane.  No major issues were found.  A more detailed summary is in the attached e-mail correspondence.  Gordon Crane will issue a formal report, but they recommend replacing both sets of brake disks and brake calipers. - Grant

Attachment 1: Target_Hall_crane_main_hoist_problem_-_A_Mjos_-_22_Mar_2017.pdf
Target_Hall_crane_main_hoist_problem_-_A_Mjos_-_22_Mar_2017.pdf
Attachment 2: Update_-_Target_Hall_20T_Hoist_Inspection_-_G_Minor_-_23_Mar_2017.pdf
Update_-_Target_Hall_20T_Hoist_Inspection_-_G_Minor_-_23_Mar_2017.pdf Update_-_Target_Hall_20T_Hoist_Inspection_-_G_Minor_-_23_Mar_2017.pdf Update_-_Target_Hall_20T_Hoist_Inspection_-_G_Minor_-_23_Mar_2017.pdf
Attachment 3: Re__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf
Re__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf Re__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf Re__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf Re__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf
  1458   Thursday, March 23, 2017, 09:30 Travis CaveSouth Hot-CellStandard OperationTM2test targetElectrical Check

Electrical check of the Ta test target on TM#2

Attachment 1: TM2_Ta_Dummytgt_Preandpost.PDF
TM2_Ta_Dummytgt_Preandpost.PDF TM2_Ta_Dummytgt_Preandpost.PDF
  1457   Wednesday, March 22, 2017, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2test targetmodule moved

TM#2 has been moved from the east target station to the south hot cell.

  1456   Tuesday, March 21, 2017, 11:59 David WangConditioning StationRepairTM4 Rust inpsection on TM4 service cap inside surface and shielding plug surface.

Yasmine and I did a rust inpsection on TM4 service cap inide surface and shielding plug surface. No rust has been found. Also, all steel bolts on this surface look fine. The inside of silo held this module are rust free as well.  See attachments

Attachment 1: TM4_rust_inspection_003.JPG
TM4_rust_inspection_003.JPG
Attachment 2: TM4_rust_inspection_004.JPG
TM4_rust_inspection_004.JPG
Attachment 3: TM4_rust_inspection_005.JPG
TM4_rust_inspection_005.JPG
Attachment 4: TM4_rust_inspection_008.JPG
TM4_rust_inspection_008.JPG
Attachment 5: TM4_rust_inspection_009.JPG
TM4_rust_inspection_009.JPG
Attachment 6: TM4_rust_inspection_011.JPG
TM4_rust_inspection_011.JPG
Attachment 7: TM4_rust_inspection_019.JPG
TM4_rust_inspection_019.JPG
Attachment 8: TM4_rust_inspection_021.JPG
TM4_rust_inspection_021.JPG
Attachment 9: TM4_rust_inspection_022.JPG
TM4_rust_inspection_022.JPG
Attachment 10: TM4_rust_inspection_023.JPG
TM4_rust_inspection_023.JPG
Attachment 11: TM4_rust_inspection_024.JPG
TM4_rust_inspection_024.JPG
  1455   Tuesday, March 21, 2017, 10:06 Travis CaveConditioning StationStandard OperationTM4no targetmodule moved

TM#4 has been moved from the SW Silo to the conditioning station.