Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
RH-ISAC |
Not logged in |
 |
|
Message ID: 1530
Entry time: Tuesday, May 09, 2017, 12:45
|
Author: |
David Wang |
Category: |
Conditioning Station |
Type: |
Repair |
Module: |
TM3 |
Target/Number: |
|
Subject: |
TM3 service tray side panel is cleaned and installed back to TM3 |
|
|
TM3 service tray side panel is cleaned and installed back to TM3 this morning. I visually inspected service tray insulators. Nothing is changed comparing to inspection before.Nine screws are installed on panel to hold it onto TM3. |
|
|
|