Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1530     Entry time: Tuesday, May 09, 2017, 12:45
Author: David Wang 
Category: Conditioning Station 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: TM3 service tray side panel is cleaned and installed back to TM3 

TM3 service tray side panel is cleaned and installed back to TM3 this morning. I visually inspected service tray insulators. Nothing is changed comparing to inspection before.Nine screws are installed on  panel to hold it onto TM3.

Attachment 1: TM3_service_tary_side_panel_005.JPG  1.808 MB  | Show | Hide all
Attachment 2: TM3_service_tary_side_panel_001.JPG  1.369 MB  | Show | Hide all
Attachment 3: TM3_service_tary_side_panel_004.JPG  1.603 MB  | Show | Hide all
ELOG V2.9.2-2455